Residential Building Permit (New Construction) in City of Maricopa, Arizona

Required for new single-family and two-family dwelling construction in the City of Maricopa. Reviewed against the 2024 IRC and City of Maricopa amendments (effective February 20, 2026 under Ordinance 26-01). Applications are submitted exclusively through the VIP Portal (SmartGov Community); the City no longer accepts paper plan submittals.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for new single-family and two-family dwelling construction within Maricopa city limits
  • Plans must comply with the 2024 IRC and City of Maricopa amendments, including Climatic and Geographic Design Criteria (105 mph wind; Seismic Category B; 32°F winter design temperature; moderate-to-heavy termite potential; 12-inch frost line)
  • Mandatory heating and cooling: every dwelling unit and guest room must maintain 68°F minimum (heating) and no more than 80°F (cooling) at 3 feet above floor (IRC R303.10 as amended)
  • Termite pretreatment of slab fill required for the permitted building's foundation perimeter, applied by an Arizona-licensed pest control applicator
  • Submittal exclusively via the VIP Portal (ci-maricopa-az.smartgovcommunity.com) — all-digital plan review platform, no paper submittals accepted
  • Construction documents prepared by an Arizona-registered design professional per IRC R106.1 as amended

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationCity of Maricopa Development Services Fee Schedule, Building Permit Fee Schedule table (referencing current ICC valuation table), effective 10/02/2025
$56 ($1-$500); $56 + $4 per additional $100 to $2,000; $107 + $16 per additional $1,000 to $25,000; $465 + $12 per additional $1,000 to $50,000; $745 + $8 per additional $1,000 to $100,000; $1,134 + $7 per additional $1,000 to $500,000; $3,623 + $6 per additional $1,000 to $1,000,000; $6,261 + $5 per additional $1,000 above $1,000,000
Residential Permit Issuance FeeCity of Maricopa Development Services Fee Schedule, Building Safety Fees — Permits, effective 10/02/2025
$50
General Plan ReviewCity of Maricopa Development Services Fee Schedule, Building Safety Fees — Plan Review, effective 10/02/2025
66% of Permit Fee
Plot Plan Review (residential standard plans)City of Maricopa Development Services Fee Schedule, Building Safety Fees — Plan Review, effective 10/02/2025
$56
Residential Revisions (changes to approved plans, 3rd+ review)City of Maricopa Development Services Fee Schedule, Building Safety Fees — Plan Review, effective 10/02/2025
$112 per hour, 1/2 hour minimum

Review timeline

Plan reviewCity of Maricopa’s published plan-review target
22–54 business days

How long did your Residential Building Permit (New Construction) permit actually take in City of Maricopa?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, egress, per 2024 IRC and City of Maricopa amendments

  3. 3

    Lath or Gypsum Board Inspection

    After all lath and gypsum board (interior and exterior) is in place, before plastering or taping/finishing of joints and fasteners (IRC R109.1.5 as amended)

  4. 4

    Final

    All work complete per approved plans; required before Certificate of Occupancy

See the full City of Maricopa inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City of Maricopa Plan Review Turnaround Times document (Rev 5/2026, the City's A.R.S. § 9-835 published time-frames document), 'Residential Home (Custom)' averages 12 working days first review / 8 subsequent, with 10-day administrative completeness review, for an overall review time of 24 working days (2 review cycles); 'Residential Home Builder (Standard Plan Review)' averages 12/8 working days review with 44 substantive-review days for an overall time of 54 working days.
  • The City of Maricopa operates a 4-day work week (Monday-Thursday, 7 a.m.-6 p.m., closed Fridays) — 'working days' in the review timeline table are City business days, not calendar days.
  • The Development Services Fee Schedule (effective 10/02/2025) is the sole fee authority — every adopted ICC code's own fee section is explicitly overridden by City ordinance amendment (MCC 15.05.040(B), .050(B), etc.).
  • A 2.75% convenience fee applies to payments made through the online VIP Portal, per the Development Services Fee Schedule cover page.

Frequently asked questions

City of Maricopa requires a residential building permit (new construction) for: Building permit required for new single-family and two-family dwelling construction within Maricopa city limits; Plans must comply with the 2024 IRC and City of Maricopa amendments, including Climatic and Geographic Design Criteria (105 mph wind; Seismic Category B; 32°F winter design temperature; moderate-to-heavy termite potential; 12-inch frost line); Mandatory heating and cooling: every dwelling unit and guest room must maintain 68°F minimum (heating) and no more than 80°F (cooling) at 3 feet above floor (IRC R303.10 as amended); Termite pretreatment of slab fill required for the permitted building's foundation perimeter, applied by an Arizona-licensed pest control applicator; Submittal exclusively via the VIP Portal (ci-maricopa-az.smartgovcommunity.com) — all-digital plan review platform, no paper submittals accepted; Construction documents prepared by an Arizona-registered design professional per IRC R106.1 as amended. If your project isn't listed, confirm with City of Maricopa Development Services Department (Permit Center) at (520) 316-6920 before starting work.

In City of Maricopa, the published Building Permit Fee — Based on Valuation is: $56 ($1-$500); $56 + $4 per additional $100 to $2,000; $107 + $16 per additional $1,000 to $25,000; $465 + $12 per additional $1,000 to $50,000; $745 + $8 per additional $1,000 to $100,000; $1,134 + $7 per additional $1,000 to $500,000; $3,623 + $6 per additional $1,000 to $1,000,000; $6,261 + $5 per additional $1,000 above $1,000,000. Additional published fees: Residential Permit Issuance Fee — $50; General Plan Review — 66% of Permit Fee; Plot Plan Review (residential standard plans) — $56; Residential Revisions (changes to approved plans, 3rd+ review) — $112 per hour, 1/2 hour minimum. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the City of Maricopa Plan Review Turnaround Times document (the City's published A.R.S. § 9-835 time-frames guideline, Rev 5/2026), a custom residential home averages 12 working days for first review (8 for subsequent reviews), plus a 10-working-day administrative completeness review, for an overall review time of about 24 working days (based on 2 review cycles). A standard-plan production home from a home builder averages the same 12/8-day review cycle but a longer 44-day substantive review, totaling about 54 working days overall. The City operates a 4-day work week (Mon-Thu), so 'working days' run slower in calendar time than a standard 5-day week.

You'll need: Building Permit Application (VIP Portal); Site/Plot Plan; Construction Drawings and Structural Calculations; Load Calculations Worksheet. Depending on your project, City of Maricopa may also ask for: Owner Builder Affidavit. See the required-documents checklist on this page for details on each.

City of Maricopa requires 4 inspection(s) for a residential building permit (new construction), in order: Foundation/Footing, Framing, Lath or Gypsum Board Inspection, Final. Schedule each through City of Maricopa Development Services Department (Permit Center) ((520) 316-6920).

Apply through City of Maricopa Development Services Department (Permit Center) at 39700 W Civic Center Plaza, Maricopa, AZ 85138. Phone: (520) 316-6920, email: dsd@maricopa-az.gov. Office hours: Monday through Thursday, 7:00 a.m. to 6:00 p.m. (CLOSED Fridays) — the City of Maricopa operates on a four-day work week. The City has moved to an all-digital application and plan review platform; paper plan submittals are no longer accepted. All permit applications, plan submittals, fee payments, and inspection requests are handled via the VIP Portal (ci-maricopa-az.smartgovcommunity.com), a SmartGov Community platform. Source: City of Maricopa Permit Center page and Plan Review Turnaround Times document (Rev 5/2026).. Official information: https://www.maricopa-az.gov/Departments/Development-Services/Permit-Center.

City of Maricopa, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Maricopa independently adopts and administers its own construction codes through its Development Services Department; it does not defer to Pinal County for permitting within incorporated city limits. Source: Maricopa City Code (MCC) Chapter 15, Building Regulation, Ordinance 26-01.; On January 20, 2026, the City of Maricopa City Council approved adoption of the 2024 International Codes (IBC, IRC, IPMC, IMC, IPC, IFGC, IECC, IFC, International Swimming Pool and Spa Code) plus the 2023 NEC and ICC A117.1-2017 Accessible and Usable Buildings and Facilities Code, codified as Ordinance 26-01 and effective February 20, 2026. Source: City of Maricopa Public Notice — City of Maricopa Building Codes Implementation; Maricopa City Code Chapter 15.05, as codified March 2026.; 2024 International Building Code (IBC), published by the International Code Council, together with appendages, adopted as the building code of the City of Maricopa (MCC 15.05.040), with City amendments. Source: Maricopa City Code 15.05.040, Ordinance 26-01 § 2.; 2024 International Residential Code (IRC), published by the International Code Council, together with appendices (excluding B, BB, NB, NG, NH, and N2), adopted as the residential building code of the City of Maricopa (MCC 15.05.050), with City amendments. Source: Maricopa City Code 15.05.050, Ordinance 26-01 § 2.; 2024 International Property Maintenance Code (IPMC), adopted as the property maintenance code of the City of Maricopa (MCC 15.05.060), with City amendments. Source: Maricopa City Code 15.05.060, Ordinance 26-01 § 2.; 2024 International Mechanical Code (IMC), adopted as the mechanical code of the City of Maricopa (MCC 15.05.070), with City amendments. Source: Maricopa City Code 15.05.070, Ordinance 26-01 § 2.; 2024 International Plumbing Code (IPC), adopted as the plumbing code of the City of Maricopa (MCC 15.05.080), with City amendments. Source: Maricopa City Code 15.05.080, Ordinance 26-01 § 2.; 2024 International Fuel Gas Code (IFGC), adopted as the fuel gas code of the City of Maricopa (MCC 15.05.090), with City amendments. Source: Maricopa City Code 15.05.090, Ordinance 26-01 § 2.; National Electrical Code (NEC), 2023 Edition, published by the National Fire Protection Association, adopted as the electrical code of the City of Maricopa (MCC 15.05.100), with City amendments (electrical code cycle is one edition behind the 2024 ICC set, as is standard practice statewide). Source: Maricopa City Code 15.05.100, Ordinance 26-01 § 2.; 2024 International Energy Conservation Code (IECC), adopted as the energy code of the City of Maricopa (MCC 15.05.110). Source: Maricopa City Code 15.05.110, Ordinance 26-01 § 2.; 2024 International Fire Code (IFC), adopted as the fire code of the City of Maricopa (MCC 15.05.120) with Appendices B, C, D, E, F, G, H, I, J, K, L, M, N, and O adopted and extensive City amendments (sprinkler/alarm thresholds, fire department connection sizing, hazardous materials permitting); administered by the City of Maricopa Fire/Medical Department. Source: Maricopa City Code 15.05.120, Ordinance 26-01 § 2.; International Swimming Pool and Spa Code, adopted by the City of Maricopa (MCC 15.05.130). Source: Maricopa City Code 15.05.130, Ordinance 26-01 § 2 (chapter section list).; ICC A117.1-2017 Accessible and Usable Buildings and Facilities Code, adopted by the City of Maricopa (MCC 15.05.140) as its accessibility standard (the IBC's own referenced-standard section was amended to point to A117.1-2017 rather than an earlier edition). Source: Maricopa City Code 15.05.040(B) and 15.05.140, Ordinance 26-01 § 2.; International Wildland-Urban Interface Code, adopted by the City of Maricopa (MCC 15.05.150). Source: Maricopa City Code 15.05.150, Ordinance 26-01 § 2 (chapter section list).; Building permit and plan review fees are NOT set by the ICC codes' own fee tables — every adopted code's fee schedule section (IBC 109.2, IRC R108.2, IMC 108.2, IPC 106.6.2, IFGC 108.2) is explicitly amended to read: 'Building permit fees shall be assessed in accordance with the City of Maricopa Development Services Fee Schedule as approved by City Council.' The Development Services Fee Schedule (effective 10/02/2025) is the sole authoritative fee source. Source: Maricopa City Code 15.05.040(B), .050(B), .070(B), .080(B), .090(B); City of Maricopa Development Services Fee Schedule, Rev. 10/2025.; Manufactured homes, mobile homes, and factory-built buildings are separately addressed under the City's Manufactured Homes and Recreational Vehicles Process Guide; construction/installation standards for these units are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing), with the City handling on-site placement, foundation/tie-down, and zoning compliance. Source: City of Maricopa Handouts, Checklists & Guidelines page — Manufactured Homes and Recreational Vehicles Process Guide.. Local amendments apply — see the City of Maricopa overview page for the full list.

The 2024 IRC (and 2024 IBC for any non-residential portions), as adopted and amended by the City of Maricopa under Ordinance 26-01, effective February 20, 2026. Electrical work follows the 2023 NEC.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Maricopa building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.