Skip to main content
PermitBase

Plumbing Permit in Larkspur, Colorado

Required for plumbing installation, alteration, or repair within Larkspur Town limits. Unlike electrical permits, plumbing permits ('Plumbing Only' in the Town's own permit-type list) are processed through the general SAFEbuilt-administered building-permit system rather than an explicit standalone state-board deferral.

Reviewed 2026-07-23 · Source

When you need this permit

  • Application via SAFEbuilt's CommunityCore portal
  • Reviewed under the Town's adopted plumbing code: International Plumbing Code, 2018 Edition, adopted by Ordinance 2022-11 (4-21-2022) — CONFIRMED 2026-07-23 on the live Larkspur Municipal Code, Chapter 18, Article 2 (library.municode.com/co/larkspur)
  • $30.00 Town administrative fee plus fees per 'Exhibit C — Town of Larkspur Fee Table' in the Town-SAFEbuilt professional service agreement (Larkspur Municipal Code §18-2-40, Appendix A—Fee Schedule) — CONFIRMED 2026-07-23, live
  • Permit expires 180 days after issuance if work has not commenced, or after a 180-day work stoppage (IPC-adjacent local rule mirrors IBC/IRC §105.5, as amended by Ord. 2022-11)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Town Administrative feeLarkspur Municipal Code §18-2-40, Appendix A—Fee Schedule (live, Municode, current through Supp. 15 / 4-6-2026): '$30.00 + assessed fees' — CONFIRMED 2026-07-23
$30.00
Plumbing work fee (valuation/scope-based, per SAFEbuilt contract)
Exhibit C — Town of Larkspur Fee Table, Building Permit and Building Department Services Fee Schedule, Table A, page 10 — $23.50 for valuations to $500.00, then $23.50 plus $3.05 per $100 to $2,000; Show full citationExhibit C — Town of Larkspur Fee Table, Building Permit and Building Department Services Fee Schedule, Table A, page 10 — $23.50 for valuations to $500.00, then $23.50 plus $3.05 per $100 to $2,000; $69.25 plus $14.00 per $1,000 to $25,000; $391.25 plus $10.10 per $1,000 to $50,000; $643.75 plus $7.00 per $1,000 to $100,000; $993.75 plus $5.60 per $1,000 to $500,000; $3,233.75 plus $4.75 per $1,000 to $1,000,000; $5,608.75 plus $3.15 per $1,000 above that. The Single Stop Fee Schedule on page 11 prices two common plumbing jobs flat instead: Water Heater $75.00 and Sprinkler System $75.00. The previous entry recorded that no dollar figure is published through any public channel; Exhibit C publishes this table.
Varies — valuation-based per Exhibit C Table A, $23.50 minimum

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Larkspur?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Plumbing

    Required prior to covering

  2. 2

    Final Inspection

    Required prior to occupancy

See the full Larkspur inspection guide — scheduling & re-inspection fees →

Tips

  • Plumbing Only appears as its own listed permit type in Larkspur's permit taxonomy but is processed through the same SAFEbuilt CommunityCore system as other building trades, not a separate state-board application.
  • Larkspur's adopted plumbing code is the 2018 IPC (Ordinance 2022-11), with local amendments including a minimum 12-inch sewer depth (IPC §305.4.1), a modified drainage/vent air test requirement (§312.3), a 6-inch minimum roof extension (§903.1), and reclaimed water systems (Ch. 1304) deleted in their entirety — confirmed live on Municode (library.municode.com/co/larkspur, Chapter 18 Article 2).
  • The Town's Municipal Code confirms a flat $30.00 administrative fee applies to plumbing permits on top of SAFEbuilt's own valuation-based charges (Exhibit C of the Town-SAFEbuilt contract, not independently published).

Frequently asked questions

Larkspur requires a plumbing permit for: Application via SAFEbuilt's CommunityCore portal; Reviewed under the Town's adopted plumbing code: International Plumbing Code, 2018 Edition, adopted by Ordinance 2022-11 (4-21-2022) — CONFIRMED 2026-07-23 on the live Larkspur Municipal Code, Chapter 18, Article 2 (library.municode.com/co/larkspur); $30.00 Town administrative fee plus fees per 'Exhibit C — Town of Larkspur Fee Table' in the Town-SAFEbuilt professional service agreement (Larkspur Municipal Code §18-2-40, Appendix A—Fee Schedule) — CONFIRMED 2026-07-23, live; Permit expires 180 days after issuance if work has not commenced, or after a 180-day work stoppage (IPC-adjacent local rule mirrors IBC/IRC §105.5, as amended by Ord. 2022-11). If your project isn't listed, confirm with Town of Larkspur Building Department (building official services contracted to SAFEbuilt) at (303) 681-2324 before starting work.

In Larkspur, the published Town Administrative fee is: $30.00. Additional published fees: Plumbing work fee (valuation/scope-based, per SAFEbuilt contract) — Varies — valuation-based per Exhibit C Table A, $23.50 minimum. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Larkspur does not publish a plan-review timeline for this permit. Contact Town of Larkspur Building Department (building official services contracted to SAFEbuilt) at (303) 681-2324 for current turnaround.

You'll need: Building Permit Application (Plumbing Only). See the required-documents checklist on this page for details on each.

Larkspur requires 2 inspection(s) for a plumbing permit, in order: Rough Plumbing, Final Inspection. Schedule each through Town of Larkspur Building Department (building official services contracted to SAFEbuilt) ((303) 681-2324).

Apply through Town of Larkspur Building Department (building official services contracted to SAFEbuilt) at 8720 Spruce Mountain Road, Larkspur, CO 80118. Phone: (303) 681-2324, email: townclerk@townoflarkspur.org. Office hours: Town Hall main line (303) 681-2324. Building permit review, plan review, and inspections are performed by SAFEbuilt under contract; SAFEbuilt building official contact Nick Chand, and SAFEbuilt inspection scheduling line (720) 641-1956. General 'Do I Need a Permit?' and building-code questions may be directed to SAFEbuilt's Tom Pitchford at (303) 941-4429. The Town Clerk (Todd DeVoe, townclerk@townoflarkspur.org) is listed as the Town-side building department contact of record alongside SAFEbuilt.. Official information: https://www.townoflarkspur.org/building-department.

