EV Charger / EVSE Permit in Kingman, Arizona
Electric vehicle charging equipment (EVSE) installation in the City of Kingman is billed under the City's general valuation-based Building Permit Fee — the Development Services Fee Schedule (effective July 1, 2025) has no distinct EV-charger/EVSE line item, unlike its dedicated $220 flat fee for solar energy device systems (per A.R.S. § 9-468). Kingman does not publish a standalone 'Electrical Permit' fee table at all; electrical/trade work of this kind is captured within the graduated Building Permit Fee table (Kingman Municipal Code Ch. 5, Art. I, Sec. 5-2) applied to the applicant-estimated construction valuation, the same mechanism the fee schedule specifies for remodel construction, pools, spas, and signs.
Verified 2026-07-20 · Source
When you need this permit
- Building permit required for EVSE/EV charger installation, submitted through the same permitting channel as other electrical/remodel work (transitioning to the SmartGov portal beginning April 15, 2026)
- No dedicated EVSE application or fee-schedule line item exists; the project valuation is estimated by the permit applicant (per the fee schedule's footnote d, which lists remodel construction, pools, spas, and signs as applicant-estimated valuation categories) and run through the general graduated Building Permit Fee table
- Electrical work must comply with the 2017 NEC as adopted by the City of Kingman with local amendments
- A licensed Arizona electrical contractor is required unless the work qualifies for the A.R.S. § 32-1121(A)(5) owner-builder exemption on a personal owner-occupied residence Owner-builder
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Kingman Development Services Fee Schedule, effective July 1, 2025: the 'Special Permits, Other Inspection Fees, and Appeals' table lists Manufactured Home, Factory-Built Building, and Solar… Show full citationHide
City of Kingman Development Services Fee Schedule, effective July 1, 2025: the 'Special Permits, Other Inspection Fees, and Appeals' table lists Manufactured Home, Factory-Built Building, and Solar energy device systems as the only flat-fee special permit categories — EV chargers/EVSE are not among them, so the general valuation-based fee table applies, using an applicant-estimated valuation the same way the schedule handles remodels, pools, spas, and signsReview timeline
Inspection process
- 1
Final
EVSE circuit, breaker/disconnect, and NEC Article 625 compliance verified against approved plans
See the full Kingman inspection guide — scheduling & re-inspection fees →
Tips
- Kingman prices EV charger installation the same way it prices a remodel, pool, spa, or sign — the applicant estimates the project's construction valuation, which is then run through the general graduated Building Permit Fee table, rather than paying a flat fee like the $220 solar device fee.
- The City's fee schedule PDF is served behind an edge firewall that can block non-browser access; open it in a normal browser if the direct link fails. The fee table above reproduces the schedule's own text.
- Confirm with Development Services (928-753-8130) whether your specific EVSE scope (e.g., a simple circuit addition vs. a service panel upgrade) changes the estimated valuation used for the fee calculation.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kingman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Kingman's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Kingman yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Kingman lands. Privacy.
Other permits in Kingman
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Kingman project checklist
Describe your project once and get every permit, document, and fee it triggers in Kingman — in one checklist. Free, for any city and any number of projects.
Get started →