Manufactured / Mobile Home Installation Permit in Unincorporated Navajo County, Arizona

Required for the placement and installation of manufactured/mobile homes in unincorporated Navajo County. Older mobile homes (built before June 15, 1976) must be brought up to current code and safety requirements before an installation permit is issued.

Reviewed 2026-07-07 · Source

When you need this permit

  • Construction Permit Application completed by owner or agent, plus a completed Manufactured Home Supplement Form
  • Copies of ownership documents (titles relating to the manufactured home) required
  • Manufacturer construction documents verifying roof load required
  • Disclaimer Form may be allowed for some models
  • Floor plan required
  • Detailed site plan showing proposed home location, setbacks, utilities, septic, driveways, and existing buildings, with accurate dimensions
  • Verification of septic system required
  • Mobile homes built prior to June 15, 1976 must be brought up to current code and safety requirements before a permit is issued
  • Proof of ownership (Assessor's Parcel Number) required

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Manufactured Home permitNavajo County Building Information FAQs (navajocountyaz.gov/faq.aspx?TID=23); this specific flat figure was not independently found restated on the 7/15/2025 fee schedule PDF, which lists a 'Manufactured Home' line without a printed dollar amount alongside 'Factory Built Buildings (FBB)' under the same valuation-based Building Permit fee structure as new dwellings. The $102.00 figure is sourced directly from the county's own published FAQ page.
$102.00

Review timeline

Plan review
Not published — contact the department

How long did your Manufactured / Mobile Home Installation Permit permit actually take in Unincorporated Navajo County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Site / Setback Verification

    Property lines and required yard setbacks must be clearly marked before any foundation-related inspection

  2. 2

    Utility Connections (Electrical Meter Loop, Septic Hookup)

    No meter-loop (electrical hook-up) permit will be issued unless hook-up to an approved sanitary system is available and documented

  3. 3

    Final Inspection

    All utilities on and working; septic/plumbing in full working order; 911 address posted; per the Addenda's Final Inspection Checklist

See the full Unincorporated Navajo County inspection guide — scheduling & re-inspection fees →

Tips

  • Mobile homes built before June 15, 1976 cannot simply be relocated and re-permitted — they must first be brought up to current code and safety requirements.
  • Manufacturer construction documents verifying roof load are required specifically because Navajo County's design snow loads vary sharply by area (from 29 psf ground snow near Taylor/Shumway to 64 psf near Heber/Overgaard) — confirm the home's rated roof load matches its actual installation location.
  • A Disclaimer Form may be available for some manufactured home models in lieu of full engineering verification — confirm eligibility with Building & Safety staff (928-532-6040) before applying.

Frequently asked questions

Unincorporated Navajo County requires a manufactured / mobile home installation permit for: Construction Permit Application completed by owner or agent, plus a completed Manufactured Home Supplement Form; Copies of ownership documents (titles relating to the manufactured home) required; Manufacturer construction documents verifying roof load required; Disclaimer Form may be allowed for some models; Floor plan required; Detailed site plan showing proposed home location, setbacks, utilities, septic, driveways, and existing buildings, with accurate dimensions; Verification of septic system required; Mobile homes built prior to June 15, 1976 must be brought up to current code and safety requirements before a permit is issued; Proof of ownership (Assessor's Parcel Number) required. If your project isn't listed, confirm with Navajo County Planning & Development Services — Building & Safety Division at 928-532-6040 before starting work.

$102.00, per Navajo County's Building Information FAQ page. Source: https://www.navajocountyaz.gov/faq.aspx?TID=23

Unincorporated Navajo County does not publish a plan-review timeline for this permit. Contact Navajo County Planning & Development Services — Building & Safety Division at 928-532-6040 for current turnaround.

You'll need: Construction Permit Application; Manufactured Home Supplement Form; Ownership Documents / Titles; Manufacturer Construction Documents (Roof Load Verification). See the required-documents checklist on this page for details on each.

Unincorporated Navajo County requires 3 inspection(s) for a manufactured / mobile home installation permit, in order: Site / Setback Verification, Utility Connections (Electrical Meter Loop, Septic Hookup), Final Inspection. Schedule each through Navajo County Planning & Development Services — Building & Safety Division (928-532-6040).

