Re-Roofing Permit in Yuma, Arizona

Required for residential and commercial re-roofing in Yuma. Re-roofing is not a separately-ordinanced permit type: it is processed and fee-billed as a standard building permit under the 2024 IBC (§ 150-015, commercial) or 2024 IRC (§ 150-180, residential), valued and charged on the same governing Table 1-A valuation-based fee schedule as new construction — confirmed by a full review of the Yuma City Code Chapter 150 table of contents (American Legal), which contains no separate roofing/re-roofing subchapter or fee table distinct from § 150-016/181.

Verified 2026-07-03 · Source

When you need this permit

  • Building permit required for re-roofing under the 2024 IBC (commercial, § 150-015) or 2024 IRC (residential, § 150-180); no permit-type-specific ordinance exists — re-roofing is valued and permitted under the general building-permit provisions
  • Permit fee is the governing valuation-based Table 1-A schedule (Yuma City Code § 150-016(I) / § 150-181(K)), the same schedule verified for the Residential Building Permit (New Construction) permit type in this file, applied to the re-roof's contract valuation
  • Plan review fee is 65% of the building permit fee where plan review is required (§ 150-181(L))
  • Review timeline is governed by the City's A.R.S. § 9-835 Building Permit Processing Time Frames document (the same governing timeline source verified for other permit types in this file)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee — valuation-based (governing Table 1-A schedule, same as new construction)Yuma City Code § 150-016(I) / § 150-181(K), Table 1-A — the governing fee schedule; no distinct re-roofing fee table exists
$50.00 minimum ($1-$500 valuation), scaling per Table 1-A (e.g., $110.00 for first $2,000 plus $16 per additional $1,000 up to $25,000)
Plan Review FeeYuma City Code § 150-181(L); due at submittal, in addition to the permit fee, where plan review is required
65% of the building permit fee
Other Inspections and FeesYuma City Code § 150-016(I), Table 1-A
$75.00/hour minimum (2-hr minimum after-hours), $150.00/hour weekends/holidays, or total hourly City cost if greater

Review timeline

Plan reviewYuma’s published plan-review target
6–11 business days

How long did your Re-Roofing Permit permit actually take in Yuma?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Roof Inspection

    Roof covering, underlayment, and flashing verified prior to final cover, per 2024 IBC/IRC roofing provisions as adopted

See the full Yuma inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City's Building Permit Processing Time Frames document (A.R.S. § 9-835 compliance document), 'Commercial Building - Roof' and 'Residential Multi Family - Roof' both carry an 11-business-day overall review time (1-day admin + 5-day first review); no distinct line item was published for single-family residential re-roofing specifically, so this file uses the same 11-day figure documented for the closest listed comparable activity, consistent with the governing building-permit timeline used elsewhere in this file.
  • Re-roofing has no dedicated fee ordinance in Yuma — it is billed on the same valuation-based Table 1-A schedule verified for new construction, confirmed by a full read of the Chapter 150 table of contents (American Legal) showing no separate roofing subchapter.

Frequently asked questions

Yuma requires a re-roofing permit for: Building permit required for re-roofing under the 2024 IBC (commercial, § 150-015) or 2024 IRC (residential, § 150-180); no permit-type-specific ordinance exists — re-roofing is valued and permitted under the general building-permit provisions; Permit fee is the governing valuation-based Table 1-A schedule (Yuma City Code § 150-016(I) / § 150-181(K)), the same schedule verified for the Residential Building Permit (New Construction) permit type in this file, applied to the re-roof's contract valuation; Plan review fee is 65% of the building permit fee where plan review is required (§ 150-181(L)); Review timeline is governed by the City's A.R.S. § 9-835 Building Permit Processing Time Frames document (the same governing timeline source verified for other permit types in this file). If your project isn't listed, confirm with City of Yuma Department of Community Development, Building Safety Division at (928) 373-5163 before starting work.

In Yuma, the published Building Permit Fee — valuation-based (governing Table 1-A schedule, same as new construction) is: $50.00 minimum ($1-$500 valuation), scaling per Table 1-A (e.g., $110.00 for first $2,000 plus $16 per additional $1,000 up to $25,000). Additional published fees: Plan Review Fee — 65% of the building permit fee; Other Inspections and Fees — $75.00/hour minimum (2-hr minimum after-hours), $150.00/hour weekends/holidays, or total hourly City cost if greater. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Yuma's published plan-review target for a re-roofing permit is 6–11 business days.

You'll need: Building Permit Application (Roofing). See the required-documents checklist on this page for details on each.

Yuma requires 1 inspection(s) for a re-roofing permit, in order: Roof Inspection. Schedule each through City of Yuma Department of Community Development, Building Safety Division ((928) 373-5163).

Apply through City of Yuma Department of Community Development, Building Safety Division at Yuma City Hall, Second Floor, One City Plaza, Yuma, AZ 85364-1436. Phone: (928) 373-5163, email: Inspection@YumaAZ.gov. Office hours: Monday - Thursday 7:00 AM - 5:00 PM; every other Friday 7:00 AM - 5:00 PM; closed on designated City holidays. Inspections: (928) 373-5170 (non-emergency, request by 3 p.m. for next-business-day scheduling); after-hours/emergency inspections (928) 373-5163.. Official information: https://www.yumaaz.gov/government/building-safety.

Yuma, Arizona has adopted: Arizona has no mandatory statewide building code — code adoption is a per-city/county authority under A.R.S. §§ 9-801 et seq. (municipal adoption of technical codes) and City of Yuma Charter Art. VII, § 6(g)(6). The City of Yuma's Department of Community Development, Building Safety Division administers and enforces its own adopted codes within city limits; this is not a county-run or state-run program for the incorporated City of Yuma. Source: Yuma City Code Chapter 150, §§ 150-015, 150-060, 150-045, 150-076, 150-180 (adoption sections, each citing A.R.S. §§ 9-801 et seq. and Charter Art. VII, § 6(g)(6)), codelibrary.amlegal.com/codes/yuma; 2024 International Building Code (IBC), including Appendices C, I, J, K, and O — adopted by City of Yuma Ord. O2025-033, passed 10-1-25 (effective November 3, 2025); Yuma City Code § 150-015; 2024 International Residential Code for One- and Two-Family Dwellings (IRC), including Appendices BB, BF, BG, BH, BJ, BO, CD, and CF — adopted by City of Yuma Ord. O2025-034, passed 9-17-25 (effective November 3, 2025); Yuma City Code § 150-180; 2024 International Existing Building Code (IEBC), including Appendices A, B, and E — adopted by City of Yuma Ord. O2025-035, passed 9-17-25 (effective November 3, 2025); Yuma City Code § 150-170; 2024 International Property Maintenance Code (IPMC) — effective November 3, 2025; Yuma City Code § 150-090; 2024 International Fire Code (IFC), including Appendices B, C, D, E, F, G, H, and I — adopted by reference with local amendments by City of Yuma Ord. O2025-039, passed 10-1-25; Yuma City Code § 131-15 (amendments at § 131-16). Appendices A, J, K, L, M, N and O are expressly NOT adopted (§ 131-16(SS) through (GGG)). The City of Yuma Fire Code is enforced by the Community Risk Reduction Division within the Yuma Fire Department, under the supervision of the Fire Chief and with a Fire Marshal in charge of the division (§ 131-18; IFC § 103.1 as amended at § 131-16(D)) — fire permitting is NOT delegated to an independent fire district. Confirmed live on the City’s own Community Risk Reduction page: “The City of Yuma has adopted the 2024 International Fire Code (IFC) with local amendments.” Sources: codelibrary.amlegal.com/codes/yuma (2026 S-74, read 2026-08-16); yumaaz.gov/government/yuma-fire-department/community-risk-reduction/about-fire-codes-and-ordinances (read in a real browser 2026-08-16).; Per the City of Yuma Building Safety Division page: a transitional period ran through January 31, 2026 during which applicants could choose either the 2018 or 2024 codes; use of the 2024 codes became mandatory for all new permit applications beginning February 1, 2026. Source: yumaaz.gov/government/building-safety; 2018 International Plumbing Code (IPC), including Appendices C and E, made public record by Resolution R2022-018 — adopted by City of Yuma Ord. O2022-008, passed 5-4-22; Yuma City Code § 150-060 (Note: Arizona municipalities may adopt either the UPC or IPC; Yuma has adopted the International Plumbing Code, not the Uniform Plumbing Code); 2018 International Mechanical Code (IMC), made public record by Resolution R2022-019 — adopted by City of Yuma Ord. O2022-009, passed 5-4-22; Yuma City Code § 150-045; 2018 International Fuel Gas Code (IFGC) — adopted by City of Yuma; Yuma City Code § 150-065; NFPA 70 National Electrical Code (NEC), 2020 Edition, and 2006 International Code Council Electrical Code (ICCEC) Administrative Provisions, made public record by Resolution R2022-021 — adopted by City of Yuma Ord. O2022-011, passed 5-4-22; Yuma City Code § 150-076; 2009 International Energy Conservation Code (IECC), made public record by Resolution R2013-09 — adopted by City of Yuma Ord. O2013-15, passed 4-3-13; Yuma City Code § 150-020 (this is the most recent energy-code edition found adopted by ordinance; no more recent IECC adoption ordinance was located as of this review); 2018 International Swimming Pool and Spa Code (ISPSC) — Yuma City Code § 150-018; ICC A117.1 Accessibility — referenced via Yuma City Code § 150-016(T), in conjunction with Arizona Revised Statutes Title 41, Chapter 9, Article 8 (A.R.S. § 41-1492 et seq., The Arizonans with Disabilities Act) and ADAAG; Adobe Building Code (locally authored, not an ICC model code) — Yuma City Code §§ 150-030 through 150-035, covering burnt/unburned adobe masonry construction, electrical, and plumbing requirements specific to adobe structures. Local amendments apply — see the Yuma overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.