Electric Vehicle (EV) Charger / EVSE Permit — Jerome, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://jerome.az.gov/building-inspection
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / EVSE Permit in Jerome, Arizona
Jerome has no dedicated EV charger/EVSE fee line or standalone permit category. EV charger installation is electrical work governed by the 2011 National Electrical Code (NEC) as adopted by the Town (Resolution 548) and billed under the same flat-rate/combination-permit structure used for any other electrical work — the Town's itemized $50.00 'New Electrical Service' fee, or the $50.00-per-trade Combination Permit rate for projects valued up to $3,000. Because the Historic Overlay District covers the Town's entire corporate limits (Zoning Ordinance Section 511.C), an exterior-visible charger installation (e.g., a pedestal or wall unit visible from a public way) as part of a broader exterior modification could separately trigger Design Review Board or Zoning Administrator review under Section 304 — the same layered process that applies to other exterior electrical fixtures — though routine like-for-like electrical work alone does not trigger Design Review.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for EV charger/EVSE circuit installation, governed by the 2011 NEC as adopted by the Town of Jerome (Resolution 548)
- No EV-specific fee line exists; billed as either the itemized New Electrical Service fee or the Combination Permit rate (for a project bundling electrical with plumbing/mechanical work valued up to $3,000), or the general valuation-based Schedule A-1 table for larger installations
- An exterior-visible charger unit (pedestal, wall-mount visible from a public way) installed as part of a broader exterior modification may require Design Review Board or Zoning Administrator approval BEFORE the electrical/building permit is issued, since the entire Town lies within the Historic Overlay District
- Contractor licensing information (ROC license/class) or Owner-Builder exemption required at application Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Wiring and circuit connections before concealment, if applicable
- 2
Final
Charger mounted, circuit labeled, and installation verified per the adopted 2011 NEC
See the full Jerome inspection guide — scheduling & re-inspection fees →
Tips
- Jerome does not price EV chargers separately from other electrical work — expect the flat $50.00 New Electrical Service fee (or the $50.00-per-trade Combination Permit rate) rather than an EV-specific fee.
- Because the Historic Overlay District covers the Town's ENTIRE corporate limits, confirm with the Building Inspector or Zoning Administrator whether an exterior-visible charger unit needs Design Review approval before applying for the electrical permit — this is easy to overlook since it is not a purely electrical-code question.
- Jerome's adopted 2011 NEC is two editions behind the 2023 NEC used by many nearby Yavapai County jurisdictions — confirm with the Building Inspector whether current NEC Article 625 (Electric Vehicle Charging System) provisions are being applied in practice despite the formally older adopted edition.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jerome building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Jerome
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Jerome project checklist
Describe your project once and get every permit, document, and fee it triggers in Jerome — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →