Mechanical / HVAC Permit in Glendale, Arizona

Mechanical and HVAC work in Glendale is governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC, with Appendices A and B) as adopted by Ordinance O25-51, effective January 9, 2026. Residential mechanical permits are applied for using the Permit/Plan Review Application (Residential 2026). Glendale charges mechanical permit fees on a per-item basis (base fee plus counts of air handlers, furnaces, evaporative coolers, vents, etc.).

Verified 2026-06-29 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Mechanical permit — base fee$29.79 base feeCity of Glendale Fee Schedule, Residential Fees — Mechanical Permit: Base Permit Fee (effective May 10, 2019).
Air handlers$13.48 eachCity of Glendale Fee Schedule — Mechanical Permit: Air Handlers (effective May 10, 2019).
Evaporative coolers$13.48 eachCity of Glendale Fee Schedule — Mechanical Permit: Evaporative Coolers (effective May 10, 2019).
Furnaces (100K BTU or less)$18.76 eachCity of Glendale Fee Schedule — Mechanical Permit: Furnaces 100K BTU or less (effective May 10, 2019).
Furnaces (over 100K BTU)$23.04 eachCity of Glendale Fee Schedule — Mechanical Permit: Furnaces over 100K BTU (effective May 10, 2019).
All-in-one HVAC (package unit)$13.48 eachCity of Glendale Fee Schedule — Mechanical Permit: All-in-one HVAC (effective May 10, 2019).
Vent fans and appliance vents$9.19 eachCity of Glendale Fee Schedule — Mechanical Permit: Vent Fans and Appliance Vents (effective May 10, 2019).
Repairs/additions to existing equipment$17.35City of Glendale Fee Schedule — Mechanical Permit: Repairs/additions to existing equipment (effective May 10, 2019).
Plan review — Mechanical75% of the mechanical permit fee (minimum $122.88)City of Glendale Fee Schedule, Residential Fees — Mechanical Plan Review (effective May 10, 2019).

Review timeline

~110 business days

Typical estimate — confirm current times with the Glendale building department

Inspection process

  1. 1

    Rough Mechanical

    Before insulation and drywall; all ductwork and mechanical rough-in inspected before concealment

  2. 2

    Final Mechanical

    After all equipment is installed and system is operational

Tips

Frequently asked questions

Do I need a permit to replace my HVAC unit in Glendale?
Yes. An HVAC change-out requires a mechanical permit. The fee is $29.79 base plus $13.48 for an all-in-one package unit (or $18.76/$23.04 for furnaces). Source: City of Glendale Fee Schedule (effective May 10, 2019).

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Glendale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Glendale

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.