Commercial Building Permit (New Construction) in City of Maricopa, Arizona

Required for new commercial buildings/shell buildings, commercial additions, and commercial remodels in the City of Maricopa, reviewed against the 2024 IBC and City of Maricopa amendments (effective February 20, 2026 under Ordinance 26-01). Governed by the City's New Commercial Building Permit Process Guide (Rev. 09/2024) and applied for via the VIP Portal's 'Commercial New Permit' path. Tenant improvement work to an existing commercial space is treated as a distinct permit type in Maricopa — see the separate Commercial Tenant Improvement Permit entry — because the City publishes an independently revised, TI-specific application guide with its own submittal checklist, prices TI work under a distinct 'Major TI'/'Minor TI' percentage-of-valuation fee tier rather than this permit's standard valuation-scale Building Permit Fee, and the City's own Plan Review Turnaround Times chart tracks 'Commercial New' and 'Commercial Tenant' as two separately named line items.

Verified 2026-08-01 · Source

When you need this permit

  • Building permit required for new commercial buildings/shell buildings, commercial additions, and commercial remodels (verify existing occupancy) within Maricopa city limits, per the City's New Commercial Building Permit Process Guide (Rev. 09/2024)
  • Prior to site plan submittal, approval by Planning and Zoning is required through either a Development Review Permit or a Zoning Permit — the application will not be routed for review without this prerequisite approval
  • Construction plans (architectural, structural, mechanical, plumbing, electrical) must be sealed by the applicable Arizona-registered design professional; the City requires a separate building permit — and a separate plan set — for each individual building/structure
  • New commercial valuation fees are based on occupancy and construction type (structure), calculated using the current ICC Building Valuation Data table, per the Development Services Fee Schedule
  • All food service facilities require separate approval by Pinal County Division of Environmental Health, in addition to the City building permit
  • Fire sprinkler and fire alarm work requires separate permits/approvals through the City's Fire Prevention review track
  • Only PDF file submissions are accepted through the VIP Portal, using the City's required file-naming convention: (Plan Type) – (Project Name) – (Submittal #)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 8 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationCity of Maricopa Development Services Fee Schedule, Building Permit Fee Schedule table, effective 10/02/2025. Per the Fee Schedule's Building Safety Fees page note, new commercial valuation itself is first computed from the current ICC Building Valuation Data table by occupancy and construction type, then run through this same fee scale (the identical table used for residential permits in this file).
$56 ($1-$500); $56 + $4 per additional $100 to $2,000; $107 + $16 per additional $1,000 to $25,000; $465 + $12 per additional $1,000 to $50,000; $745 + $8 per additional $1,000 to $100,000; $1,134 + $7 per additional $1,000 to $500,000; $3,623 + $6 per additional $1,000 to $1,000,000; $6,261 + $5 per additional $1,000 above $1,000,000
Commercial Permit Issuance FeeCity of Maricopa Development Services Fee Schedule, Building Safety Fees — Permits, effective 10/02/2025 — distinct from the flat $50 Residential Permit Issuance Fee used elsewhere in this file
5% of total project valuation, capped at $2,500
General Plan ReviewCity of Maricopa Development Services Fee Schedule, Building Safety Fees — Plan Review, effective 10/02/2025
66% of Permit Fee
Expedited Commercial Building Plan Review Fee (based upon staff capabilities)City of Maricopa Development Services Fee Schedule, Building Safety Fees — Plan Review, effective 10/02/2025
1/2 of original general plan review permit fee, plus the general plan review fee
Development Review Permit: Non-Residential (Planning & Zoning prerequisite)City of Maricopa Development Services Fee Schedule, Planning and Zoning Fees — Land Use/Zoning, effective 10/02/2025; one of two possible prerequisite approvals (Development Review Permit or Zoning Permit) required before a commercial site plan will be routed for building-permit review
$1,000 + $50 per acre
Administrative Reviews/Zoning/Waiver Permit (Zoning Permit prerequisite alternative)City of Maricopa Development Services Fee Schedule, Planning and Zoning Fees — Miscellaneous, effective 10/02/2025
$125
Temporary/Partial Certificate of OccupancyCity of Maricopa Development Services Fee Schedule, Building Safety Fees — Plan Review, effective 10/02/2025
$334
Commercial Inspection Outside Normal Business HoursCity of Maricopa Development Services Fee Schedule, Building Safety Fees — Inspection Fees, effective 10/02/2025
$170 per hour, 2-hour minimum (Monday through Friday, based upon staff availability)

