EV Charger / Electric Vehicle Charging Station Permit in Yuma, Arizona
Required for installation of a residential or commercial EV charger/EVSE in the City of Yuma. The Yuma City Code (§ 150-077, Electrical Permit Fee Schedule) and the City's Building Safety pages publish no dedicated EV charger/EVSE permit type, submittal page, or Table 1-A fee line item — the same documentation gap the solar-pv-permit entry flags. An EV charger installation is permitted as ordinary electrical work under the same NFPA 70 NEC 2020 Edition framework (Yuma City Code § 150-076/077) as any other electrical permit: the base $50.00 Permit Issuance fee plus the applicable Table 1-A fee bracket for the scope of work. Other electrical fee lines that can apply are the $7.00 supplemental fee, the $50.00/$75.00/$125.00 Services tiers, and $50.00/hour for Other Inspections; the code is current through American Legal version '2026 S-74'. For a kW-rated EVSE charging unit the most specifically applicable bracket is Table 1-A 'Power Apparatus' — rated by HP/kW/kVA/kVAR, the same bracket the solar-pv-permit entry documents as covering kW-rated inverters, and the standard Table 1-A classification for motor/apparatus-type electrical equipment — as distinct from the flat 'Services' fee, which applies to a new or upgraded electrical service connection rather than the charger unit itself.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for the EV charger circuit, any panel/service upgrade, and equipment installation, governed by NFPA 70 NEC 2020 Edition as adopted by Yuma City Code § 150-076
- Requirements of the most current Arizona Public Service (APS) Electric Service Manual supersede the NEC where APS requirements are more restrictive (§ 150-077(A))
- Apply through the Development Portal (Tyler EnerGov) or in person at Yuma City Hall
- If the installation requires new structural work (e.g., a new carport), a companion building permit (valuation-based, Table 1-A) may also apply
- Confirm with Building Safety (928-373-5100 general line; Inspection@YumaAZ.gov for inspection scheduling) which specific Table 1-A fee bracket currently applies to a standalone EV charger circuit before applying, since no EV-specific line item is published
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Yuma City Code § 150-077(L), Table 1-A — the tipsAndGotchas flags a possible unverified 2025 rate increase to $75/$150 per hour for this same 'Other Inspections' line in the Building Permit Fee Table; Show full citationHide
Yuma City Code § 150-077(L), Table 1-A — the tipsAndGotchas flags a possible unverified 2025 rate increase to $75/$150 per hour for this same 'Other Inspections' line in the Building Permit Fee Table; the Electrical Table's published rate remains $50/hour as of the amlegal.com-hosted code textYuma City Code § 150-077(L), Table 1-A, System Fee Schedule item 5 — a Level 2 charger (typically 7-19 kW) would fall in the 'over 1 and not over 10' ($13.00) or 'over 10 and not over 50' ($25.00) bracket; Show full citationHide
Yuma City Code § 150-077(L), Table 1-A, System Fee Schedule item 5 — a Level 2 charger (typically 7-19 kW) would fall in the 'over 1 and not over 10' ($13.00) or 'over 10 and not over 50' ($25.00) bracket; a DC fast charger (50 kW+) would fall in the $50.00 or $67.00 brackets. This is the same bracket the solar-pv-permit entry documents as covering kW-rated invertersReview timeline
Inspection process
- 1
Rough-In (if applicable)
Wiring and panel/service connections before walls are closed, if the installation involves new concealed wiring
- 2
Final
Charger circuit, breaker sizing, and equipment connection verified per NFPA 70 NEC 2020 Edition as locally amended
See the full Yuma inspection guide — scheduling & re-inspection fees →
Tips
- Yuma has no EV-specific permit page or fee line, the same documentation gap this record already flags for solar PV — treat an EV charger as ordinary electrical-permit-track work and confirm the exact fee bracket with Building Safety before applying.
- If the installation needs a panel/service upgrade to support the charger's amperage, budget for the separate 'Services' fee bracket in addition to the base $50 Permit Issuance fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Yuma's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Yuma yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Yuma lands. Privacy.
Other permits in Yuma
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Yuma project checklist
Describe your project once and get every permit, document, and fee it triggers in Yuma — in one checklist. Free, for any city and any number of projects.
Get started →