Winter Park building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Winter Park, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 50 Vasquez Road, Suite B, P.O. Box 3327, Winter Park, CO 80482
- Phone
- (970) 726-8081
- permits@wpgov.com
- Office hours
- Monday-Friday, 8:00am-5:00pm
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Footing and Foundation Inspection
Must be performed/certified by a licensed Colorado design professional; includes reinforcing, UFER ground, damp-proofing, and perimeter drain as required
- 2
Drilled Pier Inspection (if applicable)
Made while piers are being drilled; licensed Colorado engineer of record or authorized representative must be present
- 3
Lowest Floor Elevation / Elevation Certificate
Submitted upon completion of footing/foundation and lowest floor placement, prior to further vertical construction and before framing begins, for Planning Division review
- 4
Rough Framing / Rough Plumbing / Rough Mechanical
Trade rough-ins before concealment; separate sub-permits required (plumbing per state-adopted IPC edition; mechanical per 2021 IMC)
- 5
Energy Efficiency Inspection
Envelope insulation R/U-values, fenestration U-values, duct system R-values, HVAC/water-heating efficiency; at owner's expense
- 6
Final Building Inspection
Requires all fees paid and sales/use tax audit completed or waived by the Town Manager before a certificate of occupancy is issued; 24 hours required after final inspection to prepare final documents
Applies to: Residential Addition / Remodel Permit
- 1
Rough Framing (if structural)
- 2
Rough Plumbing / Mechanical (if applicable to scope)
- 3
Final Building Inspection
Requires sales/use tax audit completion or waiver before certificate of occupancy/completion
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment installed but not concealed
- 2
Final Mechanical
Applies to: Plumbing Permit
- 1
Rough Plumbing
Underground and rough-in plumbing installed, before concealment
- 2
Final Plumbing
Applies to: Roofing Permit (Re-Roof)
- 1
Underlayment / Ice Barrier Inspection
Ice barrier and drip-edge installation verified before roof covering is completed
- 2
Final Building Inspection
Applies to: Solar Photovoltaic (PV) Permit
- 1
Building Final (Winter Park/Fraser/Granby Building Department)
Racking, roof penetrations, and structural attachment verified
- 2
Electrical Final (State Electrical Board)
Wiring, inverter, and interconnection verified before energizing
Final inspection only: Electrical Permit, EV Charger / Electric Vehicle Charging Station Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Winter Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Winter Park building permits
Get alerts for Winter Park
We'll email you when Winter Park's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.