Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Navajo County, Arizona.

Reviewed 2026-07-07 · Source

How to schedule

Inspections are requested through the building department below.

Address
1100 E. Thornton Rd., Show Low, AZ 85901 (Show Low/White Mountains area office); additional area offices at 100 W. Public Works Dr., Holbrook, AZ 86025 (928-524-4100) and 2188 W. Country Club Dr., Overgaard, AZ 85933 (928-535-7110)
Phone
928-532-6040
Email
Office hours
Monday–Thursday, 6:30 a.m. – 5:00 p.m. (Planning & Development Services main office and Show Low Building Division, per the department's Planning & Development Services page). The Permit Application Instructions document (revised January 2, 2025) lists slightly different hours for the Show Low office: Monday–Thursday, 7:30 a.m. – 6:00 p.m. Both figures are current published County sources; the department observes a 4-day (Mon–Thu) work week at all locations.

Inspection sequence

Applies to: Residential Building Permit (New Construction, Addition, Accessory Structure)

  1. 1

    Footing / Foundation Steel

    Foundation piers, trenches, or basement excavation and erected forms; footing rebar placed 6 inches below the surface of poured concrete and 3 inches minimum from soil. No footing/foundation inspection given without property lines and required yard setbacks clearly marked.

  2. 2

    Stem Wall Steel

    CMU stem wall reinforcement per the Addenda's foundation/pier tables (rebar sizing and spacing vary by wall height)

  3. 3

    Under-Slab / Under-Floor

    Under-slab copper, sewer, and electrical before concrete placement; under-floor framing before floor sheathing

  4. 4

    Rough-In Framing, Electrical, Plumbing, Venting, Heating

    Combined rough-in inspection; house must be weather-sealed prior to this inspection

  5. 5

    Roof Sheathing / Shear Panel Nail-Off

    Roof sheathing nail spacing (6 inches on edges, 12 inches in field) inspected before roofing material placement

  6. 6

    Drywall Nailing

    Fastener spacing and type per the Addenda's drywall fastener schedule, before taping/finishing

  7. 7

    Final Inspection

    Full Final Inspection Checklist per the Addenda (septic/plumbing operable, electrical panels labeled, GFCI protection verified, smoke detectors, 911 address posted, and more); all utilities must be on and working. A Temporary Certificate of Occupancy may be issued for a single-family dwelling pending minor corrections, contingent on completion within 60 days.

Applies to: Commercial Building Permit

  1. 1

    Foundation

    Before concrete pour — verify footing depth, dimensions, and reinforcement per adopted codes and property-line/setback marking

  2. 2

    Rough-In Framing, Electrical, Plumbing, Venting, Heating

    Combined rough-in inspection prior to wall closure; house/building must be weather-sealed first

  3. 3

    Final Inspection

    All work complete per approved, stamped plans; Certificate of Occupancy issued by Building & Safety

Applies to: Manufactured / Mobile Home Installation Permit

  1. 1

    Site / Setback Verification

    Property lines and required yard setbacks must be clearly marked before any foundation-related inspection

  2. 2

    Utility Connections (Electrical Meter Loop, Septic Hookup)

    No meter-loop (electrical hook-up) permit will be issued unless hook-up to an approved sanitary system is available and documented

  3. 3

    Final Inspection

    All utilities on and working; septic/plumbing in full working order; 911 address posted; per the Addenda's Final Inspection Checklist

Applies to: Septic System Permit (Conventional and Alternative)

  1. 1

    Site Suitability / Percolation Test

    Soil percolation rate (10-120 MPI) or Soil Absorption Rating (.2+) verified before system design approval

  2. 2

    Trench / System Installation Inspection

    Septic system installation verified against approved plans before backfill

  3. 3

    Final Septic Inspection

    System in total working order; required before the associated building/manufactured home final inspection and Certificate of Occupancy

Applies to: Guest House Permit

  1. 1

    Footing / Foundation

    Before concrete pour, property lines and setbacks must be clearly marked

  2. 2

    Final Inspection

    Per the Addenda's Final Inspection Checklist — septic/plumbing operable, electrical panels labeled, GFCI protection, smoke detectors, 911 address posted

Unincorporated Navajo County building permits

Get alerts for Unincorporated Navajo County

We'll email you when Unincorporated Navajo County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.