EV Charging Station Permit in Broomfield, Colorado

Required for installation of Level 1, Level 2, or DC Fast electric vehicle charging equipment (EVSE) at residential and non-residential properties in the City and County of Broomfield. Broomfield publishes a dedicated 'EV Charging Stations Installation and Permitting' guidance page, but the permit itself is filed as a standard building permit (with an accompanying electrical plan), not a separate EV-specific permit type or fee category.

Verified 2026-07-23 · Source

When you need this permit

  • Completed building permit application submitted to buildingpermits@broomfield.org or in person
  • Contractor information with a valid Broomfield business license
  • Homeowner statement required if the property owner performs any of the work themselves
  • Site plan showing EVSE location, structures, accessible parking spaces, and property boundaries
  • Electrical plan with load calculations and panel schedules — engineered-stamped for commercial installations
  • Manufacturer specification sheets for the charging equipment
  • Xcel Energy capacity screening required for higher-capacity installations, separate $300 utility fee
  • Underground inspection may be required; final inspection always required

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building/Electrical Permit Fee — valuation-based (no distinct EV-charger fee category)Broomfield's EV Charging Stations page states fees are due upon permit issuance but does not publish an EV-specific dollar figure; billed under the same valuation-based table as other electrical/building work
$23.50 minimum, scaling per the valuation bands in the Building Division Fee Schedule (BMC 15-03-100, Table 1-A)
Xcel Energy Capacity Screening FeeSeparate utility (not city) fee for capacity screening on higher-capacity EVSE installations, per Broomfield's EV Charging Stations Installation and Permitting page
$300
Plan Review Fee (where applicable)City and County of Broomfield Fees page
65% of the electrical/building permit fee

Review timeline

Plan reviewBroomfield’s published plan-review target
7–28 business days

How long did your EV Charging Station Permit permit actually take in Broomfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground Inspection

    May be required depending on installation scope (e.g., trenching for conduit to a detached charging location)

  2. 2

    Final Inspection

    Always required — verifies completed EVSE installation, circuit, and grounding

See the full Broomfield inspection guide — scheduling & re-inspection fees →

Tips

  • Broomfield publishes real, distinct review-timeline commitments for EV charger permits — 1 to 2 weeks residential, 2 to 4 weeks commercial — which is more specific than most peer jurisdictions publish.
  • Higher-capacity EVSE installations may trigger a separate $300 Xcel Energy capacity screening fee, billed by the utility rather than the city.
  • Commercial EVSE electrical plans must be engineered-stamped; residential plans do not require this.

Frequently asked questions

Broomfield requires an ev charging station permit for: Completed building permit application submitted to buildingpermits@broomfield.org or in person; Contractor information with a valid Broomfield business license; Homeowner statement required if the property owner performs any of the work themselves; Site plan showing EVSE location, structures, accessible parking spaces, and property boundaries; Electrical plan with load calculations and panel schedules — engineered-stamped for commercial installations; Manufacturer specification sheets for the charging equipment; Xcel Energy capacity screening required for higher-capacity installations, separate $300 utility fee; Underground inspection may be required; final inspection always required. If your project isn't listed, confirm with City and County of Broomfield Building Division (Community Development Department) at 303-438-6370 before starting work.

No distinct EV-charger fee category is published. The permit is billed under Broomfield's standard valuation-based Building/Electrical Permit Fee schedule. A separate $300 Xcel Energy capacity screening fee may apply for higher-capacity installations.

Broomfield's EV Charging Stations Installation and Permitting page states residential EV charging station permits typically take 1 to 2 weeks, while commercial permits take 2 to 4 weeks.

You'll need: Building Permit Application (EV Charging Station); Electrical Plan with Load Calculations; Manufacturer Specification Sheet. See the required-documents checklist on this page for details on each.

Broomfield requires 2 inspection(s) for an ev charging station permit, in order: Underground Inspection, Final Inspection. Schedule each through City and County of Broomfield Building Division (Community Development Department) (303-438-6370).

