Navajo County publishes no distinct fee line item for EV charger / EVSE installation on its Planning and Development Fee Schedule (updated 7/15/2025) — directly confirmed by reading the county's own published fee schedule PDF, which lists only a single 'Building Permit' line covering 'New Dwelling, Remodel, Commercial, Addition, Garage, Accessory Buildings, Towers, Tower Additions' at a valuation-based rate; the county's Building Information page likewise lists no separate electrical permit category. A residential or commercial EV charging station installation (new circuit/panel work) is therefore permitted as ordinary electrical construction work under the county's general valuation-based Building Permit — there is no county-published confirmation specifically naming EV chargers, so this is an inference from the absence of any other applicable permit type, not an explicit county statement.

Verified 2026-07-20 · Source

When you need this permit

  • No standalone EV charger/EVSE permit type or fee line item is published by Navajo County Planning & Development Services
  • EV charging station circuit and equipment installation is treated as ordinary electrical work under the general Building Permit (Navajo County Planning & Development Services, Building & Safety Division)
  • Apply through the same Construction Permit Application process used for other building/electrical work
  • Fee is calculated on the valuation-based IBC/UBC Building Valuation Data-IRC 2018 Charts and Formulas (Resolution 9-2022), the same table used for all other construction, since no separate electrical permit fee schedule exists
  • Plan review is charged at 35% of the total building permit fee, per the county fee schedule

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

EV Charger / EVSE Installation (no distinct line item — billed as general Building Permit)Navajo County Planning and Development Fee Schedule (updated 7/15/2025) — directly re-chased and re-confirmed in full; no 'EV Charger', 'EVSE', or 'Electric Vehicle Charging Station' line item exists, and no separate Electrical Permit line item exists either. Only the general valuation-based Building Permit line applies.
Valuation-based, per IBC/UBC Building Valuation Data-IRC 2018 Charts and Formulas (Resolution 9-2022) — the same table used for all other construction and electrical work
Plan Review/CheckNavajo County Planning and Development Fee Schedule (updated 7/15/2025)
35% of the total building permit fee

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Unincorporated Navajo County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Electrical Inspection

    Circuit, panel, grounding/bonding, and charging equipment installation complete and operational, per adopted NEC (as amended by Navajo County addenda)

See the full Unincorporated Navajo County inspection guide — scheduling & re-inspection fees →

Tips

  • Navajo County has no distinct EV charger or electrical permit fee — a home or business EV charging station installation is billed under the same valuation-based Building Permit fee table used for all other construction, since the county publishes no separate electrical permit schedule.
  • Confirm directly with Planning & Development Services (928-524-4000) whether a specific installation (e.g., a simple 240V circuit to an existing panel with adequate capacity) requires a full Construction Permit Application or qualifies for a simpler process — this is not spelled out in the published fee schedule.

Frequently asked questions

Unincorporated Navajo County requires an ev charger / electric vehicle charging station permit for: No standalone EV charger/EVSE permit type or fee line item is published by Navajo County Planning & Development Services; EV charging station circuit and equipment installation is treated as ordinary electrical work under the general Building Permit (Navajo County Planning & Development Services, Building & Safety Division); Apply through the same Construction Permit Application process used for other building/electrical work; Fee is calculated on the valuation-based IBC/UBC Building Valuation Data-IRC 2018 Charts and Formulas (Resolution 9-2022), the same table used for all other construction, since no separate electrical permit fee schedule exists; Plan review is charged at 35% of the total building permit fee, per the county fee schedule. If your project isn't listed, confirm with Navajo County Planning & Development Services — Building & Safety Division at 928-532-6040 before starting work.

No. The county's published Planning and Development Fee Schedule (updated 7/15/2025) lists no 'EV Charger', 'EVSE', or 'Electric Vehicle Charging Station' line item, and no separate electrical permit line item exists either — EV charging equipment installation is billed under the general valuation-based Building Permit, the same fee table used for all other construction. Source: https://www.navajocountyaz.gov/DocumentCenter/View/500/Planning-and-Development-Fees-PDF

Unincorporated Navajo County does not publish a plan-review timeline for this permit. Contact Navajo County Planning & Development Services — Building & Safety Division at 928-532-6040 for current turnaround.

