Skip to main content
PermitBase

Sacramento building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Sacramento, California.

Last verified 2026-09-11 · Source · Embed this page’s badge · Version history

Building department

Phone
916-264-5011
Office hours
NOT ASSERTED. Sacramento publishes a Public Counter Information & Appointments page; no hours are stated here. The Building Division help line is 916-264-5011.

Codes adopted

California publishes its building standards as Title 24, adopted by state agencies and republished on a three-year cycle. A city or county may change those standards only after its governing body makes an express finding that the change is reasonably necessary because of local climatic, geological, or topographical conditions, and no change becomes operative until the finding and the change have been filed with the California Building Standards Commission.

  • California Building Standards Code as applied locally. Sacramento's ADU handout names the set it works to: the 'applicable provisions of the current California Building Code (CBC), Residential (CRC), Energy' code, together with Plumbing (CPC), Mechanical (CMC), Electrical (CEC) and local ordinances. NO EDITION YEAR IS ASSERTED - the handout says 'current', and this record does not state the City's adopting ordinance.

Permit types & fees

Sacramento's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Sacramento yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Sacramento lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
141units

129 buildings · $47.7M valuation

Trailing 12 months
2,397units

12 of 12 months reported · #3 in California coverage by units

Year to date (2026 YTD through 2026-07)
1,376units

825 buildings · $330M valuation

7 month(s) reported to Census

Full year 2025
2,297units

1,092 buildings · $540.8M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All California building activity

Tips & gotchas

  • HOMEOWNERS MAY PULL ONLY THREE MINOR PERMITS ONLINE - residential re-roof, residential HVAC change out and residential water heater change out, for single-family or duplex. A California licensed contractor can pull the full minor list including electrical and plumbing scopes.
  • THE ONLINE HVAC SCOPE IS LIMITED TO ONE AND TWO FAMILY DWELLING UNITS, stated in the scope line itself.
  • SACRAMENTO'S 'WHEN IS A PERMIT REQUIRED' EXAMPLES INCLUDE THE NON-OBVIOUS - landscape irrigation, window replacements, fences, retaining walls and water heaters all appear.
  • TWO ADUs ARE ALLOWED PER LOT, sharing a single 1,200 square foot detached floor-area budget between them; planning approval comes before the building permit unless concurrent review is approved.
  • A SOLAR SUBMITTAL NEEDS THE SMUD INTERCONNECTION LETTER UP FRONT, and fees are invoiced only after approval - the cost is not known at submittal.
  • THE ADU HANDOUT IS A TWO-COLUMN PDF. Its text interleaves across columns when extracted, so a sentence that appears continuous on screen may not be contiguous in the file. Quote carefully.