Apply through City and County of Broomfield Building Division (Community Development Department) at George Di Ciero City & County Building, One DesCombes Drive, Broomfield, CO 80020. Phone: 303-438-6370, email: buildingpermits@broomfield.org. Office hours: Monday-Friday, 8:00 a.m. to 5:00 p.m., except holidays; payments accepted 9:00 a.m. to 4:00 p.m. Over-the-counter Plans Analyst consultations available Tuesdays 9am-Noon and Thursdays 1-4pm. Chief Building Official: Tim Pate, tpate@broomfield.org. Permits cannot be submitted through the Online Portal — all permit application documents, revisions, and affidavits must be emailed to buildingpermits@broomfield.org.. Official information: https://www.broomfield.org/174/Building.

Broomfield, Colorado has adopted: Colorado is a home-rule state with NO single statewide building code — each municipality and county adopts and amends its own code edition(s). The only statewide floor requirements are energy-code related (HB22-1362, the Colorado Energy Code Board / Model Low Energy and Carbon Code process) and, for accessory dwelling units, HB24-1152 (statewide ADU standards for eligible jurisdictions). Applicants working in any other Colorado city or county must independently confirm that jurisdiction's own adopted code edition and amendments — do not assume Broomfield's editions apply elsewhere. Source: Colorado Energy Office, Colorado Department of Local Affairs.; City and County of Broomfield Ordinance No. 2295, adopted by Broomfield City Council, effective April 15, 2026: adopts the 2024 International Building Code, 2024 International Residential Code, 2024 International Mechanical Code, 2024 International Plumbing Code, 2024 International Fuel Gas Code, 2024 International Existing Building Code, and 2024 International Fire Code (2024 ICC code series), plus the Colorado Low Energy and Carbon Code (state Model Low Energy Carbon Code / MLECC amendment package). Source: City and County of Broomfield Building Code Information page and Building Division page.; 2023 National Electrical Code (NEC) — City and County of Broomfield began enforcement August 1, 2023, based on the State of Colorado's statewide NEC adoption (Colorado state law requires uniform statewide adoption of the NEC only, per the State Electrical Board). Broomfield will begin enforcement of the 2026 NEC on August 1, 2026, per the State Electrical Board's adoption schedule. Source: City and County of Broomfield Building Code Information page.; Broomfield Municipal Code (BMC) Title 15 (Building and Construction) codifies the locally-amended code editions and permit-fee authority (BMC 15-03-100); BMC Title 17 (Zoning), Chapter 17-32, governs accessory uses including fences (17-32-140) and accessory dwelling units (17-32-160 / 17-04-089). Source: City and County of Broomfield Building Code Information page; Municode library.; Wildland Urban Interface (WUI) Code: a state-mandated model code (Colorado Wildfire Resiliency Code Board) that all Colorado jurisdictions must adopt by March 1, 2026 and enforce by June 1, 2026 (both deadlines confirmed on the City's dedicated 'Broomfield Voice' WUI project page, itself last updated 2026-04-15). The City's Building Division page still carries unchanged 2025-vintage text (re-fetched live 2026-07-23, identical to the 2026-07-18 and 2026-07-03 captures) stating Broomfield had not yet held its adoption hearing and was not expected to consider adoption until early 2026. The dedicated Broomfield Voice WUI page (also re-fetched live 2026-07-23, unchanged since its 2026-04-15 update) is more current and explicit: as of its last update the Wildfire Resilience Code 'has not been adopted by Broomfield,' hearing dates are 'not yet set,' and adoption-ordinance readings 'are not anticipated to occur until the second half of 2026.' Both the March 1, 2026 statewide adoption deadline and the June 1, 2026 enforcement deadline have now passed with no adoption on record on either page — Broomfield's WUI code is not yet in effect as of today. Confirm current status directly with the Building Division before relying on it. Source: City and County of Broomfield Building Division page, 'Wildland Urban Interface Code' notice; City of Broomfield ('Broomfield Voice'), '2025 Colorado Wildfire Resiliency Code' project page and its 'Key Dates' tab.. Local amendments apply — see the Broomfield overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Broomfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.