Review timeline

Plan reviewCity of Maricopa’s published plan-review target
30–30 business days

How long did your Commercial Building Permit (New Construction) permit actually take in City of Maricopa?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Rough-In (Structural / MEP)

    Framing, structural connections, and mechanical/electrical/plumbing rough-in verified before concealment, per 2024 IBC and City of Maricopa amendments

  3. 3

    Final / Certificate of Occupancy

    All work complete per approved plans; Certificate of Occupancy issued

See the full City of Maricopa inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City of Maricopa Plan Review Turnaround Times document (Rev 5/2026), 'Commercial New' averages 12 working days first review / 8 subsequent, with 10-day administrative completeness review and 20-day substantive review, for an overall review time of 30 working days (2 review cycles) — the same 30-day overall total as the separate 'Commercial Tenant' line, but with a slower first/subsequent review-day breakdown reflecting the larger scope of new construction.
  • A Development Review Permit or Zoning Permit (Planning and Zoning approval) is a mandatory prerequisite before the site plan will be routed for building-safety review — budget for this separate approval and fee ($1,000 + $50/acre for non-residential Development Review Permit, or $125 for a Zoning Permit) and its own review timeline before the building permit clock starts.
  • The City requires a separate building permit application and plan set for each individual building/structure on a multi-building commercial site.
  • An Expedited Commercial Building Plan Review option exists (subject to staff capability) at 1.5x the standard general plan review fee.
  • A 2.75% convenience fee applies to payments made through the online VIP Portal, per the Development Services Fee Schedule cover page.

Frequently asked questions

City of Maricopa requires a commercial building permit (new construction) for: Building permit required for new commercial buildings/shell buildings, commercial additions, and commercial remodels (verify existing occupancy) within Maricopa city limits, per the City's New Commercial Building Permit Process Guide (Rev. 09/2024); Prior to site plan submittal, approval by Planning and Zoning is required through either a Development Review Permit or a Zoning Permit — the application will not be routed for review without this prerequisite approval; Construction plans (architectural, structural, mechanical, plumbing, electrical) must be sealed by the applicable Arizona-registered design professional; the City requires a separate building permit — and a separate plan set — for each individual building/structure; New commercial valuation fees are based on occupancy and construction type (structure), calculated using the current ICC Building Valuation Data table, per the Development Services Fee Schedule; All food service facilities require separate approval by Pinal County Division of Environmental Health, in addition to the City building permit; Fire sprinkler and fire alarm work requires separate permits/approvals through the City's Fire Prevention review track; Only PDF file submissions are accepted through the VIP Portal, using the City's required file-naming convention: (Plan Type) – (Project Name) – (Submittal #). If your project isn't listed, confirm with City of Maricopa Development Services Department (Permit Center) at (520) 316-6920 before starting work.

