Coolidge building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Coolidge, Arizona.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 131 W. Pinkley Avenue, Coolidge, AZ 85128
- Phone
- 520-723-6075
- Office hours
- Monday - Friday, 8 a.m. - 5 p.m. Inspection requests are handled via a separate Inspection Line (520-723-6049); inspections take place the next business day if the Inspection Request Form is received by 3:30 p.m. the prior business day (no inspections on holidays/weekends). Building Official: Bill Jones (wjones@coolidgeaz.com). FAX 520-723-6079, TDD 520-723-4653.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour; verifies 18-inch minimum foundation depth and 10-inch minimum spread footing thickness per City of Coolidge amendments
- 2
Framing
Structural framing, connections, and egress per 2018 IRC and City of Coolidge amendments (metal framing anchors, floor-to-floor strap ties, truss-to-top-plate connections)
- 3
Building Weather-Tight (Frame Inspection)
Building must be weather-tight at the time of the frame inspection per Coolidge amendment to §110.304
- 4
Final / Certificate of Occupancy
All work complete per approved plans; building address numbers (4-inch minimum, durable material) must be displayed prior to final inspection/CO issuance
Applies to: Residential Addition / Remodel Permit
- 1
Foundation/Footing
Required before concrete pour; addition foundations must be tied to the existing foundation per City amendment
- 2
Framing
Structural connections to the existing structure
- 3
Final
Completed work verified against approved plans
Applies to: Sign Permit
- 1
Footing
Required for all detached (freestanding/monument/pole-style) signs, including when square footage or panels are added to an existing detached sign (Zoning Code §1108.E.13.a)
- 2
Electrical
Required on all signs prior to placement if the sign is electrically illuminated (Zoning Code §1108.E.13.b)
- 3
Final
Covers sign location, structural members, and placement of the insignia/copy against the approved permit (Zoning Code §1108.E.13.c)
Applies to: Swimming Pool / Spa Permit
- 1
Pre-Gunite/Excavation
Steel and plumbing rough-in verified before concrete shell placement
- 2
Electrical Bonding
Equipotential bonding grid and underwater lighting circuits verified before backfill/deck pour
- 3
Final
Pool barrier/fence (if applicable), equipment pad, and completed pool verified against approved plans and the 2018 ISPSC
Applies to: Electric Vehicle Charging Station Permit
- 1
Rough-In
New circuit wiring/conduit inspected before concealment
- 2
Final
Charger outlet or hardwired unit installed and connected, inspected before energizing
Applies to: Electrical Permit
- 1
Rough-In
Conduit, semi-rigid piping, or wiring inspected after installation but before concealment
- 2
Final
All conduit, wires, fixtures, and equipment (including covers) installed and connected, inspected before energizing
Applies to: Fence and Wall Permit
- 1
Footing
Required for block/masonry walls before backfill
- 2
Final
Completed fence/wall verified against approved plans, including pool barrier compliance where applicable
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment placement inspected before walls are closed
- 2
Final
Equipment operational; clearances and combustion air verified
Applies to: Plumbing Permit
- 1
Underground/Rough-In
Sewer, drainage, vent, water, and gas distribution systems inspected before burial or concealment
- 2
Final
All fixtures set and operating (or ready to operate pending utility connection); tests performed per building official and adopted plumbing code
Applies to: Residential Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement inspected before energizing
- 2
Final
Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified
Final inspection only: Certificate of Occupancy / Change of Use, Demolition Permit, Fire Sprinkler & Fire Alarm System Permit, Re-Roofing Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coolidge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Coolidge building permits
Get alerts for Coolidge
We'll email you when Coolidge's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.