Skip to main content
PermitBase

Commercial Tenant Improvement Permit in Lone Tree, Colorado

The City of Lone Tree does not publish a dedicated Tenant Improvement (TI) permit page or process summary distinct from its general commercial Building Permit. A commercial TI project would be filed as a standard Building Permit application through the Accela portal, subject to the 2021 IBC as adopted and the same shared valuation-based fee table used for all occupancies. RE-CHASED and RE-CONFIRMED live on 2026-07-23 (direct re-fetch of the Permits and Applications page and a sitewide search of cityoflonetree.com for 'tenant improvement'/'submittal checklist', both returning no dedicated TI page, form, or checklist) — this is a confirmed absence on a live primary source, not an unresolved gap.

Verified 2026-07-23 · Source

When you need this permit

  • No standalone TI permit type, application form, or process page could be located on the City's Building, Permits-and-Applications, or Licenses pages — modeled here as a scoped application of the general commercial Building Permit
  • RE-CHASED 2026-07-23: re-fetched the live Permits and Applications page directly and confirmed its 'Land Use & Development Applications' section (the City's own categorized list of non-Building Division application types) lists only 'Site Improvement Plans, subdivisions, rezonings, among other applications' — no 'Tenant Improvement' category is named. Also re-confirmed via the live Building Division FAQ that a zoning verification letter is 'strongly encouraged' before a business applies for a building permit, to confirm the space is zoned for the proposed business use — this pre-permit zoning check is the closest thing to a distinct TI-intake step the City publishes, and it is not itself a separate permit type
  • Governed by the 2021 IBC as adopted, plus applicable fire and accessibility code requirements (2021 IFC, 2017 ICC A117.1)
  • A Business License (or Retail Sales & Use Tax License) is required for the tenant/business operating in the space, separate from the construction permit itself

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building/Mechanical/Electrical/Plumbing Permit Fee (same shared valuation-based schedule 'for All Occupancies')2026 Building Division Fee Schedule explicitly covers 'All Occupancies' under one table, including commercial
$23.50 minimum, scaling per the valuation tiers in the 2026 Building Fees schedule
Plan Review Fee
65% of Permit Fee, minimum $100.00
City Use Tax
2.5% of construction materials value

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement Permit permit actually take in Lone Tree?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment, scoped to the TI work

  2. 2

    Final Inspection

    All work complete per approved plans; Certificate of Occupancy review as applicable

See the full Lone Tree inspection guide — scheduling & re-inspection fees →

Tips

  • Since Lone Tree publishes a single 'All Occupancies' fee table, commercial tenant improvement fees use the identical valuation-based schedule as residential work — do not expect a separate commercial-specific rate table.
  • Confirm with the Community Development Department (720-509-1274) whether your specific tenant space and use require additional Site Improvement Plan review, since the City's Land Use & Development Applications process is separate from the Building Division's construction-permit review.
  • Before applying for a TI building permit, the City's own Building Division FAQ strongly encourages requesting a zoning verification letter to confirm the space is zoned for your proposed business use (e.g. a restaurant) — zoning compliance is a precondition for building and sign permit issuance, and non-compliant sites may see permits delayed or denied.

Frequently asked questions

Lone Tree requires a commercial tenant improvement permit for: No standalone TI permit type, application form, or process page could be located on the City's Building, Permits-and-Applications, or Licenses pages — modeled here as a scoped application of the general commercial Building Permit; RE-CHASED 2026-07-23: re-fetched the live Permits and Applications page directly and confirmed its 'Land Use & Development Applications' section (the City's own categorized list of non-Building Division application types) lists only 'Site Improvement Plans, subdivisions, rezonings, among other applications' — no 'Tenant Improvement' category is named. Also re-confirmed via the live Building Division FAQ that a zoning verification letter is 'strongly encouraged' before a business applies for a building permit, to confirm the space is zoned for the proposed business use — this pre-permit zoning check is the closest thing to a distinct TI-intake step the City publishes, and it is not itself a separate permit type; Governed by the 2021 IBC as adopted, plus applicable fire and accessibility code requirements (2021 IFC, 2017 ICC A117.1); A Business License (or Retail Sales & Use Tax License) is required for the tenant/business operating in the space, separate from the construction permit itself. If your project isn't listed, confirm with City of Lone Tree Community Development Department, Building Division at 720-390-5211 before starting work.

In Lone Tree, the published Building/Mechanical/Electrical/Plumbing Permit Fee (same shared valuation-based schedule 'for All Occupancies') is: $23.50 minimum, scaling per the valuation tiers in the 2026 Building Fees schedule. Additional published fees: Plan Review Fee — 65% of Permit Fee, minimum $100.00; City Use Tax — 2.5% of construction materials value. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Lone Tree does not publish a plan-review timeline for this permit. Contact City of Lone Tree Community Development Department, Building Division at 720-390-5211 for current turnaround.

You'll need: Building Permit Application (Commercial/TI scope); Business License Application. See the required-documents checklist on this page for details on each.

Lone Tree requires 2 inspection(s) for a commercial tenant improvement permit, in order: Rough Electrical / Plumbing / Mechanical, Final Inspection. Schedule each through City of Lone Tree Community Development Department, Building Division (720-390-5211).

Apply through City of Lone Tree Community Development Department, Building Division at 9220 Kimmer Dr., Suite 100, Lone Tree, CO 80124. Phone: 720-390-5211, email: building@cityoflonetree.com. Office hours: 7:00 AM - 4:00 PM, Monday-Friday, excluding holidays/weekends. Chief Building Official: Matt Archer. Community Development Director: Kelly First (kelly.first@cityoflonetree.com, 720-509-1274). General city line: 303-708-1818.. Official information: https://cityoflonetree.com/community-development/building/.

Lone Tree, Colorado has adopted: 2021 International Building Code (IBC), as amended — City of Lone Tree Design Criteria & Codes page; 2021 International Residential Code (IRC), as amended; 2021 International Fire Code (IFC); 2021 International Plumbing Code (IPC); 2021 International Mechanical Code (IMC); 2021 International Fuel Gas Code (IFGC); 2021 International Energy Conservation Code (IECC); 2023 National Electrical Code (NEC); 2017 ICC A117.1 Accessibility Code; Note on Chapter 18 (Building Regulations), Lone Tree Municipal Code: search-indexed content confirms the City has adopted the International Building Code, 2021 Edition, as amended, with a certified copy on file with the City Clerk; a local amendment adds Section 105.3.8 'Soils Test,' requiring a soils test prepared by a Colorado-registered professional engineer at building permit application, with an engineering geologist additionally required for hillside/geological-hazard/steep-slope sites at the Building Official's discretion. Full text of Chapter 18 could not be independently re-verified beyond this indexed excerpt because library.municode.com/co/lone_tree serves an Angular single-page app shell (empty of code text without JS rendering) and returned HTTP 403 to both a standard fetch and a full-browser-header curl retry — this is a partial-confidence caveat on the amendment-detail level only, not on the base code-edition list, which is independently confirmed on the City's own actively-maintained Design Criteria & Codes page.; HB22-1362 statewide energy floor (Colorado): as of 2026-07-06 (this review date), HB22-1362 requires that municipalities/counties updating their building code adopt an energy code achieving equivalent-or-better performance than the 2021 IECC + Model Electric and Solar Ready Code (effective window 7/1/2023-6/30/2026), stepping up to the Colorado Energy Code Board's Model Low Energy and Carbon Code (published 9/2/2025) as the new statewide minimum for any code update on or after 7/1/2026. Lone Tree's currently-published adopted energy code is the 2021 IECC (per its own Design Criteria & Codes page, most recent update not dated on-page) — this predates the 7/1/2026 Model Low Energy and Carbon Code trigger point and does not itself violate HB22-1362, since that stricter floor applies only when a jurisdiction next updates its code. Flagged honestly rather than assumed; confirm current status with the Building Division (720-390-5211) before relying on this for a 2026-cycle project, since Lone Tree could adopt updated codes at any time.. Local amendments apply — see the Lone Tree overview page for the full list.

No. Re-confirmed live 2026-07-23: the City does not publish a dedicated TI permit page, application form, or submittal checklist. Tenant improvement work is filed as a standard commercial Building Permit application through the Accela portal, billed under the same 'All Occupancies' fee table used for all other building permits. The City does recommend requesting a zoning verification letter before applying, to confirm the space is zoned for the proposed business use.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lone Tree building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Lone Tree.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.