In City of Maricopa, the published Building Permit Fee — Based on Valuation is: $56 ($1-$500); $56 + $4 per additional $100 to $2,000; $107 + $16 per additional $1,000 to $25,000; $465 + $12 per additional $1,000 to $50,000; $745 + $8 per additional $1,000 to $100,000; $1,134 + $7 per additional $1,000 to $500,000; $3,623 + $6 per additional $1,000 to $1,000,000; $6,261 + $5 per additional $1,000 above $1,000,000. Additional published fees: Commercial Permit Issuance Fee — 5% of total project valuation, capped at $2,500; General Plan Review — 66% of Permit Fee; Expedited Commercial Building Plan Review Fee (based upon staff capabilities) — 1/2 of original general plan review permit fee, plus the general plan review fee; Development Review Permit: Non-Residential (Planning & Zoning prerequisite) — $1,000 + $50 per acre; Administrative Reviews/Zoning/Waiver Permit (Zoning Permit prerequisite alternative) — $125; Temporary/Partial Certificate of Occupancy — $334; Commercial Inspection Outside Normal Business Hours — $170 per hour, 2-hour minimum (Monday through Friday, based upon staff availability). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the City of Maricopa Plan Review Turnaround Times document (Rev 5/2026), 'Commercial New' averages 12 working days for first review (8 for subsequent reviews), plus a 10-working-day administrative completeness review and a 20-working-day substantive review, for an overall review time of about 30 working days based on 2 review cycles. The City operates a 4-day work week, so working days run slower in calendar time than a standard 5-day week.

You'll need: Building Permit Application (VIP Portal, 'Commercial New Permit'); Project Narrative; Site Plan; Construction Plans; Soils Report; Building Color Elevations; Utility Will Serve Letters; Pre-Incident Fire Plan. See the required-documents checklist on this page for details on each.

City of Maricopa requires 3 inspection(s) for a commercial building permit (new construction), in order: Foundation/Footing, Rough-In (Structural / MEP), Final / Certificate of Occupancy. Schedule each through City of Maricopa Development Services Department (Permit Center) ((520) 316-6920).

Apply through City of Maricopa Development Services Department (Permit Center) at 39700 W Civic Center Plaza, Maricopa, AZ 85138. Phone: (520) 316-6920, email: dsd@maricopa-az.gov. Office hours: Monday through Thursday, 7:00 a.m. to 6:00 p.m. (CLOSED Fridays) — the City of Maricopa operates on a four-day work week. The City has moved to an all-digital application and plan review platform; paper plan submittals are no longer accepted. All permit applications, plan submittals, fee payments, and inspection requests are handled via the VIP Portal (ci-maricopa-az.smartgovcommunity.com), a SmartGov Community platform. Source: City of Maricopa Permit Center page and Plan Review Turnaround Times document (Rev 5/2026).. Official information: https://www.maricopa-az.gov/Departments/Development-Services/Permit-Center.

