Skip to main content
PermitBase

Residential Building Permit (New Construction — Single Family Residential Attached/Detached) in Larkspur, Colorado

Required for new single-family residential construction (attached or detached) within Larkspur Town limits. Reviewed and inspected by SAFEbuilt under contract to the Town, per Town of Larkspur Ordinance 2022-11 adopted building codes. Applications are submitted through SAFEbuilt's CommunityCore online portal.

Reviewed 2026-07-23 · Source

When you need this permit

  • Property must be confirmed within Larkspur Town limits (not unincorporated Douglas County) before applying to the Town's Building Department
  • Application submitted via SAFEbuilt's CommunityCore portal (homeowners) or CommunityCore contractor account (contractors, requiring prior account setup with the Town at 303-681-2324)
  • Plans reviewed against the Town's adopted codes: International Building Code, 2018 Edition and International Residential Code, 2018 Edition, both adopted by Ordinance 2022-11 (4-21-2022) — CONFIRMED 2026-07-23 on the live Larkspur Municipal Code, Chapter 18, Articles 1 and 6 (library.municode.com/co/larkspur)
  • Subject to the SAFEbuilt Plan Review Time Table: Single Family projects receive first comments within 5 business days and second-round comments within 3 business days
  • Permit expires 180 days after issuance if work has not commenced, or after a 180-day work stoppage; reactivation before 1 year costs half the original permit fee (IBC §105.5 / IRC §105.5, as amended by Ord. 2022-11)
  • Commencing work before the permit is issued triggers a fee equal to 100% of the original building fee, in addition to the required permit fees (IBC §109.4 / IRC §R108.6, as amended by Ord. 2022-11)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit fee (general, valuation-based)
Exhibit C — Town of Larkspur Fee Table, Building Permit and Building Department Services Fee Schedule, Table A, page 10 — $23.50 for valuations to $500.00, then $23.50 plus $3.05 per $100 to $2,000; Show full citationExhibit C — Town of Larkspur Fee Table, Building Permit and Building Department Services Fee Schedule, Table A, page 10 — $23.50 for valuations to $500.00, then $23.50 plus $3.05 per $100 to $2,000; $69.25 plus $14.00 per $1,000 to $25,000; $391.25 plus $10.10 per $1,000 to $50,000; $643.75 plus $7.00 per $1,000 to $100,000; $993.75 plus $5.60 per $1,000 to $500,000; $3,233.75 plus $4.75 per $1,000 to $1,000,000; $5,608.75 plus $3.15 per $1,000 above that. Plan review is 65% of the building permit fee for all other permits, per page 11. The previous entry recorded that no dollar figure is published through any public channel; Exhibit C publishes this table.
Varies — valuation-based per Exhibit C Table A, $23.50 minimum

Review timeline

Plan reviewLarkspur’s published plan-review target
3–5 business days

How long did your Residential Building Permit (New Construction — Single Family Residential Attached/Detached) permit actually take in Larkspur?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Larkspur inspection guide — scheduling & re-inspection fees →

    Tips

    • Larkspur's own Building Department page notes 'many permits can be processed in a day for minor projects' — the published 5-day/3-day Plan Review Time Table applies specifically to projects requiring a fuller plan review, not simple/minor scopes.
    • The adopted code editions are the 2018 IBC and 2018 IRC (Ordinance 2022-11, 4-21-2022), confirmed live on Municode (library.municode.com/co/larkspur, Chapter 18, Articles 1 and 6) and independently corroborated by the Town's own 4-21-2022 Council Meeting Minutes (media ID 2246, hosted directly on townoflarkspur.org). The Town's SharePoint-hosted ordinance PDF and 'Building Codes at a Glance' summary remain behind a genuine, re-confirmed Microsoft OAuth wall as of 2026-07-23 and are not needed now that Municode has the codified text.
    • Start construction within 180 days of permit issuance — the permit otherwise expires and either a half-fee reactivation (if under a year) or a full new permit fee (if over a year) applies.
    • Never start work before the permit is issued: Larkspur's own code assesses a 100% surcharge of the original building fee for work commenced before permit issuance, on top of the required fees.

