Fence, Wall, and Retaining Wall Permit in City of Maricopa, Arizona

Fences and walls in Maricopa are regulated under a two-track system: a Zoning Permit for fences/walls under 7 feet (verifying location and design), and a full Commercial Wall/Fence Permit or Commercial Retaining Wall Permit for taller structures and retaining walls over 4 feet. Governed by the City's Fence and Wall Guide (Rev. 10/2024).

Verified 2026-07-06 · Source

When you need this permit

  • All fences/walls under 7 feet in height require a Zoning Permit (not a building permit) to verify location and exterior design
  • Retaining wall footings 4 feet or less (unless supporting a surcharge) do not require a building permit
  • Building permits ARE required for retaining walls over 4 feet, commercial fences/freestanding walls exceeding 7 feet, fences designed by a Registered Design Professional, or walls on a slope greater than 10%
  • Residential height limits: max 3.5 ft in front/street-side yards, max 6 ft on interior side/rear yards; commercial/mixed-use/industrial max 8 ft in side/rear yards, with chain-link prohibited in those zoning districts
  • Barbed wire, razor wire, embedded glass shards, ultra-barrier, and electrified fencing are prohibited
  • Narrative, written property owner authorization, and a site plan are required for submittal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Administrative Reviews/Zoning/Waiver PermitCity of Maricopa Development Services Fee Schedule, Planning and Zoning Fees — Miscellaneous, effective 10/02/2025 (applies to the Zoning Permit required for fences/walls under 7 feet)
$125
Zoning Permit review (per City FAQ, home occupation cross-reference)City of Maricopa Frequently Asked Questions page — general zoning permit review fee basis; average review is 1-2 hours
$112 per hour review fee
Residential Permit Issuance Fee (if a building permit applies)City of Maricopa Development Services Fee Schedule, Building Safety Fees — Permits, effective 10/02/2025
$50

Review timeline

Plan reviewCity of Maricopa’s published plan-review target
26–30 business days

How long did your Fence, Wall, and Retaining Wall Permit permit actually take in City of Maricopa?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing

    Required for engineered retaining walls before backfill

  2. 2

    Final

    Completed fence/wall verified against approved plans

See the full City of Maricopa inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City's Plan Review Turnaround Times document, 'Zoning Permit' (Planning & Zoning review times section) averages 8 working days first review / 4 subsequent, 10-day administrative completeness, 16-day substantive review, for a 26-working-day overall review time (2 review cycles). A Commercial Wall/Fence permit requiring a full building permit instead falls under the 'Miscellaneous' Building Safety category at 30 working days overall.
  • Even fences under 7 feet that don't need a building permit still require a Zoning Permit — the two review tracks are not interchangeable.
  • Retaining wall height for a combined fence-on-wall structure is measured from the ground level on the lowest side; if the freestanding portion is set back a distance equal to or greater than its own height, the two portions are measured/calculated separately.

Frequently asked questions

Pergolas under 200 square feet with no electrical or plumbing do not require a permit. Pergolas over 200 square feet require a permit regardless of utilities, and any pergola with electrical or plumbing requires a permit regardless of size, per the City of Maricopa Frequently Asked Questions page.

In City of Maricopa, the published Administrative Reviews/Zoning/Waiver Permit is: $125. Additional published fees: Zoning Permit review (per City FAQ, home occupation cross-reference) — $112 per hour review fee; Residential Permit Issuance Fee (if a building permit applies) — $50. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

City of Maricopa's published plan-review target for a fence, wall, and retaining wall permit is 26–30 business days.

You'll need: Zoning Permit Application (VIP Portal, under 'Planning and Zoning'); Narrative; Written Authorization from Property Owner; Site Plan. Depending on your project, City of Maricopa may also ask for: Commercial Wall/Fence Permit Application (VIP Portal, under 'Building Permits — Commercial Projects'). See the required-documents checklist on this page for details on each.

City of Maricopa requires 2 inspection(s) for a fence, wall, and retaining wall permit, in order: Footing, Final. Schedule each through City of Maricopa Development Services Department (Permit Center) ((520) 316-6920).

Apply through City of Maricopa Development Services Department (Permit Center) at 39700 W Civic Center Plaza, Maricopa, AZ 85138. Phone: (520) 316-6920, email: dsd@maricopa-az.gov. Office hours: Monday through Thursday, 7:00 a.m. to 6:00 p.m. (CLOSED Fridays) — the City of Maricopa operates on a four-day work week. The City has moved to an all-digital application and plan review platform; paper plan submittals are no longer accepted. All permit applications, plan submittals, fee payments, and inspection requests are handled via the VIP Portal (ci-maricopa-az.smartgovcommunity.com), a SmartGov Community platform. Source: City of Maricopa Permit Center page and Plan Review Turnaround Times document (Rev 5/2026).. Official information: https://www.maricopa-az.gov/Departments/Development-Services/Permit-Center.

City of Maricopa, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Maricopa independently adopts and administers its own construction codes through its Development Services Department; it does not defer to Pinal County for permitting within incorporated city limits. Source: Maricopa City Code (MCC) Chapter 15, Building Regulation, Ordinance 26-01.; On January 20, 2026, the City of Maricopa City Council approved adoption of the 2024 International Codes (IBC, IRC, IPMC, IMC, IPC, IFGC, IECC, IFC, International Swimming Pool and Spa Code) plus the 2023 NEC and ICC A117.1-2017 Accessible and Usable Buildings and Facilities Code, codified as Ordinance 26-01 and effective February 20, 2026. Source: City of Maricopa Public Notice — City of Maricopa Building Codes Implementation; Maricopa City Code Chapter 15.05, as codified March 2026.; 2024 International Building Code (IBC), published by the International Code Council, together with appendages, adopted as the building code of the City of Maricopa (MCC 15.05.040), with City amendments. Source: Maricopa City Code 15.05.040, Ordinance 26-01 § 2.; 2024 International Residential Code (IRC), published by the International Code Council, together with appendices (excluding B, BB, NB, NG, NH, and N2), adopted as the residential building code of the City of Maricopa (MCC 15.05.050), with City amendments. Source: Maricopa City Code 15.05.050, Ordinance 26-01 § 2.; 2024 International Property Maintenance Code (IPMC), adopted as the property maintenance code of the City of Maricopa (MCC 15.05.060), with City amendments. Source: Maricopa City Code 15.05.060, Ordinance 26-01 § 2.; 2024 International Mechanical Code (IMC), adopted as the mechanical code of the City of Maricopa (MCC 15.05.070), with City amendments. Source: Maricopa City Code 15.05.070, Ordinance 26-01 § 2.; 2024 International Plumbing Code (IPC), adopted as the plumbing code of the City of Maricopa (MCC 15.05.080), with City amendments. Source: Maricopa City Code 15.05.080, Ordinance 26-01 § 2.; 2024 International Fuel Gas Code (IFGC), adopted as the fuel gas code of the City of Maricopa (MCC 15.05.090), with City amendments. Source: Maricopa City Code 15.05.090, Ordinance 26-01 § 2.; National Electrical Code (NEC), 2023 Edition, published by the National Fire Protection Association, adopted as the electrical code of the City of Maricopa (MCC 15.05.100), with City amendments (electrical code cycle is one edition behind the 2024 ICC set, as is standard practice statewide). Source: Maricopa City Code 15.05.100, Ordinance 26-01 § 2.; 2024 International Energy Conservation Code (IECC), adopted as the energy code of the City of Maricopa (MCC 15.05.110). Source: Maricopa City Code 15.05.110, Ordinance 26-01 § 2.; 2024 International Fire Code (IFC), adopted as the fire code of the City of Maricopa (MCC 15.05.120) with Appendices B, C, D, E, F, G, H, I, J, K, L, M, N, and O adopted and extensive City amendments (sprinkler/alarm thresholds, fire department connection sizing, hazardous materials permitting); administered by the City of Maricopa Fire/Medical Department. Source: Maricopa City Code 15.05.120, Ordinance 26-01 § 2.; International Swimming Pool and Spa Code, adopted by the City of Maricopa (MCC 15.05.130). Source: Maricopa City Code 15.05.130, Ordinance 26-01 § 2 (chapter section list).; ICC A117.1-2017 Accessible and Usable Buildings and Facilities Code, adopted by the City of Maricopa (MCC 15.05.140) as its accessibility standard (the IBC's own referenced-standard section was amended to point to A117.1-2017 rather than an earlier edition). Source: Maricopa City Code 15.05.040(B) and 15.05.140, Ordinance 26-01 § 2.; International Wildland-Urban Interface Code, adopted by the City of Maricopa (MCC 15.05.150). Source: Maricopa City Code 15.05.150, Ordinance 26-01 § 2 (chapter section list).; Building permit and plan review fees are NOT set by the ICC codes' own fee tables — every adopted code's fee schedule section (IBC 109.2, IRC R108.2, IMC 108.2, IPC 106.6.2, IFGC 108.2) is explicitly amended to read: 'Building permit fees shall be assessed in accordance with the City of Maricopa Development Services Fee Schedule as approved by City Council.' The Development Services Fee Schedule (effective 10/02/2025) is the sole authoritative fee source. Source: Maricopa City Code 15.05.040(B), .050(B), .070(B), .080(B), .090(B); City of Maricopa Development Services Fee Schedule, Rev. 10/2025.; Manufactured homes, mobile homes, and factory-built buildings are separately addressed under the City's Manufactured Homes and Recreational Vehicles Process Guide; construction/installation standards for these units are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing), with the City handling on-site placement, foundation/tie-down, and zoning compliance. Source: City of Maricopa Handouts, Checklists & Guidelines page — Manufactured Homes and Recreational Vehicles Process Guide.. Local amendments apply — see the City of Maricopa overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Maricopa building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.