You'll need: Construction Permit Application. See the required-documents checklist on this page for details on each.

Unincorporated Navajo County requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: Final Electrical Inspection. Schedule each through Navajo County Planning & Development Services — Building & Safety Division (928-532-6040).

Apply through Navajo County Planning & Development Services — Building & Safety Division at 1100 E. Thornton Rd., Show Low, AZ 85901 (Show Low/White Mountains area office); additional area offices at 100 W. Public Works Dr., Holbrook, AZ 86025 (928-524-4100) and 2188 W. Country Club Dr., Overgaard, AZ 85933 (928-535-7110). Phone: 928-532-6040. Office hours: Monday–Thursday, 6:30 a.m. – 5:00 p.m. (Planning & Development Services main office and Show Low Building Division, per the department's Planning & Development Services page). The Permit Application Instructions document (revised January 2, 2025) lists slightly different hours for the Show Low office: Monday–Thursday, 7:30 a.m. – 6:00 p.m. Both figures are current published County sources; the department observes a 4-day (Mon–Thu) work week at all locations.. Official information: https://www.navajocountyaz.gov/289/Building-Information.

Unincorporated Navajo County, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 11). Navajo County independently adopts and administers its own construction codes for unincorporated areas through Planning & Development Services / Building & Safety; it does NOT extend onto Navajo Nation, Hopi Tribe, or other tribal trust land, which has its own separate tribal permitting authority outside county jurisdiction. Source: Navajo County Addenda & Additions to the International Building Codes (amended 3-15-22).; 2018 International Residential Code (IRC) and 2018 International Building Code (IBC), adopted by Navajo County, EXCEPT: IRC Chapter 11 (Energy Efficiency); IRC Appendix E (Manufactured Housing Used as Dwellings); IRC § E3902; and IRC Appendices A, D, I, J, K, M, O, Q, R, S are all excluded from adoption. Source: Navajo County Addenda & Additions to the International Building Codes (amended 3-15-22), p.5 'Adopted Codes'.; 2018 International Plumbing Code — inspections are based on the 2017 IPC and cross-referenced with the 2018 Uniform Plumbing Code per the Addenda's Plumbing section. Source: Navajo County Addenda & Additions (amended 3-15-22), p.17.; 2018 International Mechanical Code, adopted alongside the 2018 IRC/IBC electrical, plumbing, and mechanical code family. Source: Navajo County Addenda & Additions (amended 3-15-22), p.5.; 2017 National Electrical Code (NEC) — electrical inspections are based on the 2018 IRC/IBC and referenced with the 2017 NEC. Source: Navajo County Addenda & Additions (amended 3-15-22), pp.5, 17.; Prior code baseline: Navajo County adopted the 2015 IBC/IRC effective June 11, 2019 (replacing a 2006 IBC edition, after the county's ISO Public Protection Classification rating was threatened with a downgrade for an out-of-date code); the county subsequently updated to the current 2018 IRC/IBC family reflected in the March 2022 Addenda & Additions. Source: White Mountain Independent, 'Navajo County updates building code' (wmicentral.com).; Building official has discretion to require an Arizona-registered architect/engineer stamp for any commercial-use structure, and for steel, log, or post/pole-and-beam construction, at the discretion of the Technical Advisory Board and Board of Supervisors. Source: Navajo County Addenda & Additions (amended 3-15-22), p.6.; Commercial buildings exceeding 3,000 sq ft of floor area intended for continuous occupancy of more than 20 persons must be designed and stamped by an engineer registered by the Arizona Board of Technical Registration, per A.R.S. § 32-144. Source: Navajo County Construction Permit Application Instructions (revised January 2, 2025).; Where a conflict exists between codes adopted by Navajo County or the State of Arizona and the Addenda and Additions, the more restrictive provision governs; the Navajo County Technical Advisory Board acts as the Board of Appeals. Source: Navajo County Addenda & Additions (amended 3-15-22), p.5.. Local amendments apply — see the Unincorporated Navajo County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Navajo County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.