    Frequently asked questions

    Larkspur requires a residential building permit (new construction — single family residential attached/detached) for: Property must be confirmed within Larkspur Town limits (not unincorporated Douglas County) before applying to the Town's Building Department; Application submitted via SAFEbuilt's CommunityCore portal (homeowners) or CommunityCore contractor account (contractors, requiring prior account setup with the Town at 303-681-2324); Plans reviewed against the Town's adopted codes: International Building Code, 2018 Edition and International Residential Code, 2018 Edition, both adopted by Ordinance 2022-11 (4-21-2022) — CONFIRMED 2026-07-23 on the live Larkspur Municipal Code, Chapter 18, Articles 1 and 6 (library.municode.com/co/larkspur); Subject to the SAFEbuilt Plan Review Time Table: Single Family projects receive first comments within 5 business days and second-round comments within 3 business days; Permit expires 180 days after issuance if work has not commenced, or after a 180-day work stoppage; reactivation before 1 year costs half the original permit fee (IBC §105.5 / IRC §105.5, as amended by Ord. 2022-11); Commencing work before the permit is issued triggers a fee equal to 100% of the original building fee, in addition to the required permit fees (IBC §109.4 / IRC §R108.6, as amended by Ord. 2022-11). If your project isn't listed, confirm with Town of Larkspur Building Department (building official services contracted to SAFEbuilt) at (303) 681-2324 before starting work.

    In Larkspur, the published Building Permit fee (general, valuation-based) is: Varies — valuation-based per Exhibit C Table A, $23.50 minimum. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Larkspur's published plan-review target for a residential building permit (new construction — single family residential attached/detached) is 3–5 business days.

    You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

    Apply through Town of Larkspur Building Department (building official services contracted to SAFEbuilt) at 8720 Spruce Mountain Road, Larkspur, CO 80118. Phone: (303) 681-2324, email: townclerk@townoflarkspur.org. Office hours: Town Hall main line (303) 681-2324. Building permit review, plan review, and inspections are performed by SAFEbuilt under contract; SAFEbuilt building official contact Nick Chand, and SAFEbuilt inspection scheduling line (720) 641-1956. General 'Do I Need a Permit?' and building-code questions may be directed to SAFEbuilt's Tom Pitchford at (303) 941-4429. The Town Clerk (Todd DeVoe, townclerk@townoflarkspur.org) is listed as the Town-side building department contact of record alongside SAFEbuilt.. Official information: https://www.townoflarkspur.org/building-department.