Larkspur, Colorado has adopted: Town of Larkspur Ordinance 2022-11, Adopting Building Codes — the Town's Building Codes page (townoflarkspur.org/building-department/page/building-codes) names this ordinance as the governing building-code adoption instrument, alongside a companion document titled 'Building Codes at a Glance.'; The Town's ordinance PDFs are hosted on SharePoint behind a Microsoft login — all six 'Building Codes' page share links, plus a seventh on the Fee Schedules page, redirect to login.microsoftonline.com with no anonymous-view path. Use Municode's hosted Larkspur Municipal Code instead: it is the Town's official codified code, current through Supplement 15 (online content updated April 6, 2026). Chapter 18 — Building Regulations, Articles 1 through 11, all cite 'Ord. No. 2022-11' as their sole adopting/amending ordinance, with no later amending ordinance for any article except Article 4 (Fire Code, also amended by Ord. No. 2023-01, § 1, 2-16-2023). The codified text gives the exact adopted edition for every code family: International Building Code (Art. 1) — 2018 Edition, Ch. 1-35 + Appendix Chapters E, I, N; International Plumbing Code (Art. 2) — 2018 Edition, Ch. 1-13, Ch. 15, Appendix Chapters C, E; International Mechanical Code (Art. 3) — 2018 Edition, Ch. 1-15 + Appendix Chapter A; International Fire Code (Art. 4) — 2018 Edition, Ch. 1-80 + Appendix B-N; International Fuel Gas Code (Art. 5) — 2018 Edition, Ch. 1-8 + Appendix Chapters A-D; International Residential Code (Art. 6) — 2018 Edition, Ch. 1-44 + Appendix Chapters A, E, G, H, J; International Energy Conservation Code (Art. 7) — 2018 Edition, Ch. 1-6 + Appendix RA (IRC Ch. 11 Energy Efficiency is separately deleted and replaced with the 2018 IECC per IRC amendment #28); International Property Maintenance Code (Art. 8) — 2018 Edition, Ch. 1-8 + Appendix A; National Electrical Code (Art. 9) — 2020 Edition, adopted per Title 31, Article 16, Part 2, C.R.S., 'as adopted, amended and updated to the most current edition by the Colorado State Electrical Board from time to time' — i.e. it tracks DORA/State Electrical Board updates, consistent with the electrical-permit deferral noted elsewhere in this entry; International Existing Building Code (Art. 10) — 2018 Edition, Ch. 1-16; International Swimming Pool and Spa Code (Art. 11) — 2018 Edition, Ch. 1-11. Source: https://library.municode.com/co/larkspur/codes/municipal_code?nodeId=CH18BURE. The Town Council Meeting Minutes of 4-21-2022 (media ID 2246, hosted on townoflarkspur.org rather than SharePoint) record the adoption: 'Councilmember Mindy Kazurova made a motion to approve Ord..2022-11 an Ord. adopting by reference of the International Building Codes 2018 editions... Roll call vote Six (6) approved, zero (0) opposed, Mayor affirmed Motion Passed.'; Colorado is a home-rule state with no single statewide-mandated building code edition for municipalities generally; Larkspur, as a home-rule town, sets its own adopted code editions by ordinance (Ordinance 2022-11, 4-21-2022) rather than following a state-mandated cycle.; HB22-1362 (statewide energy code floor) does not impose a flat statewide deadline. Per its own trigger mechanism (as summarized by the Colorado Energy Office, AIA Colorado, and the Southwest Energy Efficiency Project), a jurisdiction is only required to adopt the 2021 IECC (or an equivalent/better code) when it next updates ANY of its other building codes, with a one-year transition window, and again by 7-1-2026 under the state's Model Low Energy and Carbon Code. Larkspur's only building-code action since HB22-1362's 2022 enactment is Ordinance 2022-11 itself (4-21-2022), which predates the bill and was not a post-enactment update; the Municode codification (Supplement 15, current through 4-6-2026) shows no ordinance amending Chapter 18 Article 7 (Energy Code) or any other Article after Ord. 2022-11 (except the unrelated Fire Code amendment, Ord. 2023-01). Because Larkspur has not updated any of its building codes since HB22-1362 took effect, its 2021-IECC trigger has not activated, and the Town's 2018 IECC (adopted via Ord. 2022-11) remains its lawfully current energy code. Source: https://library.municode.com/co/larkspur/codes/municipal_code?nodeId=CH18BURE_ART7INENCOCO; Electrical permits: Larkspur's own website hosts a PDF titled 'Electrical Permit Fees' at https://www.townoflarkspur.org/media/2901 which, on direct inspection, is the Colorado Department of Regulatory Agencies (DORA) / Division of Professions and Occupations statewide Electrical Permit Fee Schedule (effective April 1, 2016; document letterhead address 1560 Broadway, Suite 1350, Denver, CO 80202, phone 303-894-2300, www.dora.state.co.us) — i.e. Larkspur does not run its own local electrical permitting program or set its own electrical fee schedule; it defaults to the Colorado State Electrical Board (DORA/DPO) fee structure per CRS 12-23-117(3), consistent with this project's Colorado-specific default rule. Larkspur is documenting/republishing the state's fee form rather than issuing an independent municipal fee schedule. CONFIRMED 2026-07-23 on the live Municode codification: Larkspur Municipal Code Sec. 18-9-10 formally adopts the National Electrical Code, 2020 Edition, 'as adopted, amended and updated to the most current edition by the Colorado State Electrical Board from time to time' — the code text itself directs to the state board's current edition rather than fixing a static local edition, matching the DORA-deferral finding above.; Plumbing permits: the Town publishes no Larkspur-specific plumbing permit fee schedule and no locally-administered plumbing licensing or inspection program separate from the SAFEbuilt-administered Building Permit process. Plumbing review is folded into SAFEbuilt's general building-permit review — the 'PLUMBING ONLY' permit type appears on the Town's own permit-type list and is issued through the same SAFEbuilt/CommunityCore process as other trade permits, rather than being deferred to a state board the way electrical is. Larkspur Municipal Code Sec. 18-2-10 adopts the International Plumbing Code, 2018 Edition, and Sec. 18-2-40(2) (IPC § [A]106.6.2, Fee schedule) is locally amended to read 'The fees for work shall be as indicated on the Town's Fee Schedule adopted by the Town Council,' cross-referencing Appendix A—Fee Schedule, which in turn lists Sec. 18-2-40 at a flat $30.00 Town administrative fee 'plus fees outlined in Exhibit C "Town of Larkspur Fee Table" in the professional service agreement between the Town of Larkspur and Safebuilt Colorado.' That is why no itemized plumbing valuation-based fee table appears anywhere on the Town's own site: the dollar-amount schedule is Exhibit C of a private Town-SAFEbuilt services contract, not a document the Town routinely publishes. Budget the $30.00 Town administrative fee plus the SAFEbuilt Exhibit C amount, which you will need to get from the Town or SAFEbuilt directly. Source: https://library.municode.com/co/larkspur/codes/municipal_code?nodeId=APXA--FEE_SCHEDULE (Supp. 15, current through 4-6-2026).. Local amendments apply — see the Larkspur overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Larkspur building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Property Access

Larkspur's permit history is searchable by address

274 permits on record for Larkspur, 2016–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free