Guest House Permit in Unincorporated Navajo County, Arizona

A dedicated permit type for guest houses (secondary dwelling units) in unincorporated Navajo County, carrying its own flat fee separate from the standard valuation-based Building Permit fee.

Reviewed 2026-07-07 · Source

When you need this permit

  • Construction Permit Application required, completed by owner or agent
  • Same site plan, ownership proof, and septic verification requirements as a standard residential building permit
  • Subject to the same design/climatic criteria (wind, seismic, snow load) applicable to the specific area of the county

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Guest House PermitNavajo County Planning and Development Fee Schedule (updated 7/15/2025)
$400.00

Review timeline

Plan review
Not published — contact the department

How long did your Guest House Permit permit actually take in Unincorporated Navajo County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing / Foundation

    Before concrete pour, property lines and setbacks must be clearly marked

  2. 2

    Final Inspection

    Per the Addenda's Final Inspection Checklist — septic/plumbing operable, electrical panels labeled, GFCI protection, smoke detectors, 911 address posted

See the full Unincorporated Navajo County inspection guide — scheduling & re-inspection fees →

Tips

  • A Guest House Permit is a distinct, separately-fee-scheduled permit type from the standard valuation-based residential Building Permit — confirm with Planning & Development Services (928-532-6040) whether your accessory dwelling qualifies for this flat-fee category or falls under the standard Building Permit fee structure instead.
  • NEW 2026-07-23 finding, directly read from the county's own Zoning Ordinance: as of the September 26, 2025 update to Article 19, Section 1917 (Guest Houses/Accessory Dwelling Units), adopted to comply with A.R.S. § 11-810.01, 'No guest house permit is required for attached guest houses' — this zoning-level exemption applies specifically to ATTACHED guest houses (up to one per lot); detached guest houses (up to one on lots under 1 acre, up to two on lots 1+ acres) are not stated as exempt. Regardless of attached/detached status, Section 1917.3.b confirms 'Applicable Building, Environmental Quality, and Engineering Permits apply to all guest houses' — so a Building Permit (and this fee-schedule's $400 Guest House Permit fee, where applicable) may still be required for construction even when the standalone zoning guest-house permit is not. Confirm with Planning & Development Services which specific permit(s) apply to your attached vs. detached project. Source: Navajo County Zoning Ordinance, Article 19 § 1917 (https://www.navajocountyaz.gov/DocumentCenter/View/1252/Article-19---General-Provisions), current as of the 9/26/2025 update.

Frequently asked questions

Unincorporated Navajo County requires a guest house permit for: Construction Permit Application required, completed by owner or agent; Same site plan, ownership proof, and septic verification requirements as a standard residential building permit; Subject to the same design/climatic criteria (wind, seismic, snow load) applicable to the specific area of the county. If your project isn't listed, confirm with Navajo County Planning & Development Services — Building & Safety Division at 928-532-6040 before starting work.

$400.00, per the Navajo County Planning and Development Fee Schedule (updated 7/15/2025). Source: https://www.navajocountyaz.gov/DocumentCenter/View/500/Planning-and-Development-Fees-PDF

Unincorporated Navajo County does not publish a plan-review timeline for this permit. Contact Navajo County Planning & Development Services — Building & Safety Division at 928-532-6040 for current turnaround.

You'll need: Construction Permit Application; Detailed Site Plan. See the required-documents checklist on this page for details on each.

Unincorporated Navajo County requires 2 inspection(s) for a guest house permit, in order: Footing / Foundation, Final Inspection. Schedule each through Navajo County Planning & Development Services — Building & Safety Division (928-532-6040).

Apply through Navajo County Planning & Development Services — Building & Safety Division at 1100 E. Thornton Rd., Show Low, AZ 85901 (Show Low/White Mountains area office); additional area offices at 100 W. Public Works Dr., Holbrook, AZ 86025 (928-524-4100) and 2188 W. Country Club Dr., Overgaard, AZ 85933 (928-535-7110). Phone: 928-532-6040. Office hours: Monday–Thursday, 6:30 a.m. – 5:00 p.m. (Planning & Development Services main office and Show Low Building Division, per the department's Planning & Development Services page). The Permit Application Instructions document (revised January 2, 2025) lists slightly different hours for the Show Low office: Monday–Thursday, 7:30 a.m. – 6:00 p.m. Both figures are current published County sources; the department observes a 4-day (Mon–Thu) work week at all locations.. Official information: https://www.navajocountyaz.gov/289/Building-Information.

Unincorporated Navajo County, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 11). Navajo County independently adopts and administers its own construction codes for unincorporated areas through Planning & Development Services / Building & Safety; it does NOT extend onto Navajo Nation, Hopi Tribe, or other tribal trust land, which has its own separate tribal permitting authority outside county jurisdiction. Source: Navajo County Addenda & Additions to the International Building Codes (amended 3-15-22).; 2018 International Residential Code (IRC) and 2018 International Building Code (IBC), adopted by Navajo County, EXCEPT: IRC Chapter 11 (Energy Efficiency); IRC Appendix E (Manufactured Housing Used as Dwellings); IRC § E3902; and IRC Appendices A, D, I, J, K, M, O, Q, R, S are all excluded from adoption. Source: Navajo County Addenda & Additions to the International Building Codes (amended 3-15-22), p.5 'Adopted Codes'.; 2018 International Plumbing Code — inspections are based on the 2017 IPC and cross-referenced with the 2018 Uniform Plumbing Code per the Addenda's Plumbing section. Source: Navajo County Addenda & Additions (amended 3-15-22), p.17.; 2018 International Mechanical Code, adopted alongside the 2018 IRC/IBC electrical, plumbing, and mechanical code family. Source: Navajo County Addenda & Additions (amended 3-15-22), p.5.; 2017 National Electrical Code (NEC) — electrical inspections are based on the 2018 IRC/IBC and referenced with the 2017 NEC. Source: Navajo County Addenda & Additions (amended 3-15-22), pp.5, 17.; Prior code baseline: Navajo County adopted the 2015 IBC/IRC effective June 11, 2019 (replacing a 2006 IBC edition, after the county's ISO Public Protection Classification rating was threatened with a downgrade for an out-of-date code); the county subsequently updated to the current 2018 IRC/IBC family reflected in the March 2022 Addenda & Additions. Source: White Mountain Independent, 'Navajo County updates building code' (wmicentral.com).; Building official has discretion to require an Arizona-registered architect/engineer stamp for any commercial-use structure, and for steel, log, or post/pole-and-beam construction, at the discretion of the Technical Advisory Board and Board of Supervisors. Source: Navajo County Addenda & Additions (amended 3-15-22), p.6.; Commercial buildings exceeding 3,000 sq ft of floor area intended for continuous occupancy of more than 20 persons must be designed and stamped by an engineer registered by the Arizona Board of Technical Registration, per A.R.S. § 32-144. Source: Navajo County Construction Permit Application Instructions (revised January 2, 2025).; Where a conflict exists between codes adopted by Navajo County or the State of Arizona and the Addenda and Additions, the more restrictive provision governs; the Navajo County Technical Advisory Board acts as the Board of Appeals. Source: Navajo County Addenda & Additions (amended 3-15-22), p.5.. Local amendments apply — see the Unincorporated Navajo County overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Navajo County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare guest house permit fees across Arizona

Look up this fee in a different city →

Embed this data card →

Now live

Build your Unincorporated Navajo County project checklist

Describe your project once and get every permit, document, and fee it triggers in Unincorporated Navajo County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →