Solar Electric / Solar Thermal Device Permit — Lone Tree, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://cityoflonetree.com/wp-content/uploads/2025/12/6.-Building-Fees-2026.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Electric / Solar Thermal Device Permit in Lone Tree, Colorado
Required for solar photovoltaic and solar thermal device installations in Lone Tree. Billed as a flat fee under the 2026 Building Division fee schedule, distinct from the valuation-based Building/Mechanical/Electrical/Plumbing table. Douglas County Use Tax is explicitly waived on photovoltaic systems.
Verified 2026-07-06 · Source
When you need this permit
- Billed as a flat fee, not the valuation-based Building Permit Fee table used for other trades
- Electrical connection work governed by the 2023 NEC as adopted
- Douglas County Use Tax not collected on photovoltaic systems
- Roof-mounted systems on a re-roof-eligible roof are still subject to the City's roofing material and inspection requirements where applicable
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover
- 2
Final Inspection
Racking, roof penetrations, and electrical connections verified
See the full Lone Tree inspection guide — scheduling & re-inspection fees →
Tips
- Solar is billed as a flat $480 fee in Lone Tree, unlike the valuation-based tables used for most other trade permits — budget accordingly regardless of system size or installed cost.
- Confirm with the Building Division whether your specific solar installation additionally requires a structural/roofing review if it involves roof penetrations on an aging roof, since the Roofing Guidelines' material and inspection requirements can still apply.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lone Tree building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lone Tree
Solar Electric / Solar Thermal Device Permit in other cities
Compare solar electric / solar thermal device permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Lone Tree project checklist
Describe your project once and get every permit, document, and fee it triggers in Lone Tree — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →