Commercial Building Permit (New Commercial / Shell Building) in Marana, Arizona

Required for new commercial building and shell-building construction in the Town of Marana, reviewed against the 2024 IBC and Town of Marana local amendments (Ordinance 2025.013, effective for applications submitted after July 18, 2025). The Town of Marana maintains a genuinely distinct process track for tenant improvement work: the Development Services Forms page publishes a separate 'Tenant Improvement Application Checklist' (rev. 2/13/2017) under an 'Existing Commercial Building' heading, distinct from the 'New Commercial/Shell Building Application Checklist' (rev. 2/13/2017) under 'New Commercial Building' used here. Direct comparison of the two checklists shows the Tenant Improvement track genuinely omits several New Commercial/Shell Building requirements (Soils Report, Truss/Joist Calculations, proof of sewer/septic service, and the prerequisite T2 Grading Permit/SWPPP approval) rather than merely re-labeling the same form — see this file's separate commercial-tenant-improvement-permit entry.

Verified 2026-08-01 · Source

When you need this permit

  • Building permit required for new commercial building or shell-building construction within Town of Marana limits, submitted under the 'New Commercial Building' application track on the Development Services Forms page
  • Plans must comply with the 2024 IBC and Town of Marana local amendments (Ordinance 2025.013), including the Town's Building Safety Design Criteria (commercial wind design per ASCE 7-16; Seismic Design Category B)
  • New Commercial/Shell Building Application Checklist (rev. 2/13/2017) requires: a Site Plan (3 sets) showing lot lines, existing structures, proposed structure dimensions from lot lines and between structures, proposed utility locations, and ADA parking/accessible route; a Construction Plan set (3 sets) covering architectural, foundation, framing, structural cross-section, energy code compliance, mechanical, plumbing, and electrical plans as applicable; a Project/Specifications Manual (2 sets) if not included on the Construction Plans; a Structural Plan and calculations (2 sets) if applicable; a Soils Report (2 sets); and Truss/Joist Calculations (2 sets) with verification of Engineer of Record review
  • A T2 Grading Permit application (Town of Marana Engineering Department, 520-382-2600) is required prior to building permit issuance for new commercial construction, and a Storm Water Pollution Prevention Plan (SWPPP) approval from the Town's Environmental Project Coordinator is required prior to grading permit issuance
  • Proof of sewer service is required: either a sewer receipt issued by the appropriate jurisdiction (Pima County RWRD or Town of Marana), or, for new septic systems, a copy of the Construction Authorization from Pima County Building and Site Development
  • A Contractors Business License and a Subcontractor List (the latter required prior to intermediate inspections) must be submitted
  • A Bond Exemption Certificate from the State Bond Compliance Officer (602-716-6056) is required for contractors or homeowners with building projects over $50,000 in value
  • A Floodplain Use Permit may be required from Town of Marana Engineering, and a submittal fee (impact fees may apply) is due at submittal per the Application Checklist
  • Owner Applicant Authorization form required if the applicant is not the property owner of record

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 6 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Commercial Building Permit Fee and Plan Review — valuation-based (BOV)Town of Marana Comprehensive Fee Schedule (effective Feb. 6, 2026), Development Services: Building — 'Building Plan Review and Building Permit Fees Not Specifically Listed'; confirmed by direct read of the Fee Schedule PDF that no separate itemized fee line exists for 'New Commercial/Shell Building' — it uses the same valuation-based mechanism as this file's other building-permit entries
Calculated per Marana Ordinance 2011.15 / Resolution 2011-65 (ICC/Building Valuation Data-based fee table)
Plan review submittals after 2nd submittal and revisions to approved plansCharged to the nearest hour. Town of Marana Comprehensive Fee Schedule (Feb. 6, 2026)
$75.00 per hour
Expedited Building Plan Review (optional)Requires approved Expedited Plan Review Request Form. Town of Marana Comprehensive Fee Schedule (Feb. 6, 2026)
Option 1: plan review fee + 50%; Option 2: plan review fee + 100%
Deferred Building Permit SubmittalsApplies when Truss/Joist Calculations (or other specialty systems) are deferred, per the New Commercial/Shell Building Application Checklist's instruction to note deferral on the Construction Plan Index Sheet; does not apply to fire sprinkler systems, ventilation hoods, or fire alarms. Town of Marana Comprehensive Fee Schedule (Feb. 6, 2026)
$200.00 per submittal

Review timeline

Plan reviewMarana’s published plan-review target
60–180 business days

How long did your Commercial Building Permit (New Commercial / Shell Building) permit actually take in Marana?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing and connections per 2024 IBC and Town of Marana Design Criteria

  3. 3

    Rough-In (Electrical/Plumbing/Mechanical)

    Trade rough-ins before walls are closed

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans; a Certificate of Occupancy is issued upon successful final inspection

