Solar Photovoltaic (PV) Permit in South Tucson, Arizona
Required for installing a rooftop or ground-mount photovoltaic system within City of South Tucson limits. No dedicated solar/photovoltaic permit, application, or fee line is published by the City — a solar installation is permitted as TWO components of the City's existing general process: a Building Permit (structural/roof-mount, 2018 IBC/IRC as adopted under Ordinance No. 25-01) and an Electrical Permit (PV electrical connection, 2017 NEC as adopted under the same ordinance), both valuation-based with no numeric fee schedule published by the City.
Verified 2026-07-20 · Source
When you need this permit
- Building Permit required for the structural/roof-mount or ground-mount component, submitted through the City's Online Permit Portal, in person, or by mail to City Hall
- Electrical Permit required separately for the PV system's electrical connection, governed by the 2017 NEC as adopted and amended under Ordinance No. 25-01
- 2 digital copies of a site plan and a floor plan required for application submittal
- No dedicated solar/photovoltaic application form, checklist, or valuation-fee table was found published by the City as of this research pass
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full South Tucson inspection guide — scheduling & re-inspection fees →
Tips
- South Tucson has no dedicated solar/PV permit — apply for a standard Building Permit (structural component) and a standard Electrical Permit (PV connection) separately, both under the City's own adopted 2018 IBC/IRC and 2017 NEC (Ordinance No. 25-01).
- Neither permit's fee is published anywhere online as a numeric table — South Tucson deleted the ICC model valuation-fee table from its adopted code and defers to a separate fee ordinance that could not be located in text-extractable form during this research pass. Confirm the current cost directly with Development Services before applying.
- Inspections in South Tucson are conducted only Mondays and Wednesdays, 7:00-9:00 a.m., with requests due the business day before — budget for this limited inspection window when scheduling a solar install.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Tucson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in South Tucson
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your South Tucson project checklist
Describe your project once and get every permit, document, and fee it triggers in South Tucson — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →