Sign Permit — Broomfield, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://www.broomfield.org/DocumentCenter/View/2542/Sign-Permit-Application
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Broomfield, Colorado
Required for most permanent signage in the City and County of Broomfield, including freestanding, monument, wall, and ground-level directional signs. Filed on a dedicated Sign Permit Application requiring both Building Division and Planning Division sign-off, and reviewed against the City's sign code (BMC Chapter 17-44) for placement, area, setback, and illumination limits.
Verified 2026-08-13 · Source
When you need this permit
- Sign permit required for most permanent signage; off-site signage is prohibited under BMC 17-44-060
- Signs must comply with the approved site development plan and the sign code (BMC Chapter 17-44); Planning Division approval is required in addition to Building Division approval — the application has separate 'Building Division Approval' and 'Planning Division Approval' sign-off blocks
- Illuminated signs must not exceed 0.3 foot-candles of light detectable at the property line per BMC 17-44-080(D); the applicant must affirm compliance on the application and may be asked to provide documentation at review
- Application must state sign type (Ground Level Directional, Freestanding, Wall, or Monument), number of signs, illumination status, and sign area (sf) for each type present
- For ground level, freestanding, and monument signs, actual distances to all four property lines (front, left side, right side, rear setbacks) must be shown
- Application must state the tenant's leased area, total sign area, and number of tenants in the building
- A site plan showing sign location, distance to property line(s), street location, and frontage of tenant space on the building is required, along with a sign plan/detail showing dimensions, height above ground, text/pictures/symbols, sign materials, type of lighting (if applicable), and method of mounting
- Freestanding signs may require an engineered foundation
- It is the owner's responsibility to obtain any required Homeowners' Association and/or Architectural Control Committee approval
- Project valuation (General and, where applicable, Electrical trade) is entered on the same BMC §15-03-100 basis as other Broomfield trade permits
- Temporary signs are a separate, no-fee Planning Division 'Development Application' category, distinct from this permanent Sign Permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (freestanding signs only)
Engineered footing inspection before concealment, where an engineered foundation is required
- 2
Final
Sign installed per approved plans; electrical connection and illumination compliance (0.3 foot-candle limit) verified for illuminated signs
See the full Broomfield inspection guide — scheduling & re-inspection fees →
Tips
- Sign permits require dual sign-off — both the Building Division and the Planning Division approve the same application — unlike a standard trade permit that only needs Building Division review.
- The City's Review Timelines page lists 'Sign' at 3 to 4 weeks for first comments — longer than every residential trade-permit category and most residential project types, second only to full building-permit categories (residential addition, tenant finish, new commercial, new house).
- Confirm illumination compliance before submitting — illuminated signs cannot exceed 0.3 foot-candles of light detectable at the property line (BMC 17-44-080(D)), and documentation may be requested at review.
- Don't confuse this permit with a Temporary Sign application — temporary signs go through a separate, no-fee Planning Division development-application category, not the valuation-based Sign Permit Application.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Broomfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Broomfield
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →