Skip to main content
PermitBase

Residential Building Permit (New Construction / Remodel / Accessory Building) in Holbrook, Arizona

Required for new single-family residential construction, remodels, and accessory buildings in the City of Holbrook. Building Permit Fees are calculated based on IBC/UBC Building Data-IRC 2018 Charts and Formulas per the City's own Fee Schedule (adopted November 15, 2025). Permits are issued through the Building Department and are valid for 6 months.

Verified 2026-07-23 · Source

When you need this permit

  • Building permit required for new construction, remodels, and accessory buildings (Commercial and Residential) within Holbrook city limits
  • Permit fee is calculated using IBC/UBC Building Data-IRC 2018 valuation charts and formulas, per the City's Fee Schedule
  • Permits are valid for 6 months from issuance; a Permit Renewal ($20) is required every 6 months prior to expiration to keep an in-progress permit active
  • If a permit is allowed to expire without renewal, a Permit Reactivation fee of 10% of the original permit fee applies
  • A $100 Plan Review Fee applies at submittal and is credited back toward the final permit purchase price
  • A Certificate of Occupancy ($50) is required for new residential or commercial construction before occupancy
  • Apply via the City's online GOGov permit and licensing platform (app.govoutreach.com/holbrookcityaz/public/permits) or directly through the Building Department at City Hall

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (Commercial/Residential/New/Remodel/Accessory Building)City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-1
Based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (valuation-based; no flat dollar figure published)
Plan Review FeeCity of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-6
$100 (credited back toward permit purchase)
Certificate of Occupancy (New Residential/Commercial)City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-7
$50
Permit Renewal (every 6 months prior to expiration)City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-4
$20
Permit Reactivation (if permit has expired)City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-5
10% of the original permit fee
Inspection (if no fee specifically indicated) / Re-InspectionCity of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-8
$75 per inspection / $75 per re-inspection

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (New Construction / Remodel / Accessory Building) permit actually take in Holbrook?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    General Inspection (per Building Department schedule)

    Standard construction-progress inspections billed at $75 if no other fee is specifically indicated; Re-Inspections after a failed inspection are $75 each

  2. 2

    Final / Certificate of Occupancy

    Final inspection precedes issuance of the $50 Certificate of Occupancy for new residential or commercial construction

See the full Holbrook inspection guide — scheduling & re-inspection fees →

Tips

  • As of July 2026, the City of Holbrook does not appear to publish permit-specific plan review turnaround times for residential building permits on its public website. The City publishes a detailed Fee Schedule (adopted November 15, 2025) covering Building Department permit fees, but not category-specific review timelines, and no separate A.R.S. § 9-835 licensing-timeframes document (the kind larger Arizona cities like Buckeye publish) could be located on the City's site, its document library, or the Wayback Machine. There is no verifiable online source for this — call the Holbrook Building Department directly at 928-524-6225 to ask about current plan review turnaround.
  • Building permits in Holbrook are valid for only 6 months — plan for renewal ($20) if construction runs longer, and note that a fully expired permit costs 10% of the original fee to reactivate.
  • The $100 Plan Review Fee is credited back toward the final permit cost, so budget it as a deposit rather than an additional charge.
  • Fee amounts for the permit itself and the solar system fee are valuation-based per IBC/UBC/IRC 2018 charts — request a written fee estimate from the Building Department based on your project's declared valuation before submitting.

Frequently asked questions

Holbrook requires a residential building permit (new construction / remodel / accessory building) for: Building permit required for new construction, remodels, and accessory buildings (Commercial and Residential) within Holbrook city limits; Permit fee is calculated using IBC/UBC Building Data-IRC 2018 valuation charts and formulas, per the City's Fee Schedule; Permits are valid for 6 months from issuance; a Permit Renewal ($20) is required every 6 months prior to expiration to keep an in-progress permit active; If a permit is allowed to expire without renewal, a Permit Reactivation fee of 10% of the original permit fee applies; A $100 Plan Review Fee applies at submittal and is credited back toward the final permit purchase price; A Certificate of Occupancy ($50) is required for new residential or commercial construction before occupancy; Apply via the City's online GOGov permit and licensing platform (app.govoutreach.com/holbrookcityaz/public/permits) or directly through the Building Department at City Hall. If your project isn't listed, confirm with City of Holbrook Building Department at 928-524-6225 before starting work.

In Holbrook, the published Building Permit Fee (Commercial/Residential/New/Remodel/Accessory Building) is: Based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (valuation-based; no flat dollar figure published). Additional published fees: Plan Review Fee — $100 (credited back toward permit purchase); Certificate of Occupancy (New Residential/Commercial) — $50; Permit Renewal (every 6 months prior to expiration) — $20; Permit Reactivation (if permit has expired) — 10% of the original permit fee; Inspection (if no fee specifically indicated) / Re-Inspection — $75 per inspection / $75 per re-inspection. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

As of July 2026, the City of Holbrook does not publish a specific plan review turnaround time for residential building permits online. Call the Building Department at 928-524-6225 to confirm current review timing for your project.

You'll need: Building Permit Application; Site/Plot Plan; Construction Drawings. See the required-documents checklist on this page for details on each.

