Skip to main content
PermitBase

Commercial Remodel / Tenant Improvement / Addition Permit in Vail, Colorado

Required for tenant improvements (interior build-out of existing commercial space), commercial remodels, and commercial additions in the Town of Vail. The Town's own Minimum Project Submittal Requirements — Commercial and Multi-Family packet bundles these three scopes ('Commercial Remodel/TI/Addition') into a single document-requirement column, distinct from New Commercial/Multi-Family construction; the Title Page/Code Analysis instructions explicitly list 'Alteration/Renovation/Tenant Improvement' as one of three recognized 'type of work' designations alongside New Building and Building Addition. Applied for under the same combined Construction Permit application used for all Building/Plumbing/Mechanical work. Reviewed under the 2024 IBC as adopted.

Reviewed 2026-08-02 · Source

When you need this permit

  • Design Review Board (DRB) approval required before building permit submittal ONLY if the project includes exterior changes — the Commercial packet lists Elevations as 'Only if exterior changes' for this scope, unlike New Commercial/Multi-Family construction which always requires them
  • Per the Commercial/Multi-Family Minimum Project Submittal Requirements matrix (Commercial Remodel/TI/Addition column): Title Page/Code Analysis, Survey/Site Plan, Civil Plan, Structural Calculations, Floor Plan(s), Framing Plan(s), Reflected Ceiling Plan(s), Cross Sections/Details, Schedules, Electrical/Mechanical/Plumbing Plan(s), Statement of Special Inspection, and Energy Code Compliance Details are required
  • Soils Report and Foundation Plan(s) are required only 'if addition' (open-hole report at excavation for soils); Roof Plan(s) required only 'if addition'; Elevations required only if the project includes exterior changes — a pure interior tenant improvement with no addition and no exterior changes does not trigger these four items
  • EXCEPTION: tenant finishes and remodels that do NOT affect fire-resistive rated construction, structural items, means-of-egress components, plumbing systems, and/or electrical systems are NOT required to have stamped professional drawings (all other commercial/multi-family work requires drawings stamped, signed, and dated by a Colorado-licensed design professional)
  • A Licensed Engineer report is required if any walls are proposed for removal, to determine if they are structural
  • Asbestos test report by a registered Colorado Asbestos inspector required at submittal for all projects, per State of Colorado asbestos regulations
  • Statement of Special Inspection required per IBC Chapter 17, performed by a Town of Vail-approved 3rd-party Special Inspector
  • All contractors must hold a current Town of Vail Contractor Registration in addition to any required Colorado state trade license Contractor
  • Minimum 2 paper plan sets if submitting paper (11x17 minimum, 24x36 recommended); electronic plan sets uploaded to ProjectDox after a completeness review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (same shared valuation-based schedule used for Building/Plumbing/Mechanical on all project types)2026 Schedule of Permit Fees, Town of Vail — identical fee table to residential and new commercial construction; verified directly from the fee-schedule PDF
$50.00 minimum for $1-$500 valuation, scaling through $6,120.25 for the first $1,000,000 plus $4.00/$1,000 thereafter for $1,000,001+
Building Plan Review FeeDue at submittal
65% of Building Permit Fee
Construction Use TaxNo use tax if total valuation is under $10,000.00
(Valuation minus $10,000) / 2, multiplied by 4%
Recreation Fee — commercial core/mixed-use zone districtsApplies only if the TI/remodel/addition adds new floor area; a pure interior tenant improvement that adds no square footage is not billed this fee, per the Town's fee-calculation instructions ('building permits adding new square footage only')
$1.00 per sq ft of NEW floor area in most commercial/mixed-use zone districts (CC1/CC2/CC3, LMU1/LMU2, PA, ABD, CSC, HS, VVT, HDMF); $0.70/sq ft in SB/RD
Transportation Impact Fee — net-new commercial floor areaSpecific current per-square-foot dollar figures for these categories could not be reliably extracted from the fee-schedule PDF's table layout in this review — confirm directly with the Building Department (970-479-2139) before budgeting; not fabricated here
Applies only if the addition/remodel adds net-new enclosed floor area, under the Facilities/Health Care/Office & Other Services/Restaurant & Retail categories of the Resolution No. 27, Series 2025 schedule
Will Call Inspection Fee
$5.00 per work type
Revisions
$75.00/hour, 2-hour minimum

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Remodel / Tenant Improvement / Addition Permit permit actually take in Vail?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Frame / Structural

    Framing and any structural wall-removal work verified before cover (if applicable to project scope)

  2. 2

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  3. 3

    Final Inspection

    All work complete per approved plans and applicable codes

See the full Vail inspection guide — scheduling & re-inspection fees →

Tips

  • Vail bundles Commercial Remodel, Tenant Improvement, and Commercial Addition into ONE document-requirement column in the Town's own submittal matrix — there is no separate, lighter 'TI-only' category the way residential interior remodels get their own lighter column. Budget for the fuller Commercial/Multi-Family document set unless your specific items are excused (no addition, no exterior changes).
  • A pure interior tenant improvement that does not affect fire-resistive rated construction, structural items, egress, or plumbing/electrical systems can skip stamped professional drawings entirely — this is a genuine, narrow carve-out worth confirming with the Building Department (970-479-2139) before paying for a full stamped plan set on a light TI scope.
  • Recreation Fee and Transportation Impact Fee are both keyed to NEW/net-new square footage — a like-for-like tenant improvement that adds no floor area should not be billed either fee, but any addition component will trigger both.

Frequently asked questions

Vail requires a commercial remodel / tenant improvement / addition permit for: Design Review Board (DRB) approval required before building permit submittal ONLY if the project includes exterior changes — the Commercial packet lists Elevations as 'Only if exterior changes' for this scope, unlike New Commercial/Multi-Family construction which always requires them; Per the Commercial/Multi-Family Minimum Project Submittal Requirements matrix (Commercial Remodel/TI/Addition column): Title Page/Code Analysis, Survey/Site Plan, Civil Plan, Structural Calculations, Floor Plan(s), Framing Plan(s), Reflected Ceiling Plan(s), Cross Sections/Details, Schedules, Electrical/Mechanical/Plumbing Plan(s), Statement of Special Inspection, and Energy Code Compliance Details are required; Soils Report and Foundation Plan(s) are required only 'if addition' (open-hole report at excavation for soils); Roof Plan(s) required only 'if addition'; Elevations required only if the project includes exterior changes — a pure interior tenant improvement with no addition and no exterior changes does not trigger these four items; EXCEPTION: tenant finishes and remodels that do NOT affect fire-resistive rated construction, structural items, means-of-egress components, plumbing systems, and/or electrical systems are NOT required to have stamped professional drawings (all other commercial/multi-family work requires drawings stamped, signed, and dated by a Colorado-licensed design professional); A Licensed Engineer report is required if any walls are proposed for removal, to determine if they are structural; Asbestos test report by a registered Colorado Asbestos inspector required at submittal for all projects, per State of Colorado asbestos regulations; Statement of Special Inspection required per IBC Chapter 17, performed by a Town of Vail-approved 3rd-party Special Inspector; All contractors must hold a current Town of Vail Contractor Registration in addition to any required Colorado state trade license; Minimum 2 paper plan sets if submitting paper (11x17 minimum, 24x36 recommended); electronic plan sets uploaded to ProjectDox after a completeness review. If your project isn't listed, confirm with Town of Vail Community Development Department, Building Division at 970-479-2139 before starting work.

In Vail, the published Building Permit Fee (same shared valuation-based schedule used for Building/Plumbing/Mechanical on all project types) is: $50.00 minimum for $1-$500 valuation, scaling through $6,120.25 for the first $1,000,000 plus $4.00/$1,000 thereafter for $1,000,001+. Additional published fees: Building Plan Review Fee — 65% of Building Permit Fee; Construction Use Tax — (Valuation minus $10,000) / 2, multiplied by 4%; Recreation Fee — commercial core/mixed-use zone districts — $1.00 per sq ft of NEW floor area in most commercial/mixed-use zone districts (CC1/CC2/CC3, LMU1/LMU2, PA, ABD, CSC, HS, VVT, HDMF); $0.70/sq ft in SB/RD; Transportation Impact Fee — net-new commercial floor area — Applies only if the addition/remodel adds net-new enclosed floor area, under the Facilities/Health Care/Office & Other Services/Restaurant & Retail categories of the Resolution No. 27, Series 2025 schedule; Will Call Inspection Fee — $5.00 per work type; Revisions — $75.00/hour, 2-hour minimum. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Vail does not publish a plan-review timeline for this permit. Contact Town of Vail Community Development Department, Building Division at 970-479-2139 for current turnaround.

You'll need: Construction Permit Application (Building, Plumbing & Mechanical); Minimum Project Submittal Requirements — Commercial and Multi-Family Packet (Commercial Remodel/TI/Addition column); Asbestos Test Report. Depending on your project, Vail may also ask for: Licensed Engineer Report. See the required-documents checklist on this page for details on each.

Vail requires 3 inspection(s) for a commercial remodel / tenant improvement / addition permit, in order: Rough Frame / Structural, Rough Electrical / Plumbing / Mechanical, Final Inspection. Schedule each through Town of Vail Community Development Department, Building Division (970-479-2139).

Apply through Town of Vail Community Development Department, Building Division at 75 S. Frontage Road West, Vail, CO 81657. Phone: 970-479-2139, email: info@vail.gov. Office hours: Town of Vail main line 970-479-2100; Building Department direct line 970-479-2139; Chief Building Official emergency line 970-479-2143. Combination Inspector direct lines also published: Mike Horning (970) 479-2253, Jeff Lake (970) 479-2142.. Official information: https://www.vail.gov/government/departments/community-development/building-department.

No. DRB approval is required only if the project includes exterior changes. A purely interior tenant improvement with no exterior work does not trigger the DRB prerequisite, unlike additions or projects with any exterior design element.

Not always. The Town's Commercial and Multi-Family submittal requirements explicitly exempt tenant finishes and remodels that do not affect fire-resistive rated construction, structural items, means-of-egress components, or plumbing/electrical systems from the stamped-drawing requirement. All other commercial work requires plans stamped, signed, and dated by a Colorado Registered Design Professional.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Vail building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Vail.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.