See the full Marana inspection guide — scheduling & re-inspection fees →

Tips

  • Marana maintains genuinely separate application checklists for New Commercial/Shell Building versus Tenant Improvement — see this file's commercial-tenant-improvement-permit entry. The Tenant Improvement checklist omits the Soils Report, Truss/Joist Calculations, sewer/septic proof of service, and the T2 Grading Permit/SWPPP prerequisites required here for new construction.
  • Neither the New Commercial/Shell Building nor Tenant Improvement track has its own itemized fee line in the Comprehensive Fee Schedule; both are billed under the same valuation-based (BOV) 'Building Plan Review and Building Permit Fees Not Specifically Listed' mechanism, confirmed by direct read of the Fee Schedule's Development Services: Building section.
  • Per direct review of the Town's 2-page A.R.S. Section 9-835 Licensing Time Frames document, there is no commercial-specific row — commercial building permits fall under the general 'Building permit (not listed elsewhere)' maximum time frame of 60/120/180 calendar days, the same ceiling documented for electrical, plumbing, mechanical, roofing, fence, demolition, and pool permits elsewhere in this file.
  • A T2 Grading Permit (Engineering Department) and SWPPP approval are prerequisites to building permit issuance for new commercial construction — budget lead time for these before submitting the building permit application.
  • Deferred Truss/Joist submittals carry a $200 per-submittal fee; add a note to the Construction Plan Index Sheet if deferring.

Frequently asked questions

Marana requires a commercial building permit (new commercial / shell building) for: Building permit required for new commercial building or shell-building construction within Town of Marana limits, submitted under the 'New Commercial Building' application track on the Development Services Forms page; Plans must comply with the 2024 IBC and Town of Marana local amendments (Ordinance 2025.013), including the Town's Building Safety Design Criteria (commercial wind design per ASCE 7-16; Seismic Design Category B); New Commercial/Shell Building Application Checklist (rev. 2/13/2017) requires: a Site Plan (3 sets) showing lot lines, existing structures, proposed structure dimensions from lot lines and between structures, proposed utility locations, and ADA parking/accessible route; a Construction Plan set (3 sets) covering architectural, foundation, framing, structural cross-section, energy code compliance, mechanical, plumbing, and electrical plans as applicable; a Project/Specifications Manual (2 sets) if not included on the Construction Plans; a Structural Plan and calculations (2 sets) if applicable; a Soils Report (2 sets); and Truss/Joist Calculations (2 sets) with verification of Engineer of Record review; A T2 Grading Permit application (Town of Marana Engineering Department, 520-382-2600) is required prior to building permit issuance for new commercial construction, and a Storm Water Pollution Prevention Plan (SWPPP) approval from the Town's Environmental Project Coordinator is required prior to grading permit issuance; Proof of sewer service is required: either a sewer receipt issued by the appropriate jurisdiction (Pima County RWRD or Town of Marana), or, for new septic systems, a copy of the Construction Authorization from Pima County Building and Site Development; A Contractors Business License and a Subcontractor List (the latter required prior to intermediate inspections) must be submitted; A Bond Exemption Certificate from the State Bond Compliance Officer (602-716-6056) is required for contractors or homeowners with building projects over $50,000 in value; A Floodplain Use Permit may be required from Town of Marana Engineering, and a submittal fee (impact fees may apply) is due at submittal per the Application Checklist; Owner Applicant Authorization form required if the applicant is not the property owner of record. If your project isn't listed, confirm with Town of Marana Development Services Department — Building Safety at 520-382-2600 before starting work.

In Marana, the published Commercial Building Permit Fee and Plan Review — valuation-based (BOV) is: Calculated per Marana Ordinance 2011.15 / Resolution 2011-65 (ICC/Building Valuation Data-based fee table). Additional published fees: Plan review submittals after 2nd submittal and revisions to approved plans — $75.00 per hour; Expedited Building Plan Review (optional) — Option 1: plan review fee + 50%; Option 2: plan review fee + 100%; Deferred Building Permit Submittals — $200.00 per submittal. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the Town's A.R.S. Section 9-835 Licensing Time Frames document, commercial building permits are not one of the specifically itemized rows, so they fall under the general 'Building permit (not listed elsewhere)' maximum time frame: 60 calendar days for administrative completeness, 120 for substantive review, 180 overall. These are ceiling figures — the Town states most applications process in substantially less time.

You'll need: Permit Application; New Commercial/Shell Building Application Checklist (rev. 2/13/2017); Site Plan (3 sets); Construction Plan Set (3 sets); Soils Report (2 sets); Sewer Receipt or Septic Construction Authorization. Depending on your project, Marana may also ask for: Owner Applicant Authorization Form; Truss/Joist Calculations (2 sets); T2 Grading Permit Application; Bond Exemption Certificate. See the required-documents checklist on this page for details on each.

Marana requires 4 inspection(s) for a commercial building permit (new commercial / shell building), in order: Foundation/Footing, Framing, Rough-In (Electrical/Plumbing/Mechanical), Final / Certificate of Occupancy. Schedule each through Town of Marana Development Services Department — Building Safety (520-382-2600).

