Roofing Permit (Re-Roof) in Vail, Colorado

Required for re-roofing work in the Town of Vail. Single Family/Duplex re-roofs are eligible for the Town's 'Expedited Permit' track (combined DRB + Building Permit process). Governed by the 2024 IRC/IBC as adopted, with Class A material and 100% ice barrier underlayment requirements per the Town's Design Criteria.

Verified 2026-07-06 · Source

When you need this permit

  • Single Family/Duplex re-roofs qualify for the Expedited Permit track, which combines DRB and Building Permit approval into one process — all submittal requirements are due at time of application to use this track
  • DRB approval is still required before starting the permit process even under the expedited track, since re-roofing is exterior work
  • Per the Town's Design Criteria chart, ice barrier underlayment is required at 100% (not a minimum-elevation trigger)
  • Per the Residential/Commercial Minimum Project Submittal Requirements packets, a Re-Roof submittal requires: roof plan(s), and schedules showing Class A material, underlayment, valleys, and material — but does NOT require title page/code analysis, energy code compliance (only if no existing insulation), survey/site plan, civil plan, soils report, foundation plans, structural calculations, floor/framing plans, elevations, cross sections, electrical/mechanical/plumbing plans, or statement of special inspection

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, same schedule as new construction)No separate flat re-roof fee is published; billed under the general valuation-based Building Permit Fee schedule
$50.00 minimum, scaling per the valuation tiers in the 2026 Schedule of Permit Fees
Building Plan Review Fee
65% of Permit Fee
Construction Use Tax
(Valuation minus $10,000) / 2, multiplied by 4% (no tax if valuation under $10,000)

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof) permit actually take in Vail?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (roof)

    Completed roof — Class A material, ice barrier underlayment, and flashing/valley compliance verified

See the full Vail inspection guide — scheduling & re-inspection fees →

Tips

  • Single Family/Duplex re-roofs get a streamlined 'Expedited Permit' combining DRB and Building Permit review into one process, but DRB approval is still a hard prerequisite since roofing is exterior work — don't skip that step assuming 'expedited' means no design review.
  • Vail requires 100% ice barrier underlayment coverage (not a minimum-elevation carve-out) — confirm your roofer is pricing full coverage, not a partial-elevation product.
  • The re-roof submittal packet is much lighter than new construction (no survey, foundation, or structural documents needed) — don't over-prepare a full plan set if your scope is a straightforward re-roof.

Frequently asked questions

Yes. Even though Single Family/Duplex re-roofs qualify for the Town's Expedited Permit track (combining DRB and Building Permit approval), DRB approval is still required before the permit process starts because re-roofing is exterior work.

In Vail, the published Building Permit Fee (valuation-based, same schedule as new construction) is: $50.00 minimum, scaling per the valuation tiers in the 2026 Schedule of Permit Fees. Additional published fees: Building Plan Review Fee — 65% of Permit Fee; Construction Use Tax — (Valuation minus $10,000) / 2, multiplied by 4% (no tax if valuation under $10,000). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Vail does not publish a plan-review timeline for this permit. Contact Town of Vail Community Development Department, Building Division at 970-479-2139 for current turnaround.

You'll need: Construction Permit Application (Building, Plumbing & Mechanical) — Re-Roof scope; Roof Plan(s) and Material Schedule. See the required-documents checklist on this page for details on each.

Vail requires 1 inspection(s) for a roofing permit (re-roof), in order: Final Inspection (roof). Schedule each through Town of Vail Community Development Department, Building Division (970-479-2139).

Apply through Town of Vail Community Development Department, Building Division at 75 S. Frontage Road West, Vail, CO 81657. Phone: 970-479-2139, email: info@vail.gov. Office hours: Town of Vail main line 970-479-2100; Building Department direct line 970-479-2139; Chief Building Official emergency line 970-479-2143. Combination Inspector direct lines also published: Mike Horning (970) 479-2253, Jeff Lake (970) 479-2142.. Official information: https://www.vail.gov/government/departments/community-development/building-department.

Vail, Colorado has adopted: 2024 International Building Code (IBC) — Town of Vail Building Department page (Adopted Building Codes list); 2024 International Residential Code (IRC); 2024 International Fire Code (IFC); 2024 International Plumbing Code (IPC); 2024 International Mechanical Code (IMC); 2024 International Fuel Gas Code (IFGC); 2024 International Energy Conservation Code (IECC); 2024 International Existing Building Code (IEBC); 2023 National Electrical Code (NEC); Note on document currency: the Town's downloadable 'Minimum Project Submittal Requirements' packets (Residential and Commercial/Multi-Family, both undated on-page) still footer-reference the prior code cycle ('The current adopted codes in the Town of Vail are 2021 IBC, IRC, IMC, IPC, IFGC, IECC, IEBC, IFC, and 2020 NEC, as amended') — the live Building Department webpage's 2024 IBC/IRC/IFC/IPC/IMC/IFGC/IECC/IEBC + 2023 NEC list is treated as the current, governing adopted-code list for this file since it is the department's actively maintained code-adoption page, not a static PDF handout.. Local amendments apply — see the Vail overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Vail building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.