Residential Addition / Basement Finish / Remodel Permit in Broomfield, Colorado

Required for additions, basement finishes, and remodels affecting structural or life-safety elements of one- and two-family dwellings in Broomfield. Reviewed against the 2024 IRC as adopted by Ordinance No. 2295. Applications submitted by email.

Verified 2026-07-23 · Source

When you need this permit

  • Building permit required for additions, basement finishes/remodels, and structural repairs
  • Additions and basement finish/remodel projects require a Basement Finish/Home Remodel Questionnaire, Plans, a Site Plan (for additions), and an Engineer Stamped Report (for additions, or for interior structural remodels)
  • Structural repairs require Plans and an Engineer Stamped Report
  • General Permit Application and a Homeowner Statement (if the homeowner is performing any part of the work) required for all submittals
  • All permit application documents must be emailed to buildingpermits@broomfield.org — not submitted via the Online Portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee — valuation-based (same schedule as new construction)City and County of Broomfield Building Division Fee Schedule
$23.50 minimum ($1-$500 valuation), scaling per the published fee table up to $293.25 at $17,000-$18,000; above $18,000 the codified BMC 15-03-100 Table 1-A schedule continues (e.g., $69.25 + $14.00/$1,000 from $2,000-$25,000, down to $4.75/$1,000 above $500,000)
Use Tax on building materialsCity and County of Broomfield Fees page
4.15% of 50% of total project valuation

Review timeline

Plan reviewBroomfield’s published plan-review target
7–35 business days

How long did your Residential Addition / Basement Finish / Remodel Permit permit actually take in Broomfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Framing/Rough-In

    Structural framing and mechanical/electrical/plumbing rough-in before walls closed

  2. 2

    Final

    All work complete per approved plans

See the full Broomfield inspection guide — scheduling & re-inspection fees →

Tips

  • Review Timelines page lists 'Basement Finish & Remodel' at 1 to 2 weeks and 'Residential Addition' at 4 to 5 weeks — the combined range for this permit type spans both.
  • Site plans should show lot dimensions and all existing/proposed structures; floor plans should show room use, framing, and dimensions.

Frequently asked questions

Yes, if the remodel involves interior structural work — the Building Division's submittal checklist requires an Engineer Stamped Report for interior structural remodels, in addition to the Basement Finish/Home Remodel Questionnaire and plans.

In Broomfield, the published Building Permit Fee — valuation-based (same schedule as new construction) is: $23.50 minimum ($1-$500 valuation), scaling per the published fee table up to $293.25 at $17,000-$18,000; above $18,000 the codified BMC 15-03-100 Table 1-A schedule continues (e.g., $69.25 + $14.00/$1,000 from $2,000-$25,000, down to $4.75/$1,000 above $500,000). Additional published fees: Use Tax on building materials — 4.15% of 50% of total project valuation. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Broomfield's published plan-review target for a residential addition / basement finish / remodel permit is 7–35 business days.

You'll need: General Permit Application; Basement Finish / Home Remodel Questionnaire. Depending on your project, Broomfield may also ask for: Homeowner Statement; Engineer Stamped Report. See the required-documents checklist on this page for details on each.

Broomfield requires 2 inspection(s) for a residential addition / basement finish / remodel permit, in order: Framing/Rough-In, Final. Schedule each through City and County of Broomfield Building Division (Community Development Department) (303-438-6370).

Apply through City and County of Broomfield Building Division (Community Development Department) at George Di Ciero City & County Building, One DesCombes Drive, Broomfield, CO 80020. Phone: 303-438-6370, email: buildingpermits@broomfield.org. Office hours: Monday-Friday, 8:00 a.m. to 5:00 p.m., except holidays; payments accepted 9:00 a.m. to 4:00 p.m. Over-the-counter Plans Analyst consultations available Tuesdays 9am-Noon and Thursdays 1-4pm. Chief Building Official: Tim Pate, tpate@broomfield.org. Permits cannot be submitted through the Online Portal — all permit application documents, revisions, and affidavits must be emailed to buildingpermits@broomfield.org.. Official information: https://www.broomfield.org/174/Building.

Broomfield, Colorado has adopted: Colorado is a home-rule state with NO single statewide building code — each municipality and county adopts and amends its own code edition(s). The only statewide floor requirements are energy-code related (HB22-1362, the Colorado Energy Code Board / Model Low Energy and Carbon Code process) and, for accessory dwelling units, HB24-1152 (statewide ADU standards for eligible jurisdictions). Applicants working in any other Colorado city or county must independently confirm that jurisdiction's own adopted code edition and amendments — do not assume Broomfield's editions apply elsewhere. Source: Colorado Energy Office, Colorado Department of Local Affairs.; City and County of Broomfield Ordinance No. 2295, adopted by Broomfield City Council, effective April 15, 2026: adopts the 2024 International Building Code, 2024 International Residential Code, 2024 International Mechanical Code, 2024 International Plumbing Code, 2024 International Fuel Gas Code, 2024 International Existing Building Code, and 2024 International Fire Code (2024 ICC code series), plus the Colorado Low Energy and Carbon Code (state Model Low Energy Carbon Code / MLECC amendment package). Source: City and County of Broomfield Building Code Information page and Building Division page.; 2023 National Electrical Code (NEC) — City and County of Broomfield began enforcement August 1, 2023, based on the State of Colorado's statewide NEC adoption (Colorado state law requires uniform statewide adoption of the NEC only, per the State Electrical Board). Broomfield will begin enforcement of the 2026 NEC on August 1, 2026, per the State Electrical Board's adoption schedule. Source: City and County of Broomfield Building Code Information page.; Broomfield Municipal Code (BMC) Title 15 (Building and Construction) codifies the locally-amended code editions and permit-fee authority (BMC 15-03-100); BMC Title 17 (Zoning), Chapter 17-32, governs accessory uses including fences (17-32-140) and accessory dwelling units (17-32-160 / 17-04-089). Source: City and County of Broomfield Building Code Information page; Municode library.; Wildland Urban Interface (WUI) Code: a state-mandated model code (Colorado Wildfire Resiliency Code Board) that all Colorado jurisdictions must adopt by March 1, 2026 and enforce by June 1, 2026 (both deadlines confirmed on the City's dedicated 'Broomfield Voice' WUI project page, itself last updated 2026-04-15). The City's Building Division page still carries unchanged 2025-vintage text (re-fetched live 2026-07-23, identical to the 2026-07-18 and 2026-07-03 captures) stating Broomfield had not yet held its adoption hearing and was not expected to consider adoption until early 2026. The dedicated Broomfield Voice WUI page (also re-fetched live 2026-07-23, unchanged since its 2026-04-15 update) is more current and explicit: as of its last update the Wildfire Resilience Code 'has not been adopted by Broomfield,' hearing dates are 'not yet set,' and adoption-ordinance readings 'are not anticipated to occur until the second half of 2026.' Both the March 1, 2026 statewide adoption deadline and the June 1, 2026 enforcement deadline have now passed with no adoption on record on either page — Broomfield's WUI code is not yet in effect as of today. Confirm current status directly with the Building Division before relying on it. Source: City and County of Broomfield Building Division page, 'Wildland Urban Interface Code' notice; City of Broomfield ('Broomfield Voice'), '2025 Colorado Wildfire Resiliency Code' project page and its 'Key Dates' tab.. Local amendments apply — see the Broomfield overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Broomfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.