Rooftop Solar Photovoltaic (PV) Permit in Larkspur, Colorado

Required for solar photovoltaic system installations within Larkspur Town limits. Larkspur republishes the Colorado DORA (Division of Professions and Occupations) statewide Electrical Permit Fee Schedule as its own electrical fee document, and that same document explicitly states '(Solar Permits are on a Separate Form)' — meaning Larkspur, like its electrical-permit deferral generally, does not run its own local solar-PV permit/fee program and instead routes PV electrical permitting through the Colorado State Electrical Board. Any aggregate fee assessed is capped under Colorado's statewide solar-permit fee ceiling.

Verified 2026-07-20 · Source

When you need this permit

  • PV installation requires SAFEbuilt-administered building/structural permit review (racking, roof-mount/ground-mount structural scope) plus an electrical permit for the PV interconnection
  • Larkspur's own published Electrical Permit Fees document (a direct republication of the Colorado DORA/State Electrical Board statewide schedule) states on its face that solar permits are issued on a separate form from the general residential/commercial electrical fee tables, confirming PV electrical work is not priced off the standard square-footage or valuation tables on that document
  • Colorado's statewide solar-permit fee cap (C.R.S. § 24-48.5-113, enacted by HB21-1284, extended through 12-31-2029) caps the aggregate solar permit fee any Colorado local government (or the State Electrical Board acting for it) may charge at $500 for a residential system and $1,000 for a commercial system
  • Property must be confirmed within Larkspur Town limits (not unincorporated Douglas County) before applying

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Solar/Photovoltaic Permit (separate form, same underlying DORA valuation formula as the general Electrical Permit)Larkspur's own Electrical Permit Fees document (townoflarkspur.org/media/2901) is the DORA State Electrical Board's own statewide fee schedule (DORA address/phone printed on the document: 1560 Broadway Suite 1350, Denver, 303.894.2300), Section B "Commercial and other fees," which covers installations not based on square footage (garage, shop, etc.). Larkspur's document itself does not print the word "solar" inside Section B, but Larimer County's current equivalent table (Table 1-E, larimer.org/sites/default/files/2020_electrical_fee_table.pdf) explicitly lists "solar" among the Section-B/Item-B installations and states "Solar permit fees are capped by state law at $500 for residential installations and $1,000 for commercial installations" directly beneath the identical valuation formula — confirming solar permits (though submitted "on a Separate Form" per Larkspur's own document header) are priced via this same Section B formula statewide under C.R.S. § 12-23-117, not a undisclosed separate number. Re-fetched Larkspur's live document 2026-07-20 via direct PDF retrieval (previously blocked by a SharePoint-style access issue in the prior pass; resolved this pass).
Valuation-based: $100 base fee for job valuation up to $2,000, plus $10 per $1,000 (rounded up) of job valuation above $2,000 — e.g., a $5,150 job rounds to $6,000 and totals $100 + (6 x $10) = $160.00 — capped in aggregate at $500 (residential) / $1,000 (commercial) by Colorado's statewide C.R.S. § 24-48.5-113
Building Permit Fee (structural/racking scope, if a separate building-permit line applies)The Town's general 'Fee Estimate Table for Building Permits' is hosted behind a Microsoft SharePoint authentication wall that could not be accessed (see localAmendments); no dollar figure could be confirmed. Not further chased this pass since the electrical/solar-specific fee (which is what a rooftop-solar-pv-permit primarily consists of) is now verified above; a separate structural building-permit line, if SAFEbuilt requires one for the racking/mounting, remains unconfirmed.
Not independently verifiable

Review timeline

Plan review
Not published — contact the department

How long did your Rooftop Solar Photovoltaic (PV) Permit permit actually take in Larkspur?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover

  2. 2

    Final Inspection

    Racking, roof penetrations, and electrical connections verified; system energized

See the full Larkspur inspection guide — scheduling & re-inspection fees →

Tips

  • Larkspur's own Electrical Permit Fees document explicitly flags that solar permits use a separate form from the general residential/commercial electrical tables — don't try to compute a PV permit fee off the square-footage or valuation tables on that document.
  • Because Larkspur defers electrical permitting to the Colorado State Electrical Board (DORA/DPO) rather than running its own program, the actual PV permit is typically obtained through DORA's own online permitting system, not exclusively through SAFEbuilt's CommunityCore portal — confirm the current process with SAFEbuilt or Town Hall before applying.
  • Regardless of what fee is ultimately assessed, Colorado's statewide solar-permit fee cap (C.R.S. § 24-48.5-113, HB21-1284, extended through 12-31-2029) limits the total to $500 for a residential system or $1,000 for a commercial system.

Frequently asked questions

Larkspur requires a rooftop solar photovoltaic (pv) permit for: PV installation requires SAFEbuilt-administered building/structural permit review (racking, roof-mount/ground-mount structural scope) plus an electrical permit for the PV interconnection; Larkspur's own published Electrical Permit Fees document (a direct republication of the Colorado DORA/State Electrical Board statewide schedule) states on its face that solar permits are issued on a separate form from the general residential/commercial electrical fee tables, confirming PV electrical work is not priced off the standard square-footage or valuation tables on that document; Colorado's statewide solar-permit fee cap (C.R.S. § 24-48.5-113, enacted by HB21-1284, extended through 12-31-2029) caps the aggregate solar permit fee any Colorado local government (or the State Electrical Board acting for it) may charge at $500 for a residential system and $1,000 for a commercial system; Property must be confirmed within Larkspur Town limits (not unincorporated Douglas County) before applying. If your project isn't listed, confirm with Town of Larkspur Building Department (building official services contracted to SAFEbuilt) at (303) 681-2324 before starting work.

Yes. Colorado's statewide solar-permit fee cap (C.R.S. § 24-48.5-113, enacted by HB21-1284 and extended through 12-31-2029) limits the aggregate solar permit fee any Colorado local government may charge to $500 for a residential system and $1,000 for a commercial system, regardless of the jurisdiction's own valuation-based tables.

Larkspur does not publish a plan-review timeline for this permit. Contact Town of Larkspur Building Department (building official services contracted to SAFEbuilt) at (303) 681-2324 for current turnaround.

You'll need: Building Permit Application (structural/racking scope); Colorado DORA/State Electrical Board Solar (Photovoltaic) Permit Application. See the required-documents checklist on this page for details on each.

Larkspur requires 2 inspection(s) for a rooftop solar photovoltaic (pv) permit, in order: Rough Electrical, Final Inspection. Schedule each through Town of Larkspur Building Department (building official services contracted to SAFEbuilt) ((303) 681-2324).

Apply through Town of Larkspur Building Department (building official services contracted to SAFEbuilt) at 8720 Spruce Mountain Road, Larkspur, CO 80118. Phone: (303) 681-2324, email: townclerk@townoflarkspur.org. Office hours: Town Hall main line (303) 681-2324. Building permit review, plan review, and inspections are performed by SAFEbuilt under contract; SAFEbuilt building official contact Nick Chand, and SAFEbuilt inspection scheduling line (720) 641-1956. General 'Do I Need a Permit?' and building-code questions may be directed to SAFEbuilt's Tom Pitchford at (303) 941-4429. The Town Clerk (Todd DeVoe, townclerk@townoflarkspur.org) is listed as the Town-side building department contact of record alongside SAFEbuilt.. Official information: https://www.townoflarkspur.org/building-department.