    Larkspur, Colorado has adopted: Town of Larkspur Ordinance 2022-11, Adopting Building Codes — the Town's Building Codes page (townoflarkspur.org/building-department/page/building-codes) names this ordinance as the governing building-code adoption instrument, alongside a companion document titled 'Building Codes at a Glance.'; The Town's ordinance PDFs are hosted on SharePoint behind a Microsoft login — all six 'Building Codes' page share links, plus a seventh on the Fee Schedules page, redirect to login.microsoftonline.com with no anonymous-view path. Use Municode's hosted Larkspur Municipal Code instead: it is the Town's official codified code, current through Supplement 15 (online content updated April 6, 2026). Chapter 18 — Building Regulations, Articles 1 through 11, all cite 'Ord. No. 2022-11' as their sole adopting/amending ordinance, with no later amending ordinance for any article except Article 4 (Fire Code, also amended by Ord. No. 2023-01, § 1, 2-16-2023). The codified text gives the exact adopted edition for every code family: International Building Code (Art. 1) — 2018 Edition, Ch. 1-35 + Appendix Chapters E, I, N; International Plumbing Code (Art. 2) — 2018 Edition, Ch. 1-13, Ch. 15, Appendix Chapters C, E; International Mechanical Code (Art. 3) — 2018 Edition, Ch. 1-15 + Appendix Chapter A; International Fire Code (Art. 4) — 2018 Edition, Ch. 1-80 + Appendix B-N; International Fuel Gas Code (Art. 5) — 2018 Edition, Ch. 1-8 + Appendix Chapters A-D; International Residential Code (Art. 6) — 2018 Edition, Ch. 1-44 + Appendix Chapters A, E, G, H, J; International Energy Conservation Code (Art. 7) — 2018 Edition, Ch. 1-6 + Appendix RA (IRC Ch. 11 Energy Efficiency is separately deleted and replaced with the 2018 IECC per IRC amendment #28); International Property Maintenance Code (Art. 8) — 2018 Edition, Ch. 1-8 + Appendix A; National Electrical Code (Art. 9) — 2020 Edition, adopted per Title 31, Article 16, Part 2, C.R.S., 'as adopted, amended and updated to the most current edition by the Colorado State Electrical Board from time to time' — i.e. it tracks DORA/State Electrical Board updates, consistent with the electrical-permit deferral noted elsewhere in this entry; International Existing Building Code (Art. 10) — 2018 Edition, Ch. 1-16; International Swimming Pool and Spa Code (Art. 11) — 2018 Edition, Ch. 1-11. Source: https://library.municode.com/co/larkspur/codes/municipal_code?nodeId=CH18BURE. The Town Council Meeting Minutes of 4-21-2022 (media ID 2246, hosted on townoflarkspur.org rather than SharePoint) record the adoption: 'Councilmember Mindy Kazurova made a motion to approve Ord..2022-11 an Ord. adopting by reference of the International Building Codes 2018 editions... Roll call vote Six (6) approved, zero (0) opposed, Mayor affirmed Motion Passed.'; Colorado is a home-rule state with no single statewide-mandated building code edition for municipalities generally; Larkspur, as a home-rule town, sets its own adopted code editions by ordinance (Ordinance 2022-11, 4-21-2022) rather than following a state-mandated cycle.; HB22-1362 (statewide energy code floor) does not impose a flat statewide deadline. Per its own trigger mechanism (as summarized by the Colorado Energy Office, AIA Colorado, and the Southwest Energy Efficiency Project), a jurisdiction is only required to adopt the 2021 IECC (or an equivalent/better code) when it next updates ANY of its other building codes, with a one-year transition window, and again by 7-1-2026 under the state's Model Low Energy and Carbon Code. Larkspur's only building-code action since HB22-1362's 2022 enactment is Ordinance 2022-11 itself (4-21-2022), which predates the bill and was not a post-enactment update; the Municode codification (Supplement 15, current through 4-6-2026) shows no ordinance amending Chapter 18 Article 7 (Energy Code) or any other Article after Ord. 2022-11 (except the unrelated Fire Code amendment, Ord. 2023-01). Because Larkspur has not updated any of its building codes since HB22-1362 took effect, its 2021-IECC trigger has not activated, and the Town's 2018 IECC (adopted via Ord. 2022-11) remains its lawfully current energy code. Source: https://library.municode.com/co/larkspur/codes/municipal_code?nodeId=CH18BURE_ART7INENCOCO; Electrical permits: Larkspur's own website hosts a PDF titled 'Electrical Permit Fees' at https://www.townoflarkspur.org/media/2901 which, on direct inspection, is the Colorado Department of Regulatory Agencies (DORA) / Division of Professions and Occupations statewide Electrical Permit Fee Schedule (effective April 1, 2016; document letterhead address 1560 Broadway, Suite 1350, Denver, CO 80202, phone 303-894-2300, www.dora.state.co.us) — i.e. Larkspur does not run its own local electrical permitting program or set its own electrical fee schedule; it defaults to the Colorado State Electrical Board (DORA/DPO) fee structure per CRS 12-23-117(3), consistent with this project's Colorado-specific default rule. Larkspur is documenting/republishing the state's fee form rather than issuing an independent municipal fee schedule. CONFIRMED 2026-07-23 on the live Municode codification: Larkspur Municipal Code Sec. 18-9-10 formally adopts the National Electrical Code, 2020 Edition, 'as adopted, amended and updated to the most current edition by the Colorado State Electrical Board from time to time' — the code text itself directs to the state board's current edition rather than fixing a static local edition, matching the DORA-deferral finding above.; Plumbing permits: the Town publishes no Larkspur-specific plumbing permit fee schedule and no locally-administered plumbing licensing or inspection program separate from the SAFEbuilt-administered Building Permit process. Plumbing review is folded into SAFEbuilt's general building-permit review — the 'PLUMBING ONLY' permit type appears on the Town's own permit-type list and is issued through the same SAFEbuilt/CommunityCore process as other trade permits, rather than being deferred to a state board the way electrical is. Larkspur Municipal Code Sec. 18-2-10 adopts the International Plumbing Code, 2018 Edition, and Sec. 18-2-40(2) (IPC § [A]106.6.2, Fee schedule) is locally amended to read 'The fees for work shall be as indicated on the Town's Fee Schedule adopted by the Town Council,' cross-referencing Appendix A—Fee Schedule, which in turn lists Sec. 18-2-40 at a flat $30.00 Town administrative fee 'plus fees outlined in Exhibit C "Town of Larkspur Fee Table" in the professional service agreement between the Town of Larkspur and Safebuilt Colorado.' That is why no itemized plumbing valuation-based fee table appears anywhere on the Town's own site: the dollar-amount schedule is Exhibit C of a private Town-SAFEbuilt services contract, not a document the Town routinely publishes. Budget the $30.00 Town administrative fee plus the SAFEbuilt Exhibit C amount, which you will need to get from the Town or SAFEbuilt directly. Source: https://library.municode.com/co/larkspur/codes/municipal_code?nodeId=APXA--FEE_SCHEDULE (Supp. 15, current through 4-6-2026).. Local amendments apply — see the Larkspur overview page for the full list.

    SAFEbuilt, under contract to the Town of Larkspur, provides building permit review and inspection services. Applications are submitted through SAFEbuilt's CommunityCore online portal, and the Town Clerk's office (townclerk@townoflarkspur.org, 303-681-2324) serves as the Town-side point of contact.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-07-23.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Larkspur building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Property Access

    Larkspur's permit history is searchable by address

    274 permits on record for Larkspur, 2016–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

    Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free