Residential Addition / Interior Remodel Permit in Vail, Colorado
Required for additions and interior remodels to existing single-family, duplex, and townhome structures in Vail. Reviewed under the 2024 IRC as locally adopted; scope and required documents differ meaningfully between an Addition and an Interior Remodel per the Town's own submittal matrix.
Verified 2026-07-06 · Source
When you need this permit
- DRB approval required before building permit submittal if the project includes any exterior changes
- Additions require: title page/code analysis, energy code compliance, survey/site plan, civil plan, soils report (open-hole report at excavation), foundation plan(s), structural calculations, floor/framing/roof plans, elevations, cross sections/details, schedules, electrical/mechanical/plumbing plans, statement of special inspection
- Interior Remodels require a narrower document set: title page/code analysis, energy code compliance, floor plan(s), framing plan(s), structural calculations (only if walls are to be removed), electrical/mechanical/plumbing plans, statement of special inspection; survey/site plan, civil plan, soils report, and foundation plans are NOT required unless the scope triggers them
- A Licensed Engineer report is required if any walls are proposed for removal, to determine if they are structural
- Asbestos test report required at submittal for all projects, including shower/bath enclosures with new tile
- All contractors must hold a current Town of Vail Contractor Registration Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (additions with new footings only)
Before concrete pour, per 48-inch minimum frost depth
- 2
Rough Frame
Framing complete, connection to existing structure verified
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans
See the full Vail inspection guide — scheduling & re-inspection fees →
Tips
- Vail's submittal matrix clearly distinguishes Addition (full document set, similar to new construction) from Interior Remodel (a lighter document set) — check which column applies to your project before assembling your plan set to avoid over- or under-submitting.
- Recreation Fees apply only to NEW square footage — a like-for-like interior remodel that adds no floor area should not be billed this fee, but any addition that does add floor area will be.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Vail building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Vail
Residential Addition / Interior Remodel Permit in other cities
Compare residential addition / interior remodel permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Vail project checklist
Describe your project once and get every permit, document, and fee it triggers in Vail — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →