Skip to main content
PermitBase

Fence / Wall Permit in Gilbert, Arizona

Fences not over 3 feet (914 mm) high are EXEMPT from permit in the Town of Gilbert per local amendment to IBC §105.2 item 2. Fences over 3 feet high require a permit. This is a significant local departure from the base IBC which exempts fences not over 7 feet. Subdivision perimeter walls and non-single-family fences have separate fee categories. Applications through OneStopShop at onestopshop.gilbertaz.gov. Fence permits have a 3/3 working-day review goal.

Verified 2026-07-16 · Source

When you need this permit

  • Fences not over 3 feet (914 mm) high: NO PERMIT REQUIRED per Gilbert's local amendment IBC §105.2 item 2
  • Fences over 3 feet high: permit required via OneStopShop at onestopshop.gilbertaz.gov
  • Arizona ROC-licensed contractor required (verify current ARS requirements with Development Services) Contractor
  • Plans must show fence location, height, materials, and property/setback lines

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet — 0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Walls/Fences — with single-family permitSource: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees — Walls/Fences (a) with single family permit, effective July 1, 2025, adopted by Town Council May 20, 2025 by Resolution 4563.
$120
Walls/Fences — separate permit, single-familySource: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees — Walls/Fences (b) separate permit, single family, effective July 1, 2025, Resolution 4563.
$180
Walls/Fences — separate permit, non-single-familySource: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees — Walls/Fences (c) separate permit, non-single family, effective July 1, 2025, Resolution 4563.
$260
Walls/Fences — subdivision perimeterSource: Town of Gilbert Development Services Fee Schedules (doc 5883), Applied Miscellaneous Building Fees — Walls/Fences (d) Subdivision perimeter, effective July 1, 2025, Resolution 4563.
$700

Review timeline

Plan reviewGilbert’s published plan-review target
3–3 business days

How long did your Fence / Wall Permit permit actually take in Gilbert?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing / Post Inspection

    Inspection of fence footing/post placement before pouring concrete

  2. 2

    Final Fence Inspection

    Final inspection of completed fence

See the full Gilbert inspection guide — scheduling & re-inspection fees →

Tips

  • Gilbert's fence permit exemption is 3 feet (914 mm) — much stricter than the IBC default of 7 feet. Any fence over 3 feet requires a permit.
  • Fence permits have a 3/3 working-day review goal (residential fence/wall on individual lots).
  • Pool barriers may require fences above 3 feet and thus a fence permit even if the fence is associated with a pool permit.

Frequently asked questions

Gilbert requires a fence / wall permit for: Fences not over 3 feet (914 mm) high: NO PERMIT REQUIRED per Gilbert's local amendment IBC §105.2 item 2; Fences over 3 feet high: permit required via OneStopShop at onestopshop.gilbertaz.gov; Arizona ROC-licensed contractor required (verify current ARS requirements with Development Services); Plans must show fence location, height, materials, and property/setback lines. If your project isn't listed, confirm with Town of Gilbert Development Services Department — Plan Review and Inspection Division at (480) 503-6700 before starting work.

In Gilbert, the published Walls/Fences — with single-family permit is: $120. Additional published fees: Walls/Fences — separate permit, single-family — $180; Walls/Fences — separate permit, non-single-family — $260; Walls/Fences — subdivision perimeter — $700. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Gilbert's published plan-review target for a fence / wall permit is 3–3 business days.

You'll need: Fence Permit Application; Site Plan / Plot Plan. See the required-documents checklist on this page for details on each.

Gilbert requires 2 inspection(s) for a fence / wall permit, in order: Footing / Post Inspection, Final Fence Inspection. Schedule each through Town of Gilbert Development Services Department — Plan Review and Inspection Division ((480) 503-6700).

Apply through Town of Gilbert Development Services Department — Plan Review and Inspection Division at 90 E. Civic Center Drive, Gilbert, AZ 85296. Phone: (480) 503-6700, email: onestopshop@gilbertaz.gov. Office hours: Monday–Thursday: 7:00 AM–6:00 PM; Friday: Closed (Town Hall operates a 4-day/10-hour week; confirmed live on the Development Services department page 2026-07-16). Official information: https://www.gilbertaz.gov/departments/development-services.

Gilbert, Arizona has adopted: 2018 International Building Code (IBC), with Appendices C, I, and K, and Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739, Town of Gilbert Technical Codes 2020 Edition); 2018 International Residential Code (IRC), with Appendices H, P, and Q, and Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Mechanical Code (IMC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Plumbing Code (IPC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Energy Conservation Code (IECC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Fuel Gas Code (IFGC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Fire Code (IFC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2018 International Green Construction Code (IgCC) — voluntary adoption only — effective January 1, 2020 (Ordinance 2739); 2017 National Electrical Code (NEC), with Town of Gilbert amendments — effective January 1, 2020 (Ordinance 2739); 2010 ADA Standards for Accessible Design — effective January 1, 2020 (Ordinance 2739); Town of Gilbert Technical Codes 2020 Edition — local amendment overlay (Code of Gilbert Chapter 10, Sections 10-31 and 10-32) incorporating December 2023 amendments per gilbertaz.gov Document 35111. Local amendments apply — see the Gilbert overview page for the full list.

Not over 3 feet (914 mm) high. Gilbert's local amendment to IBC §105.2 item 2 exempts fences not over 3 feet from permit — significantly more restrictive than the standard IBC exemption of 7 feet.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gilbert building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Property Access

Gilbert's permit history is searchable by address

195,893 permits in our copy of Gilbert's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Gilbert has issued.

All 195,893 carry an issued date, running from 1983 to 2026.

84% of Gilbert's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.

Get Property AccessFree with a signed-in account · the guide above stays free