Holbrook requires 2 inspection(s) for a residential building permit (new construction / remodel / accessory building), in order: General Inspection (per Building Department schedule), Final / Certificate of Occupancy. Schedule each through City of Holbrook Building Department (928-524-6225).

Apply through City of Holbrook Building Department at City Hall, 465 1st Avenue, Holbrook, AZ 86025. Phone: 928-524-6225, email: rtissaw@holbrookaz.gov. Office hours: Monday - Thursday, 7 a.m. - 5 p.m. (City Hall is closed Fridays on a 4-day/40-hour week; the City's Fee Schedule separately prices Special/Emergency Inspections performed on Fridays at $75/hour, minimum 1 hour, consistent with City Hall's normal 4-day week). Building Inspector Richard Tissaw (joined November 2024) oversees permitting. Applications are submitted via the City's online GOGov permit and licensing platform (app.govoutreach.com/holbrookcityaz/public/permits) or in person/by phone at City Hall.. Official information: https://holbrookaz.gov/departments/building-department/.

Holbrook, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Holbrook runs its own Building Department, independent of Navajo County, and issues its own construction permits within city limits. Source: City of Holbrook Building Department page (holbrookaz.gov/departments/building-department/).; The City of Holbrook's own published Fee Schedule (adopted November 15, 2025, superseding the September 1, 2025 edition; figures unchanged between the two) states that Building Permit Fees (Commercial/Residential/New/Remodel/Accessory Building) and the Residential Solar System Fee are calculated 'based on IBC/UBC Building Data-IRC 2018 Charts and Formulas,' confirming the 2018 edition of the ICC family of codes (International Building Code / International Residential Code) is the City's current operative code basis for permit valuation. Source: City of Holbrook Fee Schedule, adopted November 15, 2025 (Section 2-1, Section 2-3).; CONFIRMED 2026-07-23 via live-rendered Municode session (the platform is a JavaScript SPA that returns an empty shell to non-browser requests, but renders fully in a real browser): Holbrook City Code Chapter 5 (Building and Construction), Article 5-2 'Uniform Codes,' was repealed and re-enacted in its entirety by Ordinance No. 25-01, § 1 (adopted January 22, 2025) — replacing the former Art. 5-2 (§§ 5-2-1—5-2-13), which had derived from Ordinance 10-11, Ordinance 11-11, and Ord. No. 24-03, § 1 (adopted May 22, 2024). As codified (Supp. No. 2, Update 1, online content updated February 19, 2026; codified through Ordinance No. 25-09, enacted December 10, 2025), Article 5-2 adopts by reference: § 5-2-1 the 1997 Uniform Code for the Abatement of Dangerous Buildings; § 5-2-2 the 2018 International Building Code (IBC), including Appendix J (Grading) and Appendix K (Administrative Provisions — Mechanisms for Enforcement of NFPA 70 National Electrical Code); § 5-2-3 the 1997 Uniform Code for Building Conservation; § 5-2-4 the 2017 edition of the National Electrical Code (NOT 2018 — this is the one code title in the chapter on an older edition year than the rest); § 5-2-5 the 2018 edition of the NFPA Fire Code; § 5-2-6 the 2018 International Fuel Gas Code (IFGC); § 5-2-7 the 2018 International Mechanical Code (IMC); § 5-2-8 the 2018 International Residential Plumbing Code (the codified section title, verbatim); and § 5-2-9 the 2018 International Residential Code (IRC), including Appendices A, B, G, H, J, L, M, P, and Q. Chapter 5 also contains Article 5-1 'Permits and Fees' (§ 5-1-1: a building/construction permit is required whenever the cost of construction, remodeling, or improvement exceeds $1,000, excepting floor/wall-covering replacement, window replacement, roofing, and painting — Ordinance 10-11; § 5-1-4: permit fees are set from time to time by council resolution, i.e. the Fee Schedule) and Article 5-3 'Drainage and Retention Criteria' (stormwater/grading design criteria, unrelated to permit fees or code editions). No climatic/geographic design-criteria table (wind speed, seismic design category, etc.) or plan-review turnaround-time language exists anywhere in Chapter 5's text. Ordinances subsequent to 25-09 (No. 26-01 and No. 26-02, both adopted May 13, 2026) amend Chapter 6 and Chapter 3 respectively — neither touches Chapter 5, so the code editions above remain the most current. Source: Holbrook, AZ Municode Library, Chapter 5 — Building and Construction (library.municode.com/az/holbrook/codes/city_code?nodeId=CH5BUCO), live-rendered 2026-07-23.; Manufactured homes, mobile homes, and factory-built buildings are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for construction/installation standards; the City of Holbrook's own building permit process governs on-site placement, foundation/tie-down, and zoning compliance, consistent with statewide practice for Arizona home-rule municipalities. Source: Arizona Department of Fire, Building and Life Safety Office of Manufactured Housing statutory authority (A.R.S. § 41-4001 et seq.); City of Holbrook Building Department confirms it issues its own local permits independent of the County.. Local amendments apply — see the Holbrook overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holbrook building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.