PermitBaseMountain West

Mechanical / HVAC Permit in Yuma, Arizona

Verified

Required for heating, ventilation, air conditioning, and related mechanical installations in Yuma, governed by the 2018 International Mechanical Code (IMC) as adopted by City of Yuma Ord. O2022-009 (Yuma City Code § 150-045), with a locally-adopted fee schedule at § 150-046(F).

Verified 2026-07-03 · Source

From$50.00Permit Issuance — see all 11 fees below

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Permit Issuance$50.00 (plus $7.00 for each supplemental permit on an unexpired original)Yuma City Code § 150-046(F), Table 1-A: Mechanical Permit Fees
Forced-air/gravity furnace or burner, up to 100,000 Btu/h$15.00Yuma City Code § 150-046(F), Table 1-A
Forced-air/gravity furnace or burner, over 100,000 Btu/h$18.00Yuma City Code § 150-046(F), Table 1-A
Floor furnace (incl. vent) / suspended, recessed wall, or floor-mounted unit heater$15.00 eachYuma City Code § 150-046(F), Table 1-A
Appliance vent (not included in an appliance permit)$7.00Yuma City Code § 150-046(F), Table 1-A
Alteration or addition to heating/cooling/absorption appliance or system$14.00Yuma City Code § 150-046(F), Table 1-A
Air-handling unit, up to 10,000 cfm / over 10,000 cfm$11.00 (up to 10,000 cfm) / $18.00 (over 10,000 cfm)Yuma City Code § 150-046(F), Table 1-A
Evaporative cooler (other than portable)$11.00Yuma City Code § 150-046(F), Table 1-A
Ventilation fan connected to a single duct$11.00Yuma City Code § 150-046(F), Table 1-A
Appliance/equipment not classed elsewhere or no listed fee$11.00Yuma City Code § 150-046(F), Table 1-A
Other Inspections and Fees$50.00/hour minimum (2-hr minimum after-hours; 0.5-hr minimum unlisted/reinspection/plan review), or total hourly City cost if greaterYuma City Code § 150-046(F), Table 1-A

Review timeline

611 business days

Yuma’s published plan-review target

Inspection process

  1. 1

    Rough-In

    Ductwork and mechanical equipment rough-in before walls closed

  2. 2

    Final

    Equipment operational, condensate disposal, combustion air, and clearances verified

Tips

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Yuma

Mechanical / HVAC Permit in other cities

Compare mechanical / hvac permit fees across Arizona

Related guides

Project checklist — coming soon

Describe your project once and get every permit, document, and fee it triggers in Yuma — in one checklist. Leave your email and we'll tell you when it's ready.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.