Re-Roofing Permit in Jerome, Arizona

Required for re-roofing in the Town of Jerome, billed at a specific flat fee per the Official Fee Schedule. Because a roof is a visible exterior element, most re-roofs also require either full Design Review Board review (new material/color not covered by the limited exemption) or the lighter Zoning Administrator review track.

Verified 2026-07-07 · Source

When you need this permit

  • Building permit required for re-roofing at a specific flat fee ($50.00) per the Official Fee Schedule
  • Design Review track depends on scope: changes in roof MATERIAL or COLOR with limited reflectivity qualify for the lighter Zoning Administrator review track (Section 304.C.1) rather than a full Design Review Board hearing; 'paint, stain, and similar coatings' are otherwise listed as requiring full Board review (Section 304.B.7) and roofs are reviewed under the same general new-construction/alteration criteria (Section 304.H.2.b: 'Original roof shape, design, and material shall be preserved and retained where feasible')
  • Like-for-like repair/replacement using the same materials is exempt from Design Review (Section 304.D), but is NOT exempt from the building permit itself under the Building Department's own fee schedule, which lists Re-Roof as a specific itemized $50 fee with no stated exemption threshold

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Re-RoofTown of Jerome Official Fee Schedule, Schedule A-1, Specific Fees
$50.00
Design Review Board Fee — Paint Colors/Roofing of Same MaterialTown of Jerome Official Fee Schedule, Design Review Board section — applies when roofing with the SAME material; a material change would instead fall under the Large Alterations or New Construction Design Review fee categories depending on scope
$25

Review timeline

Plan review
Not published — contact the department

How long did your Re-Roofing Permit permit actually take in Jerome?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Roof Inspection

    Verifies sheathing, material, and installation per submitted roof plan and 2012 IRC/IBC roofing provisions

See the full Jerome inspection guide — scheduling & re-inspection fees →

Tips

  • Re-roofing with the SAME material only costs an extra $25 Design Review fee (the 'Paint Colors/Roofing of Same Material' line) — but changing to a different roofing material or color likely bumps the project into the pricier 'Large Alterations' or 'New Construction' Design Review fee tiers, and may require full Design Review Board (not just Zoning Administrator) review depending on reflectivity and scope. Confirm classification with the Zoning Administrator before assuming the $25 rate applies.
  • Jerome's own Fee Schedule lists 'Re-Roof' as a distinct $50 flat Building Department fee with no stated small-job or like-for-like exemption — unlike some nearby AZ towns' broader 100 sq ft repair exemptions, Jerome's published fee table does not carve out an exempt tier for minor roof repairs.

Frequently asked questions

Yes — Re-Roof is a specifically itemized $50.00 Building Department fee with no stated exemption threshold in the Town's Official Fee Schedule. If you are changing roofing material or color, you will also likely need Design Review clearance (either the lighter Zoning Administrator track for limited-reflectivity material/color changes, or full Design Review Board review otherwise) before the building permit can be issued, because the entire town lies within the Historic Overlay District.

In Jerome, the published Re-Roof is: $50.00. Additional published fees: Design Review Board Fee — Paint Colors/Roofing of Same Material — $25. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Jerome does not publish a plan-review timeline for this permit. Contact Town of Jerome Building Department (Planning & Zoning Dept.) — Building Inspector at 928-634-7943 for current turnaround.

You'll need: Building Permit Application (Re-Roofing); Roof Plan / Material Listing. See the required-documents checklist on this page for details on each.

Jerome requires 1 inspection(s) for a re-roofing permit, in order: Roof Inspection. Schedule each through Town of Jerome Building Department (Planning & Zoning Dept.) — Building Inspector (928-634-7943).

Apply through Town of Jerome Building Department (Planning & Zoning Dept.) — Building Inspector at 600 Clark Street, P.O. Box 335, Jerome, AZ 86331. Phone: 928-634-7943, email: b.wolstencroft@jerome.az.gov. Office hours: Town Hall: Monday - Thursday, 8:00 a.m. to 5:00 p.m. Building Inspector: Barry Wolstencroft (b.wolstencroft@jerome.az.gov, 928-634-7943, fax 928-634-0715). Building permit applications are filed at Town Hall (PO Box 335 / 600 Clark St.) only AFTER the project has received required approval from the Design Review Board and/or Zoning Administrator; inspections are scheduled approximately one week in advance and the Town states it is not liable for work delays due to inspection scheduling.. Official information: https://jerome.az.gov/building-inspection.

Jerome, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). Despite its very small size (population approximately 450), the Town of Jerome runs its own genuinely independent Building Department with a named Building Inspector (Barry Wolstencroft), its own adopted code chapter (Town Code Chapter 7, Building and Safety Codes), and its own Council-adopted fee schedule (Schedule A-1) — it does NOT defer building-permit administration to Yavapai County. Source: Town of Jerome Building Inspection page (jerome.az.gov/building-inspection) and Building Codes page (jerome.az.gov/building-codes).; 2012 International Building Code (IBC), adopted by Resolution 544. Source: Town of Jerome Building Codes page (jerome.az.gov/building-codes).; 2012 International Residential Code for One- and Two-Family Dwellings (IRC), adopted by Resolution 545. Source: Town of Jerome Building Codes page.; 2012 International Plumbing Code (IPC), including Appendices B, C, D, and E, adopted by Resolution 547. Source: Town of Jerome Building Codes page.; 2011 National Electrical Code (NEC), adopted by Resolution 548 — notably TWO editions behind the electrical-code cycle used by most other AZ jurisdictions reviewed in this dataset (which have generally moved to the 2023 NEC); confirmed as currently listed on the Town's own Building Codes page, not assumed. Source: Town of Jerome Building Codes page.; 2012 International Mechanical Code (IMC), adopted by Resolution 546. Source: Town of Jerome Building Codes page.; 2012 International Fuel Gas Code (IFGC), including Appendices A, B, C, and D, adopted by Resolution 549. Source: Town of Jerome Building Codes page.; 2012 International Property Maintenance Code (IPMC), adopted by Resolution 550 and Ordinance 430. Source: Town of Jerome Building Codes page.; Appendix 33 of the 1997 Uniform Building Code (UBC), serving as the Town's Grading Ordinance, adopted by Ordinance 358. Source: Town of Jerome Building Codes page.; Town of Jerome Administrative Code (2003 Edition), adopted by Ordinance 358 — governs local permit administration provisions layered on top of the ICC codes (e.g., the Section 108.8 reinspection-fee citation used in the Town's own Fee Schedule). Source: Town of Jerome Building Codes page.; 2018 International Fire Code (IFC), adopted by Resolution 635 — notably a much newer edition than the 2012-vintage building/residential/plumbing/mechanical/fuel-gas code set, and the only code in Jerome's adopted set current within the last decade. Source: Town of Jerome Building Codes page.; IMPORTANT — Historic Overlay District (Jerome Zoning Ordinance Section 511.C): the Historic Overlay District boundary 'shall include all areas within the corporate limits of the Town of Jerome' — i.e., the ENTIRE town is inside the Historic Overlay District, not just a subset of downtown parcels. As a result, Design Review Board (or, for minor listed items, Zoning Administrator) approval under Zoning Ordinance Section 304 is a mandatory prerequisite BEFORE a building permit application can even be submitted to the Building Inspector, for nearly every exterior construction project Town-wide. Source: Jerome Zoning Ordinance (current through July 2024), Sections 304 and 511 (jerome.az.gov/documents/76/Zoning_Ordinance_updated_thru_July_2024.pdf); Building Permit Application Packet ('We provide the following information to assist you in applying for a permit once the Design Review Board has approved your project.').. Local amendments apply — see the Jerome overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jerome building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.