Apply through Navajo County Planning & Development Services — Building & Safety Division at 1100 E. Thornton Rd., Show Low, AZ 85901 (Show Low/White Mountains area office); additional area offices at 100 W. Public Works Dr., Holbrook, AZ 86025 (928-524-4100) and 2188 W. Country Club Dr., Overgaard, AZ 85933 (928-535-7110). Phone: 928-532-6040. Office hours: Monday–Thursday, 6:30 a.m. – 5:00 p.m. (Planning & Development Services main office and Show Low Building Division, per the department's Planning & Development Services page). The Permit Application Instructions document (revised January 2, 2025) lists slightly different hours for the Show Low office: Monday–Thursday, 7:30 a.m. – 6:00 p.m. Both figures are current published County sources; the department observes a 4-day (Mon–Thu) work week at all locations.. Official information: https://www.navajocountyaz.gov/289/Building-Information.

Unincorporated Navajo County, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 11). Navajo County independently adopts and administers its own construction codes for unincorporated areas through Planning & Development Services / Building & Safety; it does NOT extend onto Navajo Nation, Hopi Tribe, or other tribal trust land, which has its own separate tribal permitting authority outside county jurisdiction. Source: Navajo County Addenda & Additions to the International Building Codes (amended 3-15-22).; 2018 International Residential Code (IRC) and 2018 International Building Code (IBC), adopted by Navajo County, EXCEPT: IRC Chapter 11 (Energy Efficiency); IRC Appendix E (Manufactured Housing Used as Dwellings); IRC § E3902; and IRC Appendices A, D, I, J, K, M, O, Q, R, S are all excluded from adoption. Source: Navajo County Addenda & Additions to the International Building Codes (amended 3-15-22), p.5 'Adopted Codes'.; 2018 International Plumbing Code — inspections are based on the 2017 IPC and cross-referenced with the 2018 Uniform Plumbing Code per the Addenda's Plumbing section. Source: Navajo County Addenda & Additions (amended 3-15-22), p.17.; 2018 International Mechanical Code, adopted alongside the 2018 IRC/IBC electrical, plumbing, and mechanical code family. Source: Navajo County Addenda & Additions (amended 3-15-22), p.5.; 2017 National Electrical Code (NEC) — electrical inspections are based on the 2018 IRC/IBC and referenced with the 2017 NEC. Source: Navajo County Addenda & Additions (amended 3-15-22), pp.5, 17.; Prior code baseline: Navajo County adopted the 2015 IBC/IRC effective June 11, 2019 (replacing a 2006 IBC edition, after the county's ISO Public Protection Classification rating was threatened with a downgrade for an out-of-date code); the county subsequently updated to the current 2018 IRC/IBC family reflected in the March 2022 Addenda & Additions. Source: White Mountain Independent, 'Navajo County updates building code' (wmicentral.com).; Building official has discretion to require an Arizona-registered architect/engineer stamp for any commercial-use structure, and for steel, log, or post/pole-and-beam construction, at the discretion of the Technical Advisory Board and Board of Supervisors. Source: Navajo County Addenda & Additions (amended 3-15-22), p.6.; Commercial buildings exceeding 3,000 sq ft of floor area intended for continuous occupancy of more than 20 persons must be designed and stamped by an engineer registered by the Arizona Board of Technical Registration, per A.R.S. § 32-144. Source: Navajo County Construction Permit Application Instructions (revised January 2, 2025).; Where a conflict exists between codes adopted by Navajo County or the State of Arizona and the Addenda and Additions, the more restrictive provision governs; the Navajo County Technical Advisory Board acts as the Board of Appeals. Source: Navajo County Addenda & Additions (amended 3-15-22), p.5.. Local amendments apply — see the Unincorporated Navajo County overview page for the full list.

Only if it is brought up to current code and safety requirements; mobile homes built prior to June 15, 1976 do not automatically qualify for a placement permit. Source: Navajo County Building Information FAQs.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Navajo County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.