Solar Photovoltaic (PV) System — Permit Exemption — Gilbert, Arizona · Requirements sheet
Verified 2026-07-16 · Source: https://www.gilbertaz.gov/departments/development-services
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Photovoltaic (PV) System — Permit Exemption in Gilbert, Arizona
Solar photovoltaic systems installed by an Arizona licensed contractor are EXEMPT from permit in the Town of Gilbert per local amendment IBC §105.2 Building item 16 (cross-referenced in IBC Appendix K §K103.2 Exception 7 for electrical). This exemption is explicitly stated in the Town of Gilbert Technical Codes 2020 Edition. If a permit IS required (e.g., for work performed without a licensed contractor or for battery storage systems that may require separate review), the permit fee is calculated from the standard valuation-based Building Permit Fee table; verify with Development Services.
Verified 2026-07-16 · Source
When you need this permit
- If installed by an Arizona licensed contractor: NO PERMIT REQUIRED per IBC §105.2 Building item 16 as locally amended Contractor
- Installer must hold a current Arizona ROC license Contractor
- All electrical work must comply with 2017 NEC as amended by Town of Gilbert Code Chapter 10-32
- If a battery storage system is included, verify with Development Services whether separate review is required
Required documents
Check off what you have — your progress is saved on this device.
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection (if permit required)
Inspection of solar PV electrical connections if a permit is issued
See the full Gilbert inspection guide — scheduling & re-inspection fees →
Tips
- Solar PV systems installed by an Arizona licensed contractor are permit-EXEMPT in Gilbert per IBC §105.2 item 16. This is a significant local departure from the base IBC. Contractor
- The exemption also covers like-for-like replacements of solar water heating systems by AZ licensed contractors. Contractor
- Verify with Development Services at (480) 503-6700 if your system includes battery storage, as this may require separate review.
- Apply for any required permits through OneStopShop at onestopshop.gilbertaz.gov.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gilbert building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Gilbert
Solar Photovoltaic (PV) System — Permit Exemption in other cities
Compare solar photovoltaic (pv) system — permit exemption fees across Arizona →
Look up this fee in a different city →
Now live
Build your Gilbert project checklist
Describe your project once and get every permit, document, and fee it triggers in Gilbert — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →