Jerome building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Jerome, Arizona.
Verified 2026-07-07 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 600 Clark Street, P.O. Box 335, Jerome, AZ 86331
- Phone
- 928-634-7943
- Office hours
- Town Hall: Monday - Thursday, 8:00 a.m. to 5:00 p.m. Building Inspector: Barry Wolstencroft (b.wolstencroft@jerome.az.gov, 928-634-7943, fax 928-634-0715). Building permit applications are filed at Town Hall (PO Box 335 / 600 Clark St.) only AFTER the project has received required approval from the Design Review Board and/or Zoning Administrator; inspections are scheduled approximately one week in advance and the Town states it is not liable for work delays due to inspection scheduling.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour
- 2
Framing
Structural framing per approved plans and 2012 IRC
- 3
Progress Inspection (6-month minimum)
An inspection showing construction progress must occur at least every six months or the permit becomes invalid; inspections are scheduled approximately one week in advance
- 4
Final
All work complete per approved plans
Applies to: Residential Addition / Remodel / Accessory Structure Permit
- 1
Foundation/Footing
Required before concrete pour for additions and accessory structures with foundations
- 2
Framing
Structural connections to existing structure
- 3
Final
Completed work verified against approved plans
Applies to: Electric Vehicle (EV) Charger / EVSE Permit
- 1
Rough-In
Wiring and circuit connections before concealment, if applicable
- 2
Final
Charger mounted, circuit labeled, and installation verified per the adopted 2011 NEC
Applies to: Electrical Permit
- 1
Rough-In
Wiring and panel connections before walls are closed
- 2
Final
Devices installed and panel labeled per 2011 NEC
Applies to: Plumbing Permit
- 1
Rough-In
After pipes installed, before walls closed
- 2
Final
Fixtures connected, no leaks, per 2012 IPC
Applies to: Solar Photovoltaic (PV) Permit
- 1
Framing/Structural (Racking Attachment)
Roof or ground-mount racking attachment and structural connections verified against the approved plan set
- 2
Final Electrical/Interconnection
Electrical interconnection verified per the Town's adopted NEC edition; performed by the Town's own Building Inspector
Final inspection only: Demolition Permit, Re-Roofing Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jerome building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Jerome building permits
Get alerts for Jerome
We'll email you when Jerome's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.