Solar Energy Device (Photovoltaic) Permit — Kingman, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://www.cityofkingman.gov/government/departments-a-h/development-services/permits-and-inspections
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Energy Device (Photovoltaic) Permit in Kingman, Arizona
Required for installation of solar energy device systems in the City of Kingman, per A.R.S. § 9-468 (Arizona's statutory protection for solar energy device installation). Billed as a flat fee under the City's Development Services Fee Schedule.
Verified 2026-07-20 · Source
When you need this permit
- Permit required for solar energy device systems per A.R.S. § 9-468
- Electrical work must comply with the 2017 NEC as adopted by the City of Kingman with local amendments
- Owner-builder or licensed-contractor requirements follow the same general A.R.S. § 32-1121 framework as other residential/commercial electrical work Owner-builder
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before energizing
- 2
Final
Panel mounting, racking attachment, and electrical connections verified per the 2017 NEC as locally amended
See the full Kingman inspection guide — scheduling & re-inspection fees →
Tips
- A.R.S. § 9-468 is Arizona's statutory framework limiting municipal restrictions on solar energy device installation; the City's flat $220 fee is set under this statute rather than the general graduated Building Permit Fee valuation table used for most other permit types.
- Confirm whether a service upgrade accompanies the PV installation, since that would additionally trigger standard electrical permit fees beyond the flat $220 solar device fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kingman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Kingman
Solar Energy Device (Photovoltaic) Permit in other cities
Compare solar energy device (photovoltaic) permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Kingman project checklist
Describe your project once and get every permit, document, and fee it triggers in Kingman — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →