EV Charger / EVSE Permit in Holbrook, Arizona

Holbrook has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. A home or business EV charger circuit is billed under the City's standard flat-fee Electric Permit (inspection included) -- the same $50 permit used for any other electrical installation, alteration, or repair. If the circuit requires a panel upgrade to support the charger's load, the separate flat Panel Upgrade/Inspection fee applies instead.

Verified 2026-07-23 · Source

When you need this permit

  • Electric Permit required for EV charger circuit installation within Holbrook city limits
  • No EV/EVSE-specific fee line exists on the City's Fee Schedule -- billed under the standard $50 Electric Permit (inspection included)
  • If a panel upgrade is needed to support the charger's amperage draw, the separate Panel Upgrade/Inspection fee applies instead of (or in addition to) the base Electric Permit
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electric Permit (inspection included) -- applies to a standard EV charger circuitCity of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-2 -- no dedicated EV/EVSE line item exists; billed under the same flat fee used for any other electrical installation
$50
Panel Upgrade/Inspection (if the charger install requires a panel upgrade)City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-14
$75

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Holbrook?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Included in the $50 Electric Permit fee; covers the charger circuit, disconnect, and GFCI/load-management compliance

See the full Holbrook inspection guide — scheduling & re-inspection fees →

Tips

  • Holbrook has no EV-specific permit or fee -- an EV charger circuit is billed under the standard $50 flat Electric Permit fee, the same one used for any other electrical installation.
  • If your install requires a panel upgrade to support the charger's amperage, budget for the separate $75 Panel Upgrade/Inspection fee.
  • As with electrical and solar permits generally in Holbrook, no plan-review turnaround time is published online -- call the Building Department directly at 928-524-6225 for a project-specific estimate.

Frequently asked questions

Holbrook requires an ev charger / evse permit for: Electric Permit required for EV charger circuit installation within Holbrook city limits; No EV/EVSE-specific fee line exists on the City's Fee Schedule -- billed under the standard $50 Electric Permit (inspection included); If a panel upgrade is needed to support the charger's amperage draw, the separate Panel Upgrade/Inspection fee applies instead of (or in addition to) the base Electric Permit; Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall. If your project isn't listed, confirm with City of Holbrook Building Department at 928-524-6225 before starting work.

No. Holbrook has no dedicated EV/EVSE permit or fee line item. An EV charger circuit is billed under the City's standard $50 flat Electric Permit (inspection included), per the City of Holbrook Fee Schedule adopted November 15, 2025. A panel upgrade, if needed, is billed separately at $75.

Holbrook does not publish a plan-review timeline for this permit. Contact City of Holbrook Building Department at 928-524-6225 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Holbrook requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through City of Holbrook Building Department (928-524-6225).

Apply through City of Holbrook Building Department at City Hall, 465 1st Avenue, Holbrook, AZ 86025. Phone: 928-524-6225, email: rtissaw@holbrookaz.gov. Office hours: Monday - Thursday, 7 a.m. - 5 p.m. (City Hall is closed Fridays on a 4-day/40-hour week; the City's Fee Schedule separately prices Special/Emergency Inspections performed on Fridays at $75/hour, minimum 1 hour, consistent with City Hall's normal 4-day week). Building Inspector Richard Tissaw (joined November 2024) oversees permitting. Applications are submitted via the City's online GOGov permit and licensing platform (app.govoutreach.com/holbrookcityaz/public/permits) or in person/by phone at City Hall.. Official information: https://holbrookaz.gov/departments/building-department/.

Holbrook, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Holbrook runs its own Building Department, independent of Navajo County, and issues its own construction permits within city limits. Source: City of Holbrook Building Department page (holbrookaz.gov/departments/building-department/).; The City of Holbrook's own published Fee Schedule (adopted November 15, 2025, superseding the September 1, 2025 edition; figures unchanged between the two) states that Building Permit Fees (Commercial/Residential/New/Remodel/Accessory Building) and the Residential Solar System Fee are calculated 'based on IBC/UBC Building Data-IRC 2018 Charts and Formulas,' confirming the 2018 edition of the ICC family of codes (International Building Code / International Residential Code) is the City's current operative code basis for permit valuation. Source: City of Holbrook Fee Schedule, adopted November 15, 2025 (Section 2-1, Section 2-3).; CONFIRMED 2026-07-23 via live-rendered Municode session (the platform is a JavaScript SPA that returns an empty shell to non-browser requests, but renders fully in a real browser): Holbrook City Code Chapter 5 (Building and Construction), Article 5-2 'Uniform Codes,' was repealed and re-enacted in its entirety by Ordinance No. 25-01, § 1 (adopted January 22, 2025) — replacing the former Art. 5-2 (§§ 5-2-1—5-2-13), which had derived from Ordinance 10-11, Ordinance 11-11, and Ord. No. 24-03, § 1 (adopted May 22, 2024). As codified (Supp. No. 2, Update 1, online content updated February 19, 2026; codified through Ordinance No. 25-09, enacted December 10, 2025), Article 5-2 adopts by reference: § 5-2-1 the 1997 Uniform Code for the Abatement of Dangerous Buildings; § 5-2-2 the 2018 International Building Code (IBC), including Appendix J (Grading) and Appendix K (Administrative Provisions — Mechanisms for Enforcement of NFPA 70 National Electrical Code); § 5-2-3 the 1997 Uniform Code for Building Conservation; § 5-2-4 the 2017 edition of the National Electrical Code (NOT 2018 — this is the one code title in the chapter on an older edition year than the rest); § 5-2-5 the 2018 edition of the NFPA Fire Code; § 5-2-6 the 2018 International Fuel Gas Code (IFGC); § 5-2-7 the 2018 International Mechanical Code (IMC); § 5-2-8 the 2018 International Residential Plumbing Code (the codified section title, verbatim); and § 5-2-9 the 2018 International Residential Code (IRC), including Appendices A, B, G, H, J, L, M, P, and Q. Chapter 5 also contains Article 5-1 'Permits and Fees' (§ 5-1-1: a building/construction permit is required whenever the cost of construction, remodeling, or improvement exceeds $1,000, excepting floor/wall-covering replacement, window replacement, roofing, and painting — Ordinance 10-11; § 5-1-4: permit fees are set from time to time by council resolution, i.e. the Fee Schedule) and Article 5-3 'Drainage and Retention Criteria' (stormwater/grading design criteria, unrelated to permit fees or code editions). No climatic/geographic design-criteria table (wind speed, seismic design category, etc.) or plan-review turnaround-time language exists anywhere in Chapter 5's text. Ordinances subsequent to 25-09 (No. 26-01 and No. 26-02, both adopted May 13, 2026) amend Chapter 6 and Chapter 3 respectively — neither touches Chapter 5, so the code editions above remain the most current. Source: Holbrook, AZ Municode Library, Chapter 5 — Building and Construction (library.municode.com/az/holbrook/codes/city_code?nodeId=CH5BUCO), live-rendered 2026-07-23.; Manufactured homes, mobile homes, and factory-built buildings are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for construction/installation standards; the City of Holbrook's own building permit process governs on-site placement, foundation/tie-down, and zoning compliance, consistent with statewide practice for Arizona home-rule municipalities. Source: Arizona Department of Fire, Building and Life Safety Office of Manufactured Housing statutory authority (A.R.S. § 41-4001 et seq.); City of Holbrook Building Department confirms it issues its own local permits independent of the County.. Local amendments apply — see the Holbrook overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holbrook building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.