City of Maricopa, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Maricopa independently adopts and administers its own construction codes through its Development Services Department; it does not defer to Pinal County for permitting within incorporated city limits. Source: Maricopa City Code (MCC) Chapter 15, Building Regulation, Ordinance 26-01.; On January 20, 2026, the City of Maricopa City Council approved adoption of the 2024 International Codes (IBC, IRC, IPMC, IMC, IPC, IFGC, IECC, IFC, International Swimming Pool and Spa Code) plus the 2023 NEC and ICC A117.1-2017 Accessible and Usable Buildings and Facilities Code, codified as Ordinance 26-01 and effective February 20, 2026. Source: City of Maricopa Public Notice — City of Maricopa Building Codes Implementation; Maricopa City Code Chapter 15.05, as codified March 2026.; 2024 International Building Code (IBC), published by the International Code Council, together with appendages, adopted as the building code of the City of Maricopa (MCC 15.05.040), with City amendments. Source: Maricopa City Code 15.05.040, Ordinance 26-01 § 2.; 2024 International Residential Code (IRC), published by the International Code Council, together with appendices (excluding B, BB, NB, NG, NH, and N2), adopted as the residential building code of the City of Maricopa (MCC 15.05.050), with City amendments. Source: Maricopa City Code 15.05.050, Ordinance 26-01 § 2.; 2024 International Property Maintenance Code (IPMC), adopted as the property maintenance code of the City of Maricopa (MCC 15.05.060), with City amendments. Source: Maricopa City Code 15.05.060, Ordinance 26-01 § 2.; 2024 International Mechanical Code (IMC), adopted as the mechanical code of the City of Maricopa (MCC 15.05.070), with City amendments. Source: Maricopa City Code 15.05.070, Ordinance 26-01 § 2.; 2024 International Plumbing Code (IPC), adopted as the plumbing code of the City of Maricopa (MCC 15.05.080), with City amendments. Source: Maricopa City Code 15.05.080, Ordinance 26-01 § 2.; 2024 International Fuel Gas Code (IFGC), adopted as the fuel gas code of the City of Maricopa (MCC 15.05.090), with City amendments. Source: Maricopa City Code 15.05.090, Ordinance 26-01 § 2.; National Electrical Code (NEC), 2023 Edition, published by the National Fire Protection Association, adopted as the electrical code of the City of Maricopa (MCC 15.05.100), with City amendments (electrical code cycle is one edition behind the 2024 ICC set, as is standard practice statewide). Source: Maricopa City Code 15.05.100, Ordinance 26-01 § 2.; 2024 International Energy Conservation Code (IECC), adopted as the energy code of the City of Maricopa (MCC 15.05.110). Source: Maricopa City Code 15.05.110, Ordinance 26-01 § 2.; 2024 International Fire Code (IFC), adopted as the fire code of the City of Maricopa (MCC 15.05.120) with Appendices B, C, D, E, F, G, H, I, J, K, L, M, N, and O adopted and extensive City amendments (sprinkler/alarm thresholds, fire department connection sizing, hazardous materials permitting); administered by the City of Maricopa Fire/Medical Department. Source: Maricopa City Code 15.05.120, Ordinance 26-01 § 2.; International Swimming Pool and Spa Code, adopted by the City of Maricopa (MCC 15.05.130). Source: Maricopa City Code 15.05.130, Ordinance 26-01 § 2 (chapter section list).; ICC A117.1-2017 Accessible and Usable Buildings and Facilities Code, adopted by the City of Maricopa (MCC 15.05.140) as its accessibility standard (the IBC's own referenced-standard section was amended to point to A117.1-2017 rather than an earlier edition). Source: Maricopa City Code 15.05.040(B) and 15.05.140, Ordinance 26-01 § 2.; International Wildland-Urban Interface Code, adopted by the City of Maricopa (MCC 15.05.150). Source: Maricopa City Code 15.05.150, Ordinance 26-01 § 2 (chapter section list).; Building permit and plan review fees are NOT set by the ICC codes' own fee tables — every adopted code's fee schedule section (IBC 109.2, IRC R108.2, IMC 108.2, IPC 106.6.2, IFGC 108.2) is explicitly amended to read: 'Building permit fees shall be assessed in accordance with the City of Maricopa Development Services Fee Schedule as approved by City Council.' The Development Services Fee Schedule (effective 10/02/2025) is the sole authoritative fee source. Source: Maricopa City Code 15.05.040(B), .050(B), .070(B), .080(B), .090(B); City of Maricopa Development Services Fee Schedule, Rev. 10/2025.; Manufactured homes, mobile homes, and factory-built buildings are separately addressed under the City's Manufactured Homes and Recreational Vehicles Process Guide; construction/installation standards for these units are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing), with the City handling on-site placement, foundation/tie-down, and zoning compliance. Source: City of Maricopa Handouts, Checklists & Guidelines page — Manufactured Homes and Recreational Vehicles Process Guide.. Local amendments apply — see the City of Maricopa overview page for the full list.

Yes. Unlike jurisdictions that fold tenant improvement work into the general commercial building permit process, the City of Maricopa publishes a separate Commercial Tenant Improvement Application Guide, prices TI work under a distinct Major TI/Minor TI percentage-of-valuation fee, and tracks 'Commercial Tenant' as its own line on the Plan Review Turnaround Times chart. See the Commercial Tenant Improvement (T.I.) Permit entry.

Sources & verification

Verified against official sources. Last reviewed 2026-08-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Maricopa building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter