Plumbing Permit in Gilbert, Arizona

Required for installation, alteration, repair, and replacement of plumbing systems in the Town of Gilbert. Governed by the 2018 IPC with Town of Gilbert amendments (Code Chapter 10-31). Like-for-like replacements by AZ licensed contractors may qualify for OTC review. Like-for-like water heater replacements (storage-tank type, not tankless conversions) by Arizona licensed contractors are exempt from permit per IBC §105.2 item 16.

Verified 2026-06-29 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Individual Plumbing Permit (Residential) — flat fee$150Source: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees — Individual Plumbing Permit, Residential, effective July 1, 2025, Resolution 4563.
Individual Plumbing Permit (Commercial) — flat fee$300Source: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees — Individual Plumbing Permit, Commercial, effective July 1, 2025, Resolution 4563.
Building Permit Fee — valuation-based (for larger plumbing projects)Same valuation-based table as building permits; $50.00 minimum for work valued $1.00–$1,100.00Source: Town of Gilbert Development Services Fee Schedules (doc 5883), Building Permit and Plan Review Fees Table, effective July 1, 2025, Resolution 4563.
Plan Review Fee (where plan review is required)65% of the calculated Building Permit FeeSource: Town of Gilbert Development Services Fee Schedules (doc 5883), effective July 1, 2025, Resolution 4563.
Re-inspection Fee$150Source: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees, effective July 1, 2025, Resolution 4563.

Review timeline

33 business days

Gilbert’s published plan-review target

Inspection process

  1. 1

    Rough Plumbing Inspection

    Inspection of plumbing rough-in before covering or concealment, and before fixtures or appliances are set (per IRC §R109.1.2 as amended)

  2. 2

    Final Plumbing Inspection

    Final inspection confirming all plumbing work complete and compliant

Tips

Frequently asked questions

Do I need a permit to replace a water heater in Gilbert?
Not if it is a like-for-like replacement of a storage-tank water heater performed by an Arizona licensed contractor — this is exempt per Gilbert's local amendment to IBC §105.2 (item 16). Converting from tank to tankless requires a permit.

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gilbert building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Gilbert

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.