EV Charger / Electric Vehicle Charging Station Permit — Winter Park, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://wpgov.com/our-government/departments/building/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / Electric Vehicle Charging Station Permit in Winter Park, Colorado
Winter Park has no dedicated EV charger/EVSE permit type or fee line separate from its general electrical permitting process. Per the Town's own Building Division page, the Colorado State Electrical Board (DORA/DPO) handles ALL electrical permitting in Winter Park, Fraser, and Granby — this necessarily includes the branch-circuit wiring, panel work, and equipment installation for Level 1/Level 2 EV chargers, since EVSE installation is an electrical-trade permit, not a structural/building permit. There is no local Building Division fee schedule line item for 'EV charger,' 'electric vehicle,' or 'charging station' (confirmed via review of the Town's Building Permit Fee Schedule PDF). Winter Park (population under 1,000) falls well below the population thresholds (10,000+ for municipalities, 20,000+ for counties) that trigger Colorado's HB24-1173 EV Charging System Permit Requirements law, so the Town is not a 'covered municipality' required to adopt the state's expedited EV charger permitting model code or the 3-business-day approval/denial notification timeline. Re-confirmed 2026-07-20 via a direct re-fetch of the Town's Building Division page (live, unchanged): "The Colorado State Electrical Board handles all electrical permitting in Winter Park, Fraser and Granby." Because Grand County/Winter Park has no local electrical inspection program, the governing mechanism is the State Electrical Board's direct statutory authority under C.R.S. § 12-115-120(2): a state electrical inspector must inspect the work within three WORKING days of the inspection request (§ 12-115-120(2)(b)), and the Board sets its own permit fee based on "the actual expense of inspecting each type of electrical installation" (§ 12-115-121(1)) rather than a published table — confirmed against both statute sections and the Board's current rules (3 CCR 710-1), which likewise publish no static fee schedule.
Verified 2026-07-20 · Source
When you need this permit
- Apply directly to the Colorado State Electrical Board (Division of Professions and Occupations) for the electrical permit covering EV charger circuit wiring, panel/service upgrades if needed, and equipment installation — not through the local Winter Park/Fraser/Granby Building Department, per the Town's own statement that the State Electrical Board handles all electrical permitting in Winter Park, Fraser and Granby
- Electrical work must be performed by a Colorado-licensed electrician per Town Code 6-1-10 (NEC adoption) Contractor
- If the EV charger installation is part of new construction or requires structural/mounting work (e.g., a new carport or panel enclosure), a separate structural building permit from the Winter Park/Fraser/Granby Building Department may also be required for that portion
- Winter Park is NOT a 'covered municipality' under Colorado HB24-1173 (population under the 10,000-resident threshold), so the state's mandatory EV charger permitting model code and 3-business-day decision-notification requirement do not apply here as a matter of state law, though the Town may voluntarily follow similar practices
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Board Inspection
Scheduled and performed by the Colorado State Electrical Board for the EV charger circuit and equipment installation, not the local Building Division
See the full Winter Park inspection guide — scheduling & re-inspection fees →
Tips
- Treat an EV charger installation in Winter Park as an electrical permit filed directly with the Colorado State Electrical Board — do not attempt to fold it into the joint Winter Park/Fraser/Granby building permit application.
- Because Winter Park