Residential Building Permit (New Custom Home / Model Home / SFR-Based-on-Model) — Marana, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.maranaaz.gov/Departments/Development-Services/Development-Services-Forms
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Custom Home / Model Home / SFR-Based-on-Model) in Marana, Arizona
Required for new single-family residential construction in the Town of Marana, whether a one-time Custom Home, a reproducible Model Home plan, or a new SFR built from a previously-approved model. Reviewed against the 2024 IRC and Town of Marana local amendments (effective for applications submitted after July 18, 2025, per Ordinance 2025.013). Applications are submitted through the Permit Tracker (eTRAKiT) online portal or in person at the Development Services Counter.
Verified 2026-07-06 · Source
When you need this permit
- Building permit required for new single-family residential construction within Town of Marana limits, using the Custom Home, Model Home, or SFR-Based-on-a-Model application track depending on project type
- Plans must comply with the 2024 IRC and Town of Marana local amendments (Exhibit D), including the Town's Building Safety Design Criteria (115 mph residential wind design; Seismic Design Category B; 32°F winter design temperature; moderate-to-heavy termite potential; 0 ground snow load)
- Custom Home Application Checklist (rev. 2017.02.13) applies to one-time, site-specific builds with no reproducible options; Model Home Application Checklist applies to reproducible plans (with a limited number of options); New SFR (Based on a Model) Application Checklist applies once the underlying model plan and any deferred submittals are approved and issued
- Owner Applicant Authorization form required if the applicant is not the property owner of record
- Submittal via the Permit Tracker (eTRAKiT) online portal at maranaegov.com/etrakit, or in person at the Development Services Counter, 2nd Floor, Marana Municipal Complex
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour
- 2
Framing
Structural framing, connections, egress per 2024 IRC and Town of Marana Design Criteria
- 3
Rough-In (Electrical/Plumbing/Mechanical)
Trade rough-ins before walls are closed
- 4
Final
All work complete per approved plans, verified using the Building Final Inspection Checklist before Certificate of Occupancy
See the full Marana inspection guide — scheduling & re-inspection fees →
Tips
- Per the Town's A.R.S. Section 9-835 Licensing Time Frames document, a single-family residence permit valued up to $500,000 has a maximum overall time frame of 60 calendar days (30 for administrative completeness, 30 for substantive review); above $500,000 the maximum overall time frame extends to 120 calendar days (45/75). These are ceiling figures — the Town states most applications process in substantially less time.
- A Custom Home permit is for a single, site-specific build with no reproducible options; a Model Home permit is for a reproducible plan (with a limited number of options) that can later support multiple SFR-Based-on-Model permits without a full new plan review.
- Inspections are scheduled through the Permit Tracker (eTRAKiT) portal for contractors, or by leaving a voicemail at the homeowner inspection line (520-382-2637); requests before 3:00 p.m. can be scheduled as early as the next business day.
- A floodplain use permit may be required in addition to this building permit if the property is in a mapped floodplain — check with Marana Floodplain Management before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Marana building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Marana
Residential Building Permit (New Custom Home / Model Home / SFR-Based-on-Model) in other cities
Look up this fee in a different city →
Now live
Build your Marana project checklist
Describe your project once and get every permit, document, and fee it triggers in Marana — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →