Kingman building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Kingman, Arizona.
Verified 2026-07-07 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 310 North 4th Street, Kingman, AZ 86401
- Phone
- 928-753-8130
- Office hours
- Main Phone 928-753-8130 (Fax 928-753-8579); Building Inspection Line 928-753-8123 — inspection requests must be called in before 7:00 a.m. on the day of the inspection, providing name, permit number, job site address, inspection type, and contact phone number. All submittals and building-related correspondence go to buildingadmin@cityofkingman.gov. Building Official on record: Sean Osterman, CBO, CFM. The Development Services Department is transitioning building permit applications, plan submittals, and Planning & Zoning applications to the new SmartGov online portal beginning April 15, 2026 (https://ci-kingman-az.smartgovcommunity.com/Public/Home), ahead of a required full transition. Source: City of Kingman Permits and Inspections page and Application Submission page.
- Website
- Official site
Inspection sequence
Applies to: Commercial Building Permit
- 1
Foundation/Footing
Before concrete pour; geotechnical soil bearing values verified
- 2
Structural Steel/Framing
Structural connections and framing per approved plans and ASCE/SEI 7-2016-based design criteria
- 3
Rough Electrical/Plumbing/Mechanical
Systems rough-in before wall/ceiling closure
- 4
Fire/Life Safety
Coordinated with the City of Kingman Fire Department under the adopted 2018 IFC
- 5
Final / Certificate of Occupancy
All work complete per approved plans; portable toilet facilities must be removed prior to C of O issuance per the amended KMC Section 5-92
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour
- 2
Framing
Structural framing, connections, and egress per the 2018 IRC and City Design Criteria
- 3
Rough Electrical/Plumbing/Mechanical
Wiring, piping, and ductwork before wall closure
- 4
Final
All work complete per approved plans; utility connections and final grading verified. Schedule via the Building Inspections Hotline (928-753-8123), calling before 7:00 a.m. on the day of the inspection
Applies to: Manufactured Home / Factory-Built Building Permit
- 1
Set/Placement
Verifies foundation/tie-down system and placement location
- 2
Utility Connections
Electrical, water, sewer/septic connections
- 3
Final
Skirting, steps/landings, and final site conditions verified; included within the 3 inspections covered by the base fee
Applies to: Residential Addition / Accessory Structure / Pool Permit
- 1
Foundation/Footing (or pool excavation/steel)
Before concrete pour
- 2
Framing / Bonding (pools)
Structural framing for additions, or electrical bonding and plumbing rough-in for pools
- 3
Final
Completed work verified against approved plans, including pool barrier compliance where applicable
Applies to: Solar Energy Device (Photovoltaic) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before energizing
- 2
Final
Panel mounting, racking attachment, and electrical connections verified per the 2017 NEC as locally amended
Final inspection only: EV Charger / EVSE Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kingman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Kingman building permits
Get alerts for Kingman
We'll email you when Kingman's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.