Skip to main content
PermitBase

Sign Permit in Holbrook, Arizona

Required for commercial sign installation in the City of Holbrook. Fee is a base charge plus a per-square-foot rate, and includes two inspections. Existing signs already in place receive a 1-year waiver.

Verified 2026-07-23 · Source

When you need this permit

  • Sign permit required for commercial sign installation within Holbrook city limits
  • Existing signs have a 1-year waiver from the permit requirement per the Fee Schedule
  • Includes 2 inspections in the base fee
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall; a dedicated Sign Permit application form is also linked from the Building Department page

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Commercial Sign PermitCity of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-11; includes 2 inspections. Existing signs have a 1-year waiver.
$50 + $1.50 per square foot

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Holbrook?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Inspection 1 of 2

    Included in the base Sign Permit fee

  2. 2

    Inspection 2 of 2

    Included in the base Sign Permit fee

See the full Holbrook inspection guide — scheduling & re-inspection fees →

Tips

  • Two inspections are bundled into the base Sign Permit fee ($50 + $1.50/sq ft) — no separate inspection charge applies unless a re-inspection is needed ($75 per re-inspection).
  • Existing signs already installed receive a 1-year waiver from the permit requirement per the Fee Schedule.
  • As of July 2026, the City of Holbrook does not appear to publish permit-specific plan review turnaround times for sign permits on its public website. There is no verifiable online source for this — call the Holbrook Building Department directly at 928-524-6225.

Frequently asked questions

Holbrook requires a sign permit for: Sign permit required for commercial sign installation within Holbrook city limits; Existing signs have a 1-year waiver from the permit requirement per the Fee Schedule; Includes 2 inspections in the base fee; Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall; a dedicated Sign Permit application form is also linked from the Building Department page. If your project isn't listed, confirm with City of Holbrook Building Department at 928-524-6225 before starting work.

$50 plus $1.50 per square foot, which includes 2 inspections, per the City of Holbrook Fee Schedule (adopted November 15, 2025). Existing signs already installed have a 1-year waiver from the permit requirement.

Holbrook does not publish a plan-review timeline for this permit. Contact City of Holbrook Building Department at 928-524-6225 for current turnaround.

You'll need: Sign Permit Application. See the required-documents checklist on this page for details on each.

Holbrook requires 2 inspection(s) for a sign permit, in order: Inspection 1 of 2, Inspection 2 of 2. Schedule each through City of Holbrook Building Department (928-524-6225).

Apply through City of Holbrook Building Department at City Hall, 465 1st Avenue, Holbrook, AZ 86025. Phone: 928-524-6225, email: rtissaw@holbrookaz.gov. Office hours: Monday - Thursday, 7 a.m. - 5 p.m. (City Hall is closed Fridays on a 4-day/40-hour week; the City's Fee Schedule separately prices Special/Emergency Inspections performed on Fridays at $75/hour, minimum 1 hour, consistent with City Hall's normal 4-day week). Building Inspector Richard Tissaw (joined November 2024) oversees permitting. Applications are submitted via the City's online GOGov permit and licensing platform (app.govoutreach.com/holbrookcityaz/public/permits) or in person/by phone at City Hall.. Official information: https://holbrookaz.gov/departments/building-department/.

Holbrook, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Holbrook runs its own Building Department, independent of Navajo County, and issues its own construction permits within city limits. Source: City of Holbrook Building Department page (holbrookaz.gov/departments/building-department/).; The City of Holbrook's own published Fee Schedule (adopted November 15, 2025, superseding the September 1, 2025 edition; figures unchanged between the two) states that Building Permit Fees (Commercial/Residential/New/Remodel/Accessory Building) and the Residential Solar System Fee are calculated 'based on IBC/UBC Building Data-IRC 2018 Charts and Formulas,' confirming the 2018 edition of the ICC family of codes (International Building Code / International Residential Code) is the City's current operative code basis for permit valuation. Source: City of Holbrook Fee Schedule, adopted November 15, 2025 (Section 2-1, Section 2-3).; CONFIRMED 2026-07-23 via live-rendered Municode session (the platform is a JavaScript SPA that returns an empty shell to non-browser requests, but renders fully in a real browser): Holbrook City Code Chapter 5 (Building and Construction), Article 5-2 'Uniform Codes,' was repealed and re-enacted in its entirety by Ordinance No. 25-01, § 1 (adopted January 22, 2025) — replacing the former Art. 5-2 (§§ 5-2-1—5-2-13), which had derived from Ordinance 10-11, Ordinance 11-11, and Ord. No. 24-03, § 1 (adopted May 22, 2024). As codified (Supp. No. 2, Update 1, online content updated February 19, 2026; codified through Ordinance No. 25-09, enacted December 10, 2025), Article 5-2 adopts by reference: § 5-2-1 the 1997 Uniform Code for the Abatement of Dangerous Buildings; § 5-2-2 the 2018 International Building Code (IBC), including Appendix J (Grading) and Appendix K (Administrative Provisions — Mechanisms for Enforcement of NFPA 70 National Electrical Code); § 5-2-3 the 1997 Uniform Code for Building Conservation; § 5-2-4 the 2017 edition of the National Electrical Code (NOT 2018 — this is the one code title in the chapter on an older edition year than the rest); § 5-2-5 the 2018 edition of the NFPA Fire Code; § 5-2-6 the 2018 International Fuel Gas Code (IFGC); § 5-2-7 the 2018 International Mechanical Code (IMC); § 5-2-8 the 2018 International Residential Plumbing Code (the codified section title, verbatim); and § 5-2-9 the 2018 International Residential Code (IRC), including Appendices A, B, G, H, J, L, M, P, and Q. Chapter 5 also contains Article 5-1 'Permits and Fees' (§ 5-1-1: a building/construction permit is required whenever the cost of construction, remodeling, or improvement exceeds $1,000, excepting floor/wall-covering replacement, window replacement, roofing, and painting — Ordinance 10-11; § 5-1-4: permit fees are set from time to time by council resolution, i.e. the Fee Schedule) and Article 5-3 'Drainage and Retention Criteria' (stormwater/grading design criteria, unrelated to permit fees or code editions). No climatic/geographic design-criteria table (wind speed, seismic design category, etc.) or plan-review turnaround-time language exists anywhere in Chapter 5's text. Ordinances subsequent to 25-09 (No. 26-01 and No. 26-02, both adopted May 13, 2026) amend Chapter 6 and Chapter 3 respectively — neither touches Chapter 5, so the code editions above remain the most current. Source: Holbrook, AZ Municode Library, Chapter 5 — Building and Construction (library.municode.com/az/holbrook/codes/city_code?nodeId=CH5BUCO), live-rendered 2026-07-23.; Manufactured homes, mobile homes, and factory-built buildings are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for construction/installation standards; the City of Holbrook's own building permit process governs on-site placement, foundation/tie-down, and zoning compliance, consistent with statewide practice for Arizona home-rule municipalities. Source: Arizona Department of Fire, Building and Life Safety Office of Manufactured Housing statutory authority (A.R.S. § 41-4001 et seq.); City of Holbrook Building Department confirms it issues its own local permits independent of the County.. Local amendments apply — see the Holbrook overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holbrook building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.