Skip to main content
PermitBase

Plumbing Permit in South Tucson, Arizona

Required for gas line pressure tests and water heater installation/replacement in South Tucson, governed by the 2018 International Plumbing Code (IPC) and 2018 International Fuel Gas Code (IFGC) as adopted and amended by the City of South Tucson under Ordinance No. 25-01.

Verified 2026-07-07 · Source

When you need this permit

  • Permit required for gas line pressure tests (new or replacement lines) and installation or replacement of water heaters -- responsibility of the homeowner/property owner to submit plans and secure the permit
  • Governed by the 2018 IPC and 2018 IFGC as adopted and amended by the City of South Tucson
  • If new work is involved (e.g., replacing gas piping), a detailed plan may be required to obtain the permit
  • Apply via the City's Online Permit Portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Permit Fee (valuation-based)No numeric fee schedule for plumbing/gas permits is published on the City of South Tucson website; cost is stated only as valuation-dependent
Not published -- see the residential-building-permit type's fee entry for the full chase-trail documentation of this confirmed gap

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in South Tucson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In / Pressure Test

    Gas piping pressure test before concealment; water piping rough-in verified before walls closed

  2. 2

    Final

    Fixtures/water heater connected and verified, no leaks, per adopted 2018 IPC/IFGC

See the full South Tucson inspection guide — scheduling & re-inspection fees →

Tips

  • CONFIRMED GAP -- review timeline: see the identical chase-trail note under the residential-building-permit type; no published time frame exists specifically for plumbing/gas permits.
  • A detailed plan is only required for NEW plumbing/gas work (e.g., new gas line routing); a straight like-for-like water heater swap is described on the Submittal Checklist as one of the routine homeowner-responsibility permit types without a stated additional plan requirement.

Frequently asked questions

Yes. The City's Permit Application & Submittal Checklist explicitly lists 'Installation or replacement of water heaters' as one of the permit types that is the property owner's responsibility to secure. Source: City of South Tucson Permit Application & Submittal Checklist page.

In South Tucson, the published Plumbing Permit Fee (valuation-based) is: Not published -- see the residential-building-permit type's fee entry for the full chase-trail documentation of this confirmed gap. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

South Tucson does not publish a plan-review timeline for this permit. Contact City of South Tucson Planning, Zoning and Development Services Department (Development Services Division) at 520-792-2424 for current turnaround.

You'll need: City of South Tucson Permit Application (Online Permit Portal). Depending on your project, South Tucson may also ask for: Gas Piping Plan. See the required-documents checklist on this page for details on each.

South Tucson requires 2 inspection(s) for a plumbing permit, in order: Rough-In / Pressure Test, Final. Schedule each through City of South Tucson Planning, Zoning and Development Services Department (Development Services Division) (520-792-2424).

Apply through City of South Tucson Planning, Zoning and Development Services Department (Development Services Division) at South Tucson City Hall, 1601 S. 6th Ave., South Tucson, AZ 85713. Phone: 520-792-2424, email: submittals@southtucsonaz.gov. Office hours: Monday - Friday, 8:00 a.m. - 5:00 p.m. Permit applications are submitted through the City's Online Permit Portal (live effective March 2, 2026), in person, or by mail/shipment to City Hall; applications require 2 digital copies of a site plan and a floor plan. Inspections are conducted Mondays and Wednesdays, 7:00-9:00 a.m., with requests submitted the business day before.. Official information: https://www.southtucsonaz.gov/devservices/page/permits.

South Tucson, Arizona has adopted: South Tucson is a separately incorporated city (population roughly 5,000, land area approximately 1 square mile) that is entirely surrounded by, but administratively and legally independent of, the City of Tucson -- it is sometimes called 'The Pueblo within a City.' South Tucson runs its own Planning, Zoning and Development Services Department, which independently reviews building plans and issues its own building, electrical, plumbing, mechanical/HVAC, sign, demolition, and remodel permits; it does NOT contract building-permit administration to the City of Tucson or to Pima County. Source: City of South Tucson Development Services and Permits page (southtucsonaz.gov/devservices) and City of South Tucson Permits page (southtucsonaz.gov/devservices/page/permits), both confirming an independent Development Services Division that 'reviews and conducts all inspections related to construction and enforcement within the City.'; Arizona has no mandatory statewide building code floor -- code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The City of South Tucson's currently adopted codes (per 'City of South Tucson Adopted Building Codes, Ordinance No. 25-01') are: 2018 International Building Code (IBC); 2018 International Residential Code (IRC); 2017 National Electrical Code (NEC) (one edition behind the 2018-cycle ICC set); 2018 International Mechanical Code (IMC); 2018 International Plumbing Code (IPC); 2018 International Fuel Gas Code (IFGC); 2018 International Energy Conservation Code (IECC); 2018 International Existing Building Code (IEBC); 2018 International Property Maintenance Code (IPMC); 2018 International Swimming Pool and Spa Code (ISPSC); 2018 International Fire Code (IFC); the 2012 City of Tucson/Pima County Outdoor Lighting Code; Arizona Administrative Code Title 18, Chapter 5, Article 2 (Public and Semipublic Swimming Pools and Spas); and ICC A117.1-2009 (Accessible and Usable Buildings and Facilities). Source: 'CITY OF SOUTH TUCSON ADOPTED BUILDING CODES, ORDINANCE NO: 25-01' (southtucsonaz.gov/media/10481) and southtucsonaz.gov/devservices/page/permits.; These 2018-cycle codes (and the 2017 NEC) are meaningfully older than the 2024-cycle codes/2023 NEC already adopted by the neighboring, separately-verified City of Tucson and unincorporated Pima County jurisdictions in this dataset -- South Tucson has not yet moved to the 2024 ICC cycle as of this review. Source: Ordinance No. 25-01 (southtucsonaz.gov/media/10486) and the individual 'ST 2018 [Code] AMENDMENTS' documents published on the Permits page.; Each adopted code carries City of South Tucson local amendments published as standalone PDFs per code (e.g., 'ST 2018 International Building Code AMENDMENTS', 'ST 2017 National Electrical Code AMENDMENTS', etc.), all linked from the Permits page. Source: southtucsonaz.gov/devservices/page/permits.; New construction, alterations, modifications, or tenant improvements to commercial properties/structures require construction plans drawn by a professional licensed and registered with the Arizona Board of Technical Registration (architect, mechanical engineer, plumbing engineer, or electrical engineer as applicable to the scope); all such registered professionals conducting business within City limits must also hold an active City of South Tucson business license. Source: southtucsonaz.gov/devservices/page/permits.; All contractors, whether working on residential or commercial properties, must be licensed through the Arizona Registrar of Contractors in the applicable classification, and must hold an active City of South Tucson business license to conduct business within city limits. Source: southtucsonaz.gov/devservices/page/permits.. Local amendments apply — see the South Tucson overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Tucson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.