Skip to main content
PermitBase

Commercial Tenant Improvement Permit in Marana, Arizona

Required for interior or exterior alterations, upgrades, and repairs to an existing commercial building or suite in the Town of Marana. This is a genuinely distinct application track from new commercial construction: the Development Services Forms page publishes a separate 'Tenant Improvement Application Checklist' (rev. 2/13/2017) under an 'Existing Commercial Building' heading (versus the 'New Commercial/Shell Building Application Checklist' under 'New Commercial Building'), and the Town's own 'Do I Need a Certificate of Occupancy for My Business?' guide confirms a Tenant Improvement permit is the specific mechanism required whenever a business makes improvements to a new or existing building or suite, regardless of whether the use is staying the same or changing. Direct comparison of the two checklists confirms real differences, not just a re-labeled form: the Tenant Improvement checklist omits the Soils Report, Truss/Joist Calculations, sewer/septic proof of service, and the T2 Grading Permit/SWPPP prerequisite that the New Commercial/Shell Building checklist requires. Both tracks are billed under the same valuation-based (BOV) fee mechanism, since neither has a dedicated line item in the Comprehensive Fee Schedule.

Verified 2026-08-01 · Source

When you need this permit

  • A Tenant Improvement permit is required for any remodel, alteration, upgrade, or repair to the interior or exterior of an existing commercial building or suite in Marana, per the Town's 'Do I Need a Certificate of Occupancy for My Business?' guide — regardless of whether the business use is staying the same or changing
  • Reviewed against the 2024 IBC and Town of Marana local amendments (Ordinance 2025.013)
  • Tenant Improvement Application Checklist (rev. 2/13/2017) requires: a Site Plan (3 sets) showing lot lines, existing structures, proposed structure dimensions from lot lines and between structures, and location of ADA parking and accessible route; a Construction Plan set (3 sets) covering floor plan, foundation, framing, and cross-section with structural framing details, energy code compliance, mechanical, plumbing, and electrical plans as necessary; and a Structural Plan and calculations (2 sets) if applicable
  • Unlike the New Commercial/Shell Building track, the Tenant Improvement checklist does NOT require a Soils Report, Truss/Joist Calculations, proof of sewer/septic service, or a prerequisite T2 Grading Permit/SWPPP approval
  • A Contractors Business License and a Subcontractor List (the latter required prior to intermediate inspections) must be submitted
  • A Bond Exemption Certificate from the State Bond Compliance Officer (602-716-6056) is required for contractors or homeowners with building projects over $50,000 in value
  • A Floodplain Use Permit may be required from Town of Marana Engineering Department
  • If a business is moving into a space with a different use and making NO physical improvements, the applicable process per the Town's Certificate of Occupancy guide is a separate Change of Occupancy permit, not a Tenant Improvement permit — outside the scope of this entry
  • Owner Applicant Authorization form required if the applicant is not the property owner of record

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Tenant Improvement Building Permit Fee and Plan Review — valuation-based (BOV)Town of Marana Comprehensive Fee Schedule (effective Feb. 6, 2026), Development Services: Building — 'Building Plan Review and Building Permit Fees Not Specifically Listed'; confirmed by direct read of the Fee Schedule PDF that no separate itemized 'Tenant Improvement' fee line exists — it uses the same valuation-based mechanism as new commercial construction
Calculated per Marana Ordinance 2011.15 / Resolution 2011-65 (ICC/Building Valuation Data-based fee table)
Plan review submittals after 2nd submittal and revisions to approved plansCharged to the nearest hour. Town of Marana Comprehensive Fee Schedule (Feb. 6, 2026)
$75.00 per hour
Expedited Building Plan Review (optional)Requires approved Expedited Plan Review Request Form. Town of Marana Comprehensive Fee Schedule (Feb. 6, 2026)
Option 1: plan review fee + 50%; Option 2: plan review fee + 100%

Review timeline

Plan reviewMarana’s published plan-review target
60–180 business days

How long did your Commercial Tenant Improvement Permit permit actually take in Marana?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In (Electrical/Plumbing/Mechanical)

    Trade rough-ins before walls are closed, per 2024 IBC and Town of Marana local amendments

  2. 2

    Final / Certificate of Occupancy

    All work complete per approved plans; per the Town's CO guide, a Tenant Improvement permit provides both the improvement approval and a valid Certificate of Occupancy

See the full Marana inspection guide — scheduling & re-inspection fees →

Tips

  • Marana's Tenant Improvement track is a genuinely separate checklist from new commercial construction, with real differences in submittal requirements (no Soils Report, Truss/Joist Calculations, sewer/septic proof, or T2 Grading Permit/SWPPP prerequisite) — not merely a checkbox variant on a shared form, unlike some other Arizona jurisdictions (e.g., Florence, AZ) where new-build and tenant-improvement scopes share one application.
  • Per the Town's own 'Do I Need a Certificate of Occupancy for My Business?' guide, a Tenant Improvement permit is what provides a tenant BOTH the improvement approval AND a valid Certificate of Occupancy — no additional CO-specific fee is separately itemized beyond the underlying valuation-based building permit fee.
  • Same billing and timeline conventions as new commercial construction: valuation-based (BOV) fee, and the general 60/120/180-calendar-day A.R.S. Section 9-835 ceiling, since no dedicated commercial or tenant-improvement row exists in that document (confirmed by direct review of the 2-page PDF).
  • A different-use tenant making NO physical improvements needs a Change of Occupancy permit instead of a Tenant Improvement permit, per the Town's CO guide — confirm which scenario applies before assuming a Tenant Improvement permit is required.

