Plumbing Permit in Gilbert, Arizona

Required for installation, alteration, repair, and replacement of plumbing systems in the Town of Gilbert. Governed by the 2018 IPC with Town of Gilbert amendments (Code Chapter 10-31). Like-for-like replacements by AZ licensed contractors may qualify for OTC review. Like-for-like water heater replacements (storage-tank type, not tankless conversions) by Arizona licensed contractors are exempt from permit per IBC §105.2 item 16.

Verified 2026-07-16 · Source

When you need this permit

  • Submit through OneStopShop portal at onestopshop.gilbertaz.gov
  • Arizona ROC-licensed plumbing contractor required (owner-builder exemptions may apply for owner-occupied residential) Owner-builderContractor
  • Work must comply with 2018 IPC as amended by Town of Gilbert Technical Codes 2020 Edition
  • Like-for-like replacements of storage-tank water heaters and HVAC by AZ licensed contractors are exempt from permit (IBC §105.2 item 16 / IRC Plumbing item 3) Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Individual Plumbing Permit (Residential) — flat feeSource: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees — Individual Plumbing Permit, Residential, effective July 1, 2025, Resolution 4563.
$150
Individual Plumbing Permit (Commercial) — flat feeSource: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees — Individual Plumbing Permit, Commercial, effective July 1, 2025, Resolution 4563.
$300
Building Permit Fee — valuation-based (for larger plumbing projects)Source: Town of Gilbert Development Services Fee Schedules (doc 5883), Building Permit and Plan Review Fees Table, effective July 1, 2025, Resolution 4563.
Same valuation-based table as building permits; $50.00 minimum for work valued $1.00–$1,100.00
Plan Review Fee (where plan review is required)Source: Town of Gilbert Development Services Fee Schedules (doc 5883), effective July 1, 2025, Resolution 4563.
65% of the calculated Building Permit Fee
Re-inspection FeeSource: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees, effective July 1, 2025, Resolution 4563.
$150

Review timeline

Plan reviewGilbert’s published plan-review target
3–3 business days

How long did your Plumbing Permit permit actually take in Gilbert?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Plumbing Inspection

    Inspection of plumbing rough-in before covering or concealment, and before fixtures or appliances are set (per IRC §R109.1.2 as amended)

  2. 2

    Final Plumbing Inspection

    Final inspection confirming all plumbing work complete and compliant

See the full Gilbert inspection guide — scheduling & re-inspection fees →

Tips

  • Like-for-like storage-tank water heater replacements by an Arizona licensed contractor are exempt from permit (IBC §105.2 item 16 as locally amended). Conversions to tankless systems are not covered by this exemption. Contractor
  • Nonpotable water, rainwater collection, reclaimed water, and subsurface irrigation system provisions (IPC §P2910–P2913, P3009) are deleted in their entirety by Gilbert's local amendments.
  • Commercial electric, plumbing, and mechanical permit reviews have a 3/3 working-day goal.
  • Individual flat-fee plumbing permits: $150 residential, $300 commercial (adopted July 1, 2025).

Frequently asked questions

Not if it is a like-for-like replacement of a storage-tank water heater performed by an Arizona licensed contractor — this is exempt per Gilbert's local amendment to IBC §105.2 (item 16). Converting from tank to tankless requires a permit.

In Gilbert, the published Individual Plumbing Permit (Residential) — flat fee is: $150. Additional published fees: Individual Plumbing Permit (Commercial) — flat fee — $300; Building Permit Fee — valuation-based (for larger plumbing projects) — Same valuation-based table as building permits; $50.00 minimum for work valued $1.00–$1,100.00; Plan Review Fee (where plan review is required) — 65% of the calculated Building Permit Fee; Re-inspection Fee — $150. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Gilbert's published plan-review target for a plumbing permit is 3–3 business days.

You'll need: Plumbing Permit Application. Depending on your project, Gilbert may also ask for: Plumbing Plans. See the required-documents checklist on this page for details on each.

Gilbert requires 2 inspection(s) for a plumbing permit, in order: Rough Plumbing Inspection, Final Plumbing Inspection. Schedule each through Town of Gilbert Development Services Department — Plan Review and Inspection Division ((480) 503-6700).

Apply through Town of Gilbert Development Services Department — Plan Review and Inspection Division at 90 E. Civic Center Drive, Gilbert, AZ 85296. Phone: (480) 503-6700, email: onestopshop@gilbertaz.gov. Office hours: Monday–Thursday: 7:00 AM–6:00 PM; Friday: Closed (Town Hall operates a 4-day/10-hour week; confirmed live on the Development Services department page 2026-07-16). Official information: https://www.gilbertaz.gov/departments/development-services.

Gilbert, Arizona has adopted: 2018 International Building Code (IBC), with Appendices C, I, and K, and Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739, Town of Gilbert Technical Codes 2020 Edition); 2018 International Residential Code (IRC), with Appendices H, P, and Q, and Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Mechanical Code (IMC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Plumbing Code (IPC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Energy Conservation Code (IECC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Fuel Gas Code (IFGC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Fire Code (IFC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Green Construction Code (IgCC) — voluntary adoption only — effective January 1, 2020 (Ordinance 2739); 2017 National Electrical Code (NEC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2010 ADA Standards for Accessible Design — effective January 1, 2020 (Ordinance 2739); Town of Gilbert Technical Codes 2020 Edition — local amendment overlay (Code of Gilbert Chapter 10, Sections 10-31 and 10-32) incorporating December 2023 amendments per gilbertaz.gov Document 35111. Local amendments apply — see the Gilbert overview page for the full list.