Accessory Dwelling Unit (ADU) Permit — Gilbert, Arizona · Requirements sheet
Verified 2026-07-16 · Source: https://www.gilbertaz.gov/departments/development-services
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Permit in Gilbert, Arizona
Accessory Dwelling Units in the Town of Gilbert are regulated under Land Development Code Section 5.2.3. Each lot may have one (1) detached ADU and one (1) attached ADU; parcels over one acre may have an additional detached ADU if it is a restricted-affordable unit. ADU must be less than 75% of the primary dwelling's gross square footage. ADUs 1,000 SF and under go directly through Building Permits (OneStopShop); ADUs over 1,000 SF require an Administrative Use Permit through Planning first, then a Building Permit. Applications at onestopshop.gilbertaz.gov.
Verified 2026-07-16 · Source
When you need this permit
- Submit through OneStopShop portal at onestopshop.gilbertaz.gov
- ADU must be less than 75% of the primary dwelling's gross square footage
- ADUs ≤ 1,000 SF: Building Permit only through OneStopShop
- ADUs > 1,000 SF: Administrative Use Permit through Planning first, then a Building Permit
- Each lot limited to one (1) detached ADU and one (1) attached ADU; additional detached ADU allowed on parcels >1 acre if restricted-affordable
- Architectural articulation is required
- Soils report required unless subdivision has one on file or a signed soils report waiver is provided (call 480-503-6700)
- All utility services for ADU must come from the primary structure's utility connections (a private in-line meter is allowed but is not read by the utility company)
- Separate address for ADU may be requested but is not required
- Accessory structures over 200 SF require a Building Permit (but not a Use Permit)
- HOA/CC&R approval may be required in addition to Town permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Slab Inspection
Inspection of foundation and slab before pouring concrete
- 2
Rough Framing / Systems Inspection
Framing, rough plumbing, mechanical, and electrical inspections
- 3
Final Inspection
Final inspection confirming ADU complete and ready for occupancy
See the full Gilbert inspection guide — scheduling & re-inspection fees →
Tips
- ADUs ≤ 1,000 SF go directly through Building Permits (no Planning approval needed). ADUs > 1,000 SF need an Administrative Use Permit from Planning first ($1,000 fee).
- The ADU must be less than 75% of the primary dwelling's gross square footage.
- Utility connections: ADU utility services must come from the primary structure's connections. A private in-line meter is allowed but is not read by the utility company.
- Architectural articulation is a required design element — confirm requirements with Development Services.
- A separate address is possible for the ADU but not required.
- Check HOA and CC&R requirements in addition to Town permits — HOA approval may be needed.
- Accessory structures (non-ADU) over 200 SF require a Building Permit (no Use Permit needed).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gilbert building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Gilbert
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Arizona →
Look up this fee in a different city →