Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) — Cheyenne Wells, Colorado · Requirements sheet
Verified 2026-08-26 · Source: https://571916.us23.myftpupload.com/wp-content/uploads/2026/08/2026-Building-Permit-Form.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) in Cheyenne Wells, Colorado
Cheyenne Wells has no separate commercial building-permit application, fee tier, or code track -- commercial and business construction within town limits runs through the same single Building Permit process used for residential work: submitted to the Town, inspected and signed by the Town Manager, and approved by Board of Trustees motion at a regular monthly meeting, billed at the same $25.00 Building Permit Application Fee plus $0.20 per square foot Structural Square Foot Fee. This is a confirmed shared product rather than an absence of commercial permitting: the Town's complete 2026 General Fee Schedule (Resolution #02-2026) carries no commercial or valuation-based fee line of any kind, the Town's 2026 Building Permit form is the only application published for any project type, and business-entity applicants (e.g. H&T Properties LLC, On Point/Bill Lowe) appear in Board of Trustees minutes under the same 'Building Permits' agenda item as homeowners. No current ICC-family code edition -- no IBC, IRC, or IECC -- is adopted by the Town for any occupancy; the only building-code adoption still on the Town's own books is a pre-ICC Uniform Building Code, Short Form, 1961 Edition (Ord. 123, 1963), whose fee table was last amended in 1984 and has not been repealed. No evidence of a third-party plan-review contractor (of the kind common among small Colorado towns) was found in the Town's public materials; review is performed directly by the Town Manager. A construction-materials use tax does apply: the Colorado Department of Revenue lists Cheyenne Wells as a state-collected city with a 2% use tax rate applying to motor vehicles and building materials, collected by the state rather than itemized in the Town's own fee resolution. Fire-related review for a commercial project falls to the Cheyenne Wells Fire Protection District #1, a separate special district whose own website publishes no plan-review or permit function.
Verified 2026-08-26 · Source
When you need this permit
- New commercial construction, additions, remodels, and tenant-improvement/business-occupancy work all use the same Building Permit Application, Town Manager inspection, and Board of Trustees motion-approval process documented on the residential-building-permit entry above -- confirmed by business-entity permits (H&T Properties LLC, On Point/Bill Lowe) appearing under the same 'Building Permits' agenda item as homeowner permits in Board of Trustees minutes
- No current IBC, IRC, or IECC edition is adopted by the Town for commercial or any other occupancy; the Town's own current Municipal Code, Title 15, Chapter 15.04, still carries only the pre-ICC Uniform Building Code, Short Form, 1961 Edition (adopted by Ord. 123, 1963; fee table amended by Ord. 172, 1984), which has not been repealed
- No separate commercial fee tier, valuation table, or plan-review/plan-check fee is published -- the Town's complete Resolution #02-2026, 2026 General Fee Schedule, contains only the flat $25.00 Building Permit Application Fee and $0.20 per square foot Structural Square Foot Fee used for any Building Permit filing
- No third-party building-department contractor was found named anywhere in the Town's public materials; the Town Manager inspects and signs each permit directly prior to Board of Trustees approval
- Colorado's Department of Revenue lists Cheyenne Wells as a state-collected city carrying a 2% use tax rate applying to motor vehicles and building materials -- a real construction cost collected by the state rather than by the Town itself
- Fire protection is provided by the Cheyenne Wells Fire Protection District #1, a legally separate special district from the Town; its own website publishes no fire-prevention, plan-review, or permit section, and no fire-suppression or fire-alarm code is codified in the Town's own Municipal Code
- Electrical and plumbing work on a commercial project is inferred (not verified against a state jurisdiction list) to default to Colorado DORA's Division of Professions and Occupations, the same as for residential work in Cheyenne Wells, since no town-run program for either trade was found
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Town of Cheyenne Wells Resolution #02-2026, 2026 General Fee Schedule, effective January 14, 2026 -- read directly from the original signed 3-page PDF (accessed 2026-08-26); Show full citationHide
Town of Cheyenne Wells Resolution #02-2026, 2026 General Fee Schedule, effective January 14, 2026 -- read directly from the original signed 3-page PDF (accessed 2026-08-26); applies to commercial filings the same as residential, since the Town publishes only one combined fee structure for all Building Permit applications.Colorado Department of Revenue, DR 1002 Colorado Sales/Use Tax Rates, January 2026 edition, State-Collected City Sales Taxes table: Cheyenne Wells (Cheyenne County) is listed with a City Sales Tax… Show full citationHide
Colorado Department of Revenue, DR 1002 Colorado Sales/Use Tax Rates, January 2026 edition, State-Collected City Sales Taxes table: Cheyenne Wells (Cheyenne County) is listed with a City Sales Tax Rate of 2%, a Use Tax Rate of 2%, and Use Tax applying to 'Motor Vehicles, Building Materials.' This is a state-collected city use tax, paid to the Colorado Department of Revenue rather than itemized in the Town's own Resolution #02-2026 fee schedule.Town of Cheyenne Wells Resolution #02-2026, 2026 General Fee Schedule; Show full citationHide
Town of Cheyenne Wells Resolution #02-2026, 2026 General Fee Schedule; the same fee line flagged as possibly applicable on the change-of-use-permit entry above. New commercial construction is inherently a zoning matter, so this fee may apply in addition to the Building Permit Application Fee, but the resolution does not specify which permit types trigger it.Review timeline
Inspection process
- 1
Town Manager Inspection
Town Manager inspects the project and signs the permit prior to Board of Trustees approval, the same process used for residential construction
Tips
- Cheyenne Wells has no separate commercial building permit, application, or fee schedule -- apply using the same Building Permit Application used for residential work, and budget the same $25 flat fee plus $0.20/sq ft structural fee.
- The Town has not adopted any current IBC, IRC, or IECC edition. The only building code still on its own books is a pre-ICC Uniform Building Code, Short Form, 1961 Edition, adopted by a 1963 ordinance and last fee-amended in 1984 -- confirm structural requirements directly with the Town Manager rather than assuming a modern code edition governs.
- A 2% Colorado use tax on building materials applies to construction in Cheyenne Wells, collected by the state (Cheyenne Wells is a state-collected, not self-collecting, city) rather than billed through the Town's own fee resolution -- budget for it separately from the Town's $25 + $0.20/sq ft fees.
- No evidence was found that Cheyenne Wells contracts its building-department function to a third-party firm; the Town Manager reviews and signs permits directly.
- The Cheyenne Wells Fire Protection District #1 is a separate special district from the Town and publishes no plan-review or permit process of its own; contact the District directly for a commercial project with a fire-suppression or alarm scope, and confirm any installer's Colorado DFPC registration independent of the local permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-26.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cheyenne Wells building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Cheyenne Wells.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Cheyenne Wells
Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) in other cities
Look up this fee in a different city →
Now live
Build your Cheyenne Wells project checklist
Describe your project once and get every permit, document, and fee it triggers in Cheyenne Wells — in one checklist. Free, for any city and any number of projects.
Get started →