Apply through Town of Marana Development Services Department — Building Safety at Ed Honea Marana Municipal Complex, Development Services Counter, 2nd Floor, Bldg. A2, 11555 W. Civic Center Drive, Marana, AZ 85653. Phone: 520-382-2600, email: maranaplanning@maranaaz.gov. Office hours: Monday - Friday, 8:00 a.m. - 5:00 p.m. Walk-in customers welcome at the Development Services Counter (One-Stop Shop) on the 2nd floor of the Marana Municipal Complex. Applications and plans are submitted via the Permit Tracker (eTRAKiT) online portal at maranaegov.com/etrakit or in person at the Development Services Counter. Inspections are scheduled through Permit Tracker (contractors) or by calling the inspection line at 520-382-2637 and leaving a voicemail (homeowners); inspections are performed Monday - Friday, 7:00 a.m. - 3:00 p.m., and can be scheduled as early as the next business day if requested before 3:00 p.m.. Official information: https://www.maranaaz.gov/Departments/Development-Services.

Marana, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town/county authority under state enabling statutes (A.R.S. Title 9 for municipalities). The Town of Marana independently adopts and administers its own construction codes through its Development Services Department / Building Safety division and does not defer permitting to Pima County or Pinal County. Source: Town of Marana Building Code Amendments page (maranaaz.gov/Departments/Development-Services/Building-Code-Amendments) and Marana Town Code Chapter 7-1 (Building Codes).; 2024 International Building Code (IBC), adopted by reference with Town of Marana local amendments (Marana Town Code Section 7-1-2). The Marana Town Council adopted this code cycle via Ordinance 2025.013 on June 17, 2025; all new applications received after July 18, 2025 must comply, while plans already in review or approved before that date may remain on the prior (2018) code cycle. Source: Town of Marana Building Code Amendments page; Ordinance 2025.013.; 2024 International Residential Code (IRC), adopted by reference with Town of Marana local amendments (Exhibit D to Ordinance 2025.013), effective for new applications after July 18, 2025. Source: Town of Marana Building Code Amendments page; Ordinance 2025.013; Exhibit D — Amendments to 2024 IRC.; 2024 International Existing Building Code (IEBC), adopted by reference with local amendments (Exhibit B), effective July 18, 2025. Source: Town of Marana Building Code Amendments page; Ordinance 2025.013.; 2024 International Plumbing Code (IPC), adopted by reference with local amendments (Exhibit C), effective July 18, 2025. Source: Town of Marana Building Code Amendments page; Ordinance 2025.013.; 2024 International Mechanical Code (IMC), adopted by reference with local amendments (Exhibit E), effective July 18, 2025. Source: Town of Marana Building Code Amendments page; Ordinance 2025.013.; 2024 International Fuel Gas Code (IFGC), adopted by reference with local amendments (Exhibit I), effective July 18, 2025. Source: Town of Marana Building Code Amendments page; Ordinance 2025.013.; 2024 International Fire Code (IFC), adopted by reference with local amendments (Exhibit H) as the Town's uniform fire code, effective July 18, 2025; the Town issues the permit but inspections for fire-code compliance are completed by the serving fire district. Source: Town of Marana Building Code Amendments page; Ordinance 2025.013; Development Services Forms page (Fire Permits section).; 2023 National Electrical Code (NEC), adopted by reference with local amendments (Exhibit G), effective July 18, 2025 — one edition behind the 2024 ICC set, consistent with the national NEC 3-year cycle. Source: Town of Marana Building Code Amendments page; Ordinance 2025.013.; 2024 International Property Maintenance Code (IPMC), adopted by reference with local amendments (Exhibit F), effective July 18, 2025. Source: Town of Marana Building Code Amendments page; Ordinance 2025.013.; 2024 International Swimming Pool and Spa Code (ISPSC), adopted by reference with local amendments (Exhibit J), effective July 18, 2025. Source: Town of Marana Building Code Amendments page; Ordinance 2025.013.; 2018 International Energy Conservation Code (IECC), adopted by reference with local amendments (Exhibit G to Ordinance 2019.011) — the Town has NOT moved to a newer IECC cycle alongside the 2024 ICC suite; the 2018 edition remains in force. Source: Town of Marana Building Code Amendments page; Ordinance 2019.011.; 2021 Town of Marana Outdoor Lighting Code, adopted by reference (Ordinance 2021.007), governing dark-sky/lighting-area requirements Town-wide with an accompanying Lighting Area Map. Source: Town of Marana Building Code Amendments page; Ordinance 2021.007.; Manufactured homes and factory-built buildings follow a dedicated Manufactured Homes Procedural Guide (rev. 2019.01.18) for site placement, foundation, and zoning compliance, administered by Development Services Planning in coordination with Building Safety. Source: Town of Marana Development Services Forms page (Manufactured Home section).. Local amendments apply — see the Marana overview page for the full list.

Yes. The Town's Development Services Forms page lists a 'Tenant Improvement Application Checklist' (rev. 2/13/2017) under 'Existing Commercial Building,' distinct from the 'New Commercial/Shell Building Application Checklist' used here for new construction. Direct comparison shows the Tenant Improvement checklist genuinely omits several new-construction-only requirements (Soils Report, Truss/Joist Calculations, sewer/septic proof, and the T2 Grading Permit/SWPPP prerequisite).

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Marana.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.