Plumbing Permit — Winter Park, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://codelibrary.amlegal.com/codes/winterparkco/latest/winterpark_co/0-0-0-2509
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Winter Park, Colorado
Required for plumbing installation, alteration, or repair within the joint Winter Park/Fraser/Granby jurisdiction. Reviewed under the International Plumbing Code (most current edition as adopted by the State of Colorado, per Town Code 6-1-1), administered by the Winter Park/Fraser/Granby Building Department (unlike electrical, plumbing permits ARE issued locally, not by a state board).
Verified 2026-07-06 · Source
When you need this permit
- Plumbing scope is captured on the same joint Building Permit Application (Towns of Winter Park, Fraser and Granby) via the 'Plumbing Valuation' field, or as a standalone plumbing permit for plumbing-only work
- Governed by the International Plumbing Code as most currently adopted by the State of Colorado; where Colorado's plumbing code is more restrictive than a Town Code provision, the more restrictive standard applies
- Toilet facilities must be provided for construction workers on active job sites, maintained sanitarily from project start until certificate of occupancy (Town Code 6-1-2, Section 2901.2 / 6-1-3, Section R306.5)
- Sewer depth requirements are set by the local water and sanitation district having jurisdiction (Town Code 6-1-3, amending IRC P2603.6.1), not a fixed Town Code number
- Vent pipe roof extensions must terminate at 12 inches above the roof (24 inches from the roof peak) or, where the roof is used for purposes beyond weather protection, extend at least 7 feet above the roof (Town Code 6-1-3, amending IRC P3103.1)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Plumbing
Underground and rough-in plumbing installed, before concealment
- 2
Final Plumbing
See the full Winter Park inspection guide — scheduling & re-inspection fees →
Tips
- Unlike electrical, plumbing permits in Winter Park ARE issued by the local joint Building Department, not a state board — do not conflate the two trades' differing jurisdictional paths.
- Sewer depth is governed by whichever water/sanitation district has jurisdiction over the specific parcel, not a single Town-wide number — confirm with the applicable district (Winter Park Water & Sanitation District or Grand County Water & Sanitation District No. 1) early.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Winter Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Winter Park
Plumbing Permit in other cities
Compare plumbing permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Winter Park project checklist
Describe your project once and get every permit, document, and fee it triggers in Winter Park — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →