Required for new construction, additions, remodels, and tenant improvements (interior buildouts) to commercial/non-residential buildings in Coolidge, reviewed against the 2018 IBC as adopted and amended by the City (Ordinance No. 23-13). The City of Coolidge Commercial Plan Submittal guidance and Commercial Permit Application treat new construction, remodeling, and improvements to commercial structures as a single undifferentiated commercial permit process -- no separate tenant-improvement permit type, application, or fee schedule was found on the City's website, so TI work is folded into this general commercial building permit.

Verified 2026-07-29 · Source

When you need this permit

  • Building permit required for new commercial building construction, additions, remodels, and tenant improvements to existing commercial/non-residential structures within Coolidge city limits; one complete application is submitted per structure
  • Plans and structural analysis must comply with the 2018 IBC, 2018 International Fire/Mechanical/Plumbing/Fuel Gas Codes, 2017 NEC, and ICC/ANSI A117.1-2009 Accessibility Code, per City of Coolidge Ordinance No. 23-13 and the City's Commercial Plan Submittal guidance
  • Commercial (IBC) design criteria per the Commercial Plan Submittal guidance: 115 mph wind speed (Exposure C), Seismic Zone B -- this differs from the City's residential (IRC) design criteria of 90 mph wind speed used for one- and two-family dwellings under Ordinance No. 23-13, Exhibit B
  • Complete plan sets and structural calculations must be professionally sealed and stamped by an Arizona-registered design professional, per A.R.S. § 32-1121
  • Required plan content includes a cover page (construction notes, design summary/data, occupancy and occupant load, life safety, vicinity map, site plan, parking layout) plus civil, architectural, structural, mechanical, plumbing, and electrical drawings, elevations/cross-sections, a fire protection outline, and a geotechnical report at time of submittal
  • A complete asbestos survey must be conducted prior to any demolition or remodel work, and Air Quality permits must be secured from Pinal County Air Quality Control (520-866-6929) before work commences
  • Fire protection systems (fire sprinkler, alarms, suppression systems, commercial hood/Ansul systems) require separate submittals directly to the Development Services Office as distinct Fire permits -- not covered by the general commercial building permit
  • Separate building permits are required for fencing/screening and for signs; these are not included within the commercial building permit
  • Licensed Arizona contractor required per A.R.S. § 32-1122, unless filing an Owner/Builder Declaration under A.R.S. § 32-1121 Owner-builder

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee -- Based on Valuation (Article 3 table)City of Coolidge Building Permit Fee Schedule, Articles 2-3; Table II lists distinct per-square-foot valuation rates for each IBC occupancy group and construction type combination -- specific commercial per-sq-ft figures were not extracted with confidence from the table's image-based PDF layout, so no individual group/type dollar figure is asserted here beyond the mechanism itself
Same valuation-based fee table as the Residential Building Permit (see that permit type's fee table for the full breakpoint schedule), but the underlying construction valuation is computed from Table II (Building Valuation Data) using the applicable IBC occupancy group (Groups A-1 through U) and construction type (Types IA-VB), rather than the residential R-3/R-4 rows
Plan Review FeeCity of Coolidge Building Permit Fee Schedule, Section II; due at time of application submittal, per Coolidge City Code §109.3 as amended by Ordinance No. 23-13
65% of the calculated Building Permit Fee
New Commercial Building Electrical/Mechanical/Plumbing System FeeCity of Coolidge Building Permit Fee Schedule, Articles 4-6, 'New Commercial Buildings' system fee lines; for alterations/additions/modifications to existing commercial buildings (including tenant improvements), the Unit Fee Schedule applies instead (per-fixture/per-outlet/per-unit line items in Articles 4-6) rather than this flat percentage
5% of the building permit fee (each of electrical, mechanical, and plumbing)
Additional Plan Review (changes/revisions after initial review), minimum 1/2 hourCity of Coolidge Building Permit Fee Schedule, Article 3, Other Inspections and Fees item 4
$47.00 per hour (or actual hourly cost to the jurisdiction, whichever is greater)
Re-inspection FeeCity of Coolidge Building Permit Fee Schedule, Article 3, Other Inspections and Fees item 2
$47.00

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Coolidge?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Required before concrete placement, per the 2018 IBC administrative inspection provisions as adopted by the City of Coolidge

  2. 2

    Framing / Weather-Tight

    Building must be weather-tight at the time of the frame inspection per the City of Coolidge's amendment to IBC §110.304 (Ordinance No. 23-13, Exhibit A) -- the same administrative provision used for residential construction, since Coolidge's adopted IRC deletes its own administrative chapter in favor of the IBC's

  3. 3

    Final / Certificate of Occupancy

    All work complete per approved plans and City of Coolidge Commercial Plan Submittal requirements before Certificate of Occupancy issuance; building address numbers (4-inch minimum, durable material) must be displayed prior to final inspection/CO issuance

See the full Coolidge inspection guide — scheduling & re-inspection fees →

Tips

  • Tenant improvements are NOT a separate permit type in Coolidge -- the same Commercial Permit Application and Commercial Plan Submittal process used for new commercial construction also covers additions, remodels, and interior tenant buildouts. No dedicated TI application form or TI-specific fee line was found published by the City.
  • Fire protection systems (sprinkler, alarm, suppression, commercial hood/Ansul) are submitted as separate Fire permits directly to Development Services -- do not assume they are covered under the general commercial building permit submittal.
  • Commercial (IBC) design wind speed is 115 mph (Exposure C), higher than the 90 mph figure used for residential (IRC) construction in the same Ordinance No. 23-13 -- this is a real code-basis difference (IBC/ASCE 7 ultimate design wind speed vs. the IRC's own table), not an inconsistency in this file.
  • As of July 2026, the City of Coolidge does not appear to publish a permit-specific plan review turnaround time for commercial building permits. There is no verifiable Coolidge-specific online source for this figure -- call the Development Services Department at 520-723-6075.

Frequently asked questions

Yes. Per the City's Commercial Plan Submittal guidance, fire sprinkler, alarm, suppression, and commercial hood/Ansul systems are submitted as separate Fire permit submittals directly to the Development Services Office, distinct from the general commercial building permit.

In Coolidge, the published Building Permit Fee -- Based on Valuation (Article 3 table) is: Same valuation-based fee table as the Residential Building Permit (see that permit type's fee table for the full breakpoint schedule), but the underlying construction valuation is computed from Table II (Building Valuation Data) using the applicable IBC occupancy group (Groups A-1 through U) and construction type (Types IA-VB), rather than the residential R-3/R-4 rows. Additional published fees: Plan Review Fee — 65% of the calculated Building Permit Fee; New Commercial Building Electrical/Mechanical/Plumbing System Fee — 5% of the building permit fee (each of electrical, mechanical, and plumbing); Additional Plan Review (changes/revisions after initial review), minimum 1/2 hour — $47.00 per hour (or actual hourly cost to the jurisdiction, whichever is greater); Re-inspection Fee — $47.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Coolidge does not publish a plan-review timeline for this permit. Contact City of Coolidge Development Services Department — Building Safety Division at 520-723-6075 for current turnaround.

You'll need: Commercial Permit Application; Sealed Commercial Construction Plan Set. Depending on your project, Coolidge may also ask for: City of Coolidge Special Inspection Form; Asbestos Survey. See the required-documents checklist on this page for details on each.

Coolidge requires 3 inspection(s) for a commercial building permit, in order: Foundation/Footing, Framing / Weather-Tight, Final / Certificate of Occupancy. Schedule each through City of Coolidge Development Services Department — Building Safety Division (520-723-6075).

Apply through City of Coolidge Development Services Department — Building Safety Division at 131 W. Pinkley Avenue, Coolidge, AZ 85128. Phone: 520-723-6075, email: inspection@coolidgeaz.com. Office hours: Monday - Friday, 8 a.m. - 5 p.m. Inspection requests are handled via a separate Inspection Line (520-723-6049); inspections take place the next business day if the Inspection Request Form is received by 3:30 p.m. the prior business day (no inspections on holidays/weekends). Building Official: Bill Jones (wjones@coolidgeaz.com). FAX 520-723-6079, TDD 520-723-4653.. Official information: https://www.coolidgeaz.com/development-services.

No. The City of Coolidge's Commercial Plan Submittal guidance and Commercial Permit Application process treat new construction, remodeling, and improvements to commercial buildings as a single undifferentiated process -- no separate tenant-improvement permit type, application, or fee schedule was found on the City's website.

115 mph wind speed (Exposure C) and Seismic Zone B, per the City of Coolidge Commercial Plan Submittal guidance -- higher than the 90 mph wind speed used for residential (IRC) construction under the same Ordinance No. 23-13, reflecting the different wind-speed basis between the IBC and IRC design tables.

Sources & verification

Verified against official sources. Last reviewed 2026-07-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coolidge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter