Skip to main content
PermitBase

Fire Sprinkler / Fire Alarm System Permit in Lone Tree, Colorado

Fire protection and emergency medical services for Lone Tree are provided by South Metro Fire Rescue (SMFR), the same district that serves Littleton. SMFR's Development & Construction Section publishes an itemized 'Systems and Other Fees' schedule (effective January 1, 2026) covering fire sprinkler and fire alarm system work: NFPA 13 sprinkler system modification of ≤50 heads ($344.57 total), 51-300 heads ($414.31), >300 heads ($843.98); Fire Alarm System Modification Base Fee ($461.12, plus $6.12 per additional device); Fire Alarm Control Panel Replacement ($651.92). Over-the-counter same-day review is available for smaller alteration projects (sprinkler ≤50 heads, alarm device changes within specified thresholds) submitted by 11:00 a.m.

Verified 2026-08-14 · Source

When you need this permit

  • Plans submitted via SMFR's Accela Permit Portal; over-the-counter review available for alterations to existing wet-pipe fire sprinkler systems (light/ordinary hazard, up to 50 sprinkler heads, no hydraulic design impact) and fire alarm alterations (substitution/relocation of up to 25 devices or addition of up to 10 new devices), if submitted by 11:00 a.m.
  • New fire sprinkler and fire alarm systems installed as part of new construction or tenant improvements are billed on SMFR's IBC-occupancy-classification-based fee table (base cost + cost per additional 100 sq ft), not the flat modification fees
  • All SMFR-issued permits and approved plans must remain on-site for the duration of the project; inspections will not be performed without them, and re-inspection fees may apply

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

NFPA 13 Sprinkler System Modification — ≤50 Sprinkler HeadsSMFR Systems and Other Fees, effective 1/1/2026
$344.57 total ($104.61 plan check + $239.96 inspection)
NFPA 13 Sprinkler System Modification — 51-300 Sprinkler HeadsSMFR Systems and Other Fees, effective 1/1/2026
$414.31 total ($174.35 plan check + $239.96 inspection)
NFPA 13 Sprinkler System Modification — >300 Sprinkler HeadsSMFR Systems and Other Fees, effective 1/1/2026
$843.98 total ($244.07 plan check + $599.91 inspection)
Fire Alarm System Modification Base FeeSMFR Systems and Other Fees, effective 1/1/2026
$461.12 total, plus $6.12 per additional device
Fire Alarm Control Panel ReplacementSMFR Systems and Other Fees, effective 1/1/2026
$651.92 total, plus $6.12 per additional device
Change of Use (fire review)SMFR Systems and Other Fees, effective 1/1/2026 — a fire-code compliance review fee, separate from any City of Lone Tree building/zoning change-of-use process
$587.99 total ($174.24 plan check + $413.75 inspection)
Re-Inspection Fee / Release of Stop Work OrderSMFR Systems and Other Fees, effective 1/1/2026
$284.63

Review timeline

Plan reviewLone Tree’s published plan-review target
Up to 1 business days

How long did your Fire Sprinkler / Fire Alarm System Permit permit actually take in Lone Tree?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Lone Tree inspection guide — scheduling & re-inspection fees →

    Tips

    • South Metro Fire Rescue serves both Lone Tree and Littleton under the same fee schedule and process — the same Accela portal, the same tiered sprinkler-modification fees, and the same over-the-counter same-day review eligibility thresholds apply in both cities.

    Frequently asked questions

    Lone Tree requires a fire sprinkler / fire alarm system permit for: Plans submitted via SMFR's Accela Permit Portal; over-the-counter review available for alterations to existing wet-pipe fire sprinkler systems (light/ordinary hazard, up to 50 sprinkler heads, no hydraulic design impact) and fire alarm alterations (substitution/relocation of up to 25 devices or addition of up to 10 new devices), if submitted by 11:00 a.m.; New fire sprinkler and fire alarm systems installed as part of new construction or tenant improvements are billed on SMFR's IBC-occupancy-classification-based fee table (base cost + cost per additional 100 sq ft), not the flat modification fees; All SMFR-issued permits and approved plans must remain on-site for the duration of the project; inspections will not be performed without them, and re-inspection fees may apply. If your project isn't listed, confirm with City of Lone Tree Community Development Department, Building Division at 720-390-5211 before starting work.

    In Lone Tree, the published NFPA 13 Sprinkler System Modification — ≤50 Sprinkler Heads is: $344.57 total ($104.61 plan check + $239.96 inspection). Additional published fees: NFPA 13 Sprinkler System Modification — 51-300 Sprinkler Heads — $414.31 total ($174.35 plan check + $239.96 inspection); NFPA 13 Sprinkler System Modification — >300 Sprinkler Heads — $843.98 total ($244.07 plan check + $599.91 inspection); Fire Alarm System Modification Base Fee — $461.12 total, plus $6.12 per additional device; Fire Alarm Control Panel Replacement — $651.92 total, plus $6.12 per additional device; Change of Use (fire review) — $587.99 total ($174.24 plan check + $413.75 inspection); Re-Inspection Fee / Release of Stop Work Order — $284.63. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Lone Tree's published plan-review target for a fire sprinkler / fire alarm system permit is Up to 1 business days.

    You'll need: SMFR Fire Protection System Permit Application (via Accela Permit Portal). See the required-documents checklist on this page for details on each.

    Apply through City of Lone Tree Community Development Department, Building Division at 9220 Kimmer Dr., Suite 100, Lone Tree, CO 80124. Phone: 720-390-5211, email: building@cityoflonetree.com. Office hours: 7:00 AM - 4:00 PM, Monday-Friday, excluding holidays/weekends. Chief Building Official: Matt Archer. Community Development Director: Kelly First (kelly.first@cityoflonetree.com, 720-509-1274). General city line: 303-708-1818.. Official information: https://cityoflonetree.com/community-development/building/.

    Lone Tree, Colorado has adopted: 2021 International Building Code (IBC), as amended — City of Lone Tree Design Criteria & Codes page; 2021 International Residential Code (IRC), as amended; 2021 International Fire Code (IFC); 2021 International Plumbing Code (IPC); 2021 International Mechanical Code (IMC); 2021 International Fuel Gas Code (IFGC); 2021 International Energy Conservation Code (IECC); 2023 National Electrical Code (NEC); 2017 ICC A117.1 Accessibility Code; Note on Chapter 18 (Building Regulations), Lone Tree Municipal Code: search-indexed content confirms the City has adopted the International Building Code, 2021 Edition, as amended, with a certified copy on file with the City Clerk; a local amendment adds Section 105.3.8 'Soils Test,' requiring a soils test prepared by a Colorado-registered professional engineer at building permit application, with an engineering geologist additionally required for hillside/geological-hazard/steep-slope sites at the Building Official's discretion. Full text of Chapter 18 could not be independently re-verified beyond this indexed excerpt because library.municode.com/co/lone_tree serves an Angular single-page app shell (empty of code text without JS rendering) and returned HTTP 403 to both a standard fetch and a full-browser-header curl retry — this is a partial-confidence caveat on the amendment-detail level only, not on the base code-edition list, which is independently confirmed on the City's own actively-maintained Design Criteria & Codes page.; HB22-1362 statewide energy floor (Colorado): as of 2026-07-06 (this review date), HB22-1362 requires that municipalities/counties updating their building code adopt an energy code achieving equivalent-or-better performance than the 2021 IECC + Model Electric and Solar Ready Code (effective window 7/1/2023-6/30/2026), stepping up to the Colorado Energy Code Board's Model Low Energy and Carbon Code (published 9/2/2025) as the new statewide minimum for any code update on or after 7/1/2026. Lone Tree's currently-published adopted energy code is the 2021 IECC (per its own Design Criteria & Codes page, most recent update not dated on-page) — this predates the 7/1/2026 Model Low Energy and Carbon Code trigger point and does not itself violate HB22-1362, since that stricter floor applies only when a jurisdiction next updates its code. Flagged honestly rather than assumed; confirm current status with the Building Division (720-390-5211) before relying on this for a 2026-cycle project, since Lone Tree could adopt updated codes at any time.. Local amendments apply — see the Lone Tree overview page for the full list.

    South Metro Fire Rescue (SMFR), which provides fire protection and EMS for Lone Tree. Sprinkler system modification fees range from $344.57 (up to 50 heads) to $843.98 (over 300 heads), and fire alarm modifications start at a $461.12 base fee plus $6.12 per device, per SMFR's Systems and Other Fees schedule effective 1/1/2026.

    Sources & verification

    Verified against official sources. Last reviewed 2026-08-14.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lone Tree building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.