Swimming Pool / Spa Permit in Gilbert, Arizona

Required for installation of permanent/in-ground swimming pools, spas, and hot tubs in the Town of Gilbert. Note: IBC §3109 (Swimming Pools, Spas, and Hot Tubs) is deleted in its entirety by Gilbert's local amendments — pool permitting is governed under Gilbert's own land development code and relevant sections of the 2018 IBC. Above-ground portable spas and pools have a separate fee. Applications through OneStopShop at onestopshop.gilbertaz.gov. Swimming pools (major misc.) have a 12/8 working-day review goal.

Verified 2026-07-16 · Source

When you need this permit

  • Submit through OneStopShop portal at onestopshop.gilbertaz.gov
  • Arizona ROC-licensed contractor required Contractor
  • Plans must show pool location, setbacks, barrier/fencing, equipment placement, and electrical details
  • Pool barrier/fence requirements apply per adopted code — verify fence height exemptions (Gilbert exempts fences not over 3 feet high from permit; pool barriers may need to meet separate safety requirements)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet — 0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Swimming Pool — Permanent/In-GroundSource: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees — Swimming Pool, Permanent/in ground pools/spas, effective July 1, 2025, adopted by Town Council May 20, 2025 by Resolution 4563.
$300
Portable Above-Ground Pools/SpasSource: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees — Swimming Pool, Portable above ground pools/spas, effective July 1, 2025, Resolution 4563.
$140
Plan Review FeeSource: Town of Gilbert Development Services Fee Schedules (doc 5883), Building Permit and Plan Review Fees Table, effective July 1, 2025, Resolution 4563.
65% of the calculated Building Permit Fee (where applicable)
Re-inspection FeeSource: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees, effective July 1, 2025, Resolution 4563.
$150

Review timeline

Plan reviewGilbert’s published plan-review target
8–12 business days

How long did your Swimming Pool / Spa Permit permit actually take in Gilbert?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Gunite / Pre-Shotcrete Inspection

    Inspection of rebar/steel placement before pool shell is formed

  2. 2

    Plumbing / Mechanical Inspection

    Inspection of pool plumbing, filtration, and mechanical systems

  3. 3

    Electrical / Bonding Inspection

    Inspection of pool electrical bonding and equipment wiring per 2017 NEC

  4. 4

    Barrier / Fence Inspection

    Inspection of required pool barrier/fencing

  5. 5

    Final Inspection

    Final inspection confirming pool complete and all safety requirements met

See the full Gilbert inspection guide — scheduling & re-inspection fees →

Tips

  • Swimming pools (as major miscellaneous) have a 12/8 working-day review goal per Gilbert's published time frames.
  • IBC §3109 (Swimming Pools, Spas, Hot Tubs) is deleted in its entirety by Gilbert's local amendments — contact Development Services for the specific code sections that govern pools.
  • Pool barrier requirements apply separately from the fence permit exemption (fences ≤3 feet exempt from permit). Verify pool safety barrier requirements with Development Services at (480) 503-6700.
  • Permanent pool fee is $300 and portable above-ground pool fee is $140 per the July 1, 2025 adopted fee schedule.

Frequently asked questions

Gilbert requires a swimming pool / spa permit for: Submit through OneStopShop portal at onestopshop.gilbertaz.gov; Arizona ROC-licensed contractor required; Plans must show pool location, setbacks, barrier/fencing, equipment placement, and electrical details; Pool barrier/fence requirements apply per adopted code — verify fence height exemptions (Gilbert exempts fences not over 3 feet high from permit; pool barriers may need to meet separate safety requirements). If your project isn't listed, confirm with Town of Gilbert Development Services Department — Plan Review and Inspection Division at (480) 503-6700 before starting work.

Per the Town of Gilbert Development Services Fee Schedules (doc 5883, effective July 1, 2025, adopted by Resolution 4563 May 20, 2025): $300 for a permanent/in-ground pool or spa; $140 for a portable above-ground pool or spa.

Gilbert's published plan-review target for a swimming pool / spa permit is 8–12 business days.

You'll need: Pool Permit Application; Pool Construction Plans / Site Plan. See the required-documents checklist on this page for details on each.

Gilbert requires 5 inspection(s) for a swimming pool / spa permit, in order: Pre-Gunite / Pre-Shotcrete Inspection, Plumbing / Mechanical Inspection, Electrical / Bonding Inspection, Barrier / Fence Inspection, Final Inspection. Schedule each through Town of Gilbert Development Services Department — Plan Review and Inspection Division ((480) 503-6700).

Apply through Town of Gilbert Development Services Department — Plan Review and Inspection Division at 90 E. Civic Center Drive, Gilbert, AZ 85296. Phone: (480) 503-6700, email: onestopshop@gilbertaz.gov. Office hours: Monday–Thursday: 7:00 AM–6:00 PM; Friday: Closed (Town Hall operates a 4-day/10-hour week; confirmed live on the Development Services department page 2026-07-16). Official information: https://www.gilbertaz.gov/departments/development-services.

Gilbert, Arizona has adopted: 2018 International Building Code (IBC), with Appendices C, I, and K, and Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739, Town of Gilbert Technical Codes 2020 Edition); 2018 International Residential Code (IRC), with Appendices H, P, and Q, and Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Mechanical Code (IMC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Plumbing Code (IPC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Energy Conservation Code (IECC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Fuel Gas Code (IFGC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Fire Code (IFC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Green Construction Code (IgCC) — voluntary adoption only — effective January 1, 2020 (Ordinance 2739); 2017 National Electrical Code (NEC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2010 ADA Standards for Accessible Design — effective January 1, 2020 (Ordinance 2739); Town of Gilbert Technical Codes 2020 Edition — local amendment overlay (Code of Gilbert Chapter 10, Sections 10-31 and 10-32) incorporating December 2023 amendments per gilbertaz.gov Document 35111. Local amendments apply — see the Gilbert overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gilbert building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Property Access

Gilbert's permit history is searchable by address

195,893 permits in our copy of Gilbert's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Gilbert has issued.

All 195,893 carry an issued date, running from 1983 to 2026.

84% of Gilbert's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.

Get Property AccessFree with a signed-in account · the guide above stays free