Frequently asked questions

Marana requires a commercial tenant improvement permit for: A Tenant Improvement permit is required for any remodel, alteration, upgrade, or repair to the interior or exterior of an existing commercial building or suite in Marana, per the Town's 'Do I Need a Certificate of Occupancy for My Business?' guide — regardless of whether the business use is staying the same or changing; Reviewed against the 2024 IBC and Town of Marana local amendments (Ordinance 2025.013); Tenant Improvement Application Checklist (rev. 2/13/2017) requires: a Site Plan (3 sets) showing lot lines, existing structures, proposed structure dimensions from lot lines and between structures, and location of ADA parking and accessible route; a Construction Plan set (3 sets) covering floor plan, foundation, framing, and cross-section with structural framing details, energy code compliance, mechanical, plumbing, and electrical plans as necessary; and a Structural Plan and calculations (2 sets) if applicable; Unlike the New Commercial/Shell Building track, the Tenant Improvement checklist does NOT require a Soils Report, Truss/Joist Calculations, proof of sewer/septic service, or a prerequisite T2 Grading Permit/SWPPP approval; A Contractors Business License and a Subcontractor List (the latter required prior to intermediate inspections) must be submitted; A Bond Exemption Certificate from the State Bond Compliance Officer (602-716-6056) is required for contractors or homeowners with building projects over $50,000 in value; A Floodplain Use Permit may be required from Town of Marana Engineering Department; If a business is moving into a space with a different use and making NO physical improvements, the applicable process per the Town's Certificate of Occupancy guide is a separate Change of Occupancy permit, not a Tenant Improvement permit — outside the scope of this entry; Owner Applicant Authorization form required if the applicant is not the property owner of record. If your project isn't listed, confirm with Town of Marana Development Services Department — Building Safety at 520-382-2600 before starting work.

In Marana, the published Tenant Improvement Building Permit Fee and Plan Review — valuation-based (BOV) is: Calculated per Marana Ordinance 2011.15 / Resolution 2011-65 (ICC/Building Valuation Data-based fee table). Additional published fees: Plan review submittals after 2nd submittal and revisions to approved plans — $75.00 per hour; Expedited Building Plan Review (optional) — Option 1: plan review fee + 50%; Option 2: plan review fee + 100%. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Marana's published plan-review target for a commercial tenant improvement permit is 60–180 business days.

You'll need: Permit Application; Tenant Improvement Application Checklist (rev. 2/13/2017); Site Plan (3 sets); Construction Plan Set (3 sets). Depending on your project, Marana may also ask for: Owner Applicant Authorization Form; Structural Plan and Calculations (2 sets); Bond Exemption Certificate. See the required-documents checklist on this page for details on each.

Marana requires 2 inspection(s) for a commercial tenant improvement permit, in order: Rough-In (Electrical/Plumbing/Mechanical), Final / Certificate of Occupancy. Schedule each through Town of Marana Development Services Department — Building Safety (520-382-2600).

Apply through Town of Marana Development Services Department — Building Safety at Ed Honea Marana Municipal Complex, Development Services Counter, 2nd Floor, Bldg. A2, 11555 W. Civic Center Drive, Marana, AZ 85653. Phone: 520-382-2600, email: maranaplanning@maranaaz.gov. Office hours: Monday - Friday, 8:00 a.m. - 5:00 p.m. Walk-in customers welcome at the Development Services Counter (One-Stop Shop) on the 2nd floor of the Marana Municipal Complex. Applications and plans are submitted via the Permit Tracker (eTRAKiT) online portal at maranaegov.com/etrakit or in person at the Development Services Counter. Inspections are scheduled through Permit Tracker (contractors) or by calling the inspection line at 520-382-2637 and leaving a voicemail (homeowners); inspections are performed Monday - Friday, 7:00 a.m. - 3:00 p.m., and can be scheduled as early as the next business day if requested before 3:00 p.m.. Official information: https://www.maranaaz.gov/Departments/Development-Services.

Yes. Per the Town's 'Do I Need a Certificate of Occupancy for My Business?' guide, a Tenant Improvement permit is required for any improvements to a new or existing building or suite, regardless of whether the use is staying the same or changing, and it is also the mechanism that provides a valid Certificate of Occupancy for the space.

Yes. The Town publishes a distinct 'Tenant Improvement Application Checklist' (rev. 2/13/2017), separate from the 'New Commercial/Shell Building Application Checklist,' with fewer submittal requirements — no Soils Report, Truss/Joist Calculations, sewer/septic proof of service, or prerequisite T2 Grading Permit/SWPPP approval.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Marana.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.