Larkspur, Colorado has adopted: Town of Larkspur Ordinance 2022-11, Adopting Building Codes — the Town's Building Codes page (townoflarkspur.org/building-department/page/building-codes) names this ordinance as the governing building-code adoption instrument, alongside a companion document titled 'Building Codes at a Glance.'; CLOSED 2026-07-23 — Code-edition specificity, on a LIVE primary source: the SharePoint-hosted ordinance PDF remains behind a confirmed Microsoft OAuth authentication wall (re-tested 2026-07-23: all six 'Building Codes' page SharePoint share links, plus a seventh on the Fee Schedules page, still redirect straight to login.microsoftonline.com with no anonymous-view path — genuine, re-confirmed barrier). However, a NEW avenue closed the gap on a different live channel: Municode's hosted Larkspur Municipal Code (library.municode.com/co/larkspur), which the prior pass could not load (401/403 via curl against its Angular API), loads successfully in a real browser session and is the Town's official codified code, current through Supplement 15 (online content updated April 6, 2026). Chapter 18 — Building Regulations, Articles 1 through 11, all cite 'Ord. No. 2022-11' as their sole adopting/amending ordinance with no later amending ordinance for any article except Article 4 (Fire Code, also amended by Ord. No. 2023-01, § 1, 2-16-2023). The codified text gives the exact adopted edition for every code family: International Building Code (Art. 1) — 2018 Edition, Ch. 1-35 + Appendix Chapters E, I, N; International Plumbing Code (Art. 2) — 2018 Edition, Ch. 1-13, Ch. 15, Appendix Chapters C, E; International Mechanical Code (Art. 3) — 2018 Edition, Ch. 1-15 + Appendix Chapter A; International Fire Code (Art. 4) — 2018 Edition, Ch. 1-80 + Appendix B-N; International Fuel Gas Code (Art. 5) — 2018 Edition, Ch. 1-8 + Appendix Chapters A-D; International Residential Code (Art. 6) — 2018 Edition, Ch. 1-44 + Appendix Chapters A, E, G, H, J; International Energy Conservation Code (Art. 7) — 2018 Edition, Ch. 1-6 + Appendix RA (IRC Ch. 11 Energy Efficiency is separately deleted and replaced with the 2018 IECC per IRC amendment #28); International Property Maintenance Code (Art. 8) — 2018 Edition, Ch. 1-8 + Appendix A; National Electrical Code (Art. 9) — 2020 Edition (adopted per Title 31, Article 16, Part 2, C.R.S., 'as adopted, amended and updated to the most current edition by the Colorado State Electrical Board from time to time' — i.e. tracks DORA/State Electrical Board updates, consistent with this file's electrical-permit deferral finding); International Existing Building Code (Art. 10) — 2018 Edition, Ch. 1-16; International Swimming Pool and Spa Code (Art. 11) — 2018 Edition, Ch. 1-11. Source: https://library.municode.com/co/larkspur/codes/municipal_code?nodeId=CH18BURE (live, current version). Cross-verified against the Town's own Town Council Meeting Minutes of 4-21-2022 (media ID 2246, hosted directly on townoflarkspur.org, not SharePoint): 'Councilmember Mindy Kazurova made a motion to approve Ord..2022-11 an Ord. adopting by reference of the International Building Codes 2018 editions... Roll call vote Six (6) approved, zero (0) opposed, Mayor affirmed Motion Passed.'; Colorado is a home-rule state with no single statewide-mandated building code edition for municipalities generally; Larkspur, as a home-rule town, sets its own adopted code editions by ordinance (Ordinance 2022-11, 4-21-2022) rather than following a state-mandated cycle.; CLOSED 2026-07-23 — HB22-1362 (statewide energy code floor) applicability, on LIVE sources: HB22-1362 does not impose a flat statewide deadline; per its own trigger mechanism (confirmed via Colorado Energy Office / AIA Colorado / Southwest Energy Efficiency Project reporting), a jurisdiction is only required to adopt the 2021 IECC (or an equivalent/better code) when it next updates ANY of its other building codes, with a one-year transition window, and again by 7-1-2026 under the state's Model Low Energy and Carbon Code. Larkspur's only building-code action since HB22-1362's 2022 enactment is Ordinance 2022-11 itself (4-21-2022), which predates the bill and was not a post-enactment update; the live Municode codification (Supplement 15, current through 4-6-2026) shows no ordinance amending Chapter 18 Article 7 (Energy Code) or any other Article after Ord. 2022-11 (except the unrelated Fire Code amendment, Ord. 2023-01). Because Larkspur has not updated any of its building codes since HB22-1362 took effect, its 2021-IECC trigger has not yet activated, and the Town's 2018 IECC (adopted via Ord. 2022-11) remains its lawfully current energy code as of this research date. Source: https://library.municode.com/co/larkspur/codes/municipal_code?nodeId=CH18BURE_ART7INENCOCO (live).; Electrical permits: Larkspur's own website hosts a PDF titled 'Electrical Permit Fees' at https://www.townoflarkspur.org/media/2901 which, on direct inspection, is the Colorado Department of Regulatory Agencies (DORA) / Division of Professions and Occupations statewide Electrical Permit Fee Schedule (effective April 1, 2016; document letterhead address 1560 Broadway, Suite 1350, Denver, CO 80202, phone 303-894-2300, www.dora.state.co.us) — i.e. Larkspur does not run its own local electrical permitting program or set its own electrical fee schedule; it defaults to the Colorado State Electrical Board (DORA/DPO) fee structure per CRS 12-23-117(3), consistent with this project's Colorado-specific default rule. Larkspur is documenting/republishing the state's fee form rather than issuing an independent municipal fee schedule. CONFIRMED 2026-07-23 on the live Municode codification: Larkspur Municipal Code Sec. 18-9-10 formally adopts the National Electrical Code, 2020 Edition, 'as adopted, amended and updated to the most current edition by the Colorado State Electrical Board from time to time' — the code text itself directs to the state board's current edition rather than fixing a static local edition, matching the DORA-deferral finding above.; Plumbing permits: no evidence was found of a Larkspur-specific plumbing permit fee schedule or a locally-administered plumbing licensing/inspection program distinct from the general SAFEbuilt-administered Building Permit process; plumbing permit review appears to be folded into SAFEbuilt's general building-permit review (the 'PLUMBING ONLY' permit type appears on the Town's own permit-type list, issued through the same SAFEbuilt/CommunityCore process as other trade permits, not a standalone state-board deferral the way electrical is). Documented honestly as SAFEbuilt-administered under the general building permit umbrella rather than assumed to default to the Colorado State Plumbing Board absent direct confirmation of that specific deferral. PARTIALLY CLOSED 2026-07-23: the live Municode codification confirms this — Larkspur Municipal Code Sec. 18-2-10 adopts the International Plumbing Code, 2018 Edition, and Sec. 18-2-40(2) (IPC § [A]106.6.2, Fee schedule) is locally amended to read 'The fees for work shall be as indicated on the Town's Fee Schedule adopted by the Town Council,' cross-referencing Appendix A—Fee Schedule, which in turn lists Sec. 18-2-40 at a flat $30.00 Town administrative fee 'plus fees outlined in Exhibit C "Town of Larkspur Fee Table" in the professional service agreement between the Town of Larkspur and Safebuilt Colorado.' This explains, on a live authoritative source, why no itemized plumbing valuation-based fee table is published anywhere on the Town's own site: the actual dollar-amount schedule is Exhibit C of a private Town-SAFEbuilt services contract, not a document the Town routinely publishes — a structurally different (and confirmed-genuine) reason than the earlier SharePoint access-wall hypothesis, not merely an unresolved access barrier. The $30.00 base administrative fee is now a verified, live-sourced figure; the underlying SAFEbuilt Exhibit C valuation table remains unrecoverable through any public channel located in this pass. Source: https://library.municode.com/co/larkspur/codes/municipal_code?nodeId=APXA--FEE_SCHEDULE (live, Supp. 15, current through 4-6-2026).. Local amendments apply — see the Larkspur overview page for the full list.