Plumbing Permit — Yuma, Arizona · Requirements sheet
Verified 2026-07-03 · Source: https://codelibrary.amlegal.com/codes/yuma/latest/yuma_az/0-0-0-41955
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Yuma, Arizona
Required for plumbing installation, alteration, or repair work in Yuma, governed by the 2018 International Plumbing Code (IPC) as adopted by City of Yuma Ord. O2022-008 (Yuma City Code § 150-060), with a locally-adopted fee schedule at § 150-061(E).
Verified 2026-07-03 · Source
When you need this permit
- Plumbing permit required for installation, alteration, or repair of any plumbing system, fixture, water heater, gas piping, or sewer/water service line under the 2018 IPC as adopted by Yuma City Code § 150-060
- Minimum permit issuance fee of $50.00 plus per-item unit fees per § 150-061(E), Table 1-A
- Buried non-metallic piping must be identified with minimum #12 gauge solid copper insulated tracer wire per ARS § 40-360 (§ 150-061(N))
- Copper/copper-alloy water distribution piping is prohibited in or on the ground under buildings unless installed in a continuous Schedule 40 ABS/PVC sleeve (§ 150-061(R))
- Apply through the Development Portal or in person
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Underground/Slab
Before concrete pour — pipe slope, materials, cleanouts, sewer depth (minimum 12 inches below grade per § 150-061(M))
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
Fixtures connected, water heater T&P verified, cleanouts exposed, no leaks
See the full Yuma inspection guide — scheduling & re-inspection fees →
Tips
- Per the City's Building Permit Processing Time Frames document, 'Residential Plumbing' has an 11-business-day overall review time (1-day admin + 5-day first review).
- Yuma has adopted the International Plumbing Code (IPC), not the Uniform Plumbing Code (UPC) used in some other Western states.
- Grease interceptor sizing for new Food Service Establishments follows a Drainage Fixture Unit (DFU) table; a minimum 500-gallon outdoor grease interceptor is required for all new Food Service Establishments unless a variance is granted (§ 150-061(Y)).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Yuma
Plumbing Permit in other cities
Compare plumbing permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Yuma project checklist
Describe your project once and get every permit, document, and fee it triggers in Yuma — in one checklist. Free, for any city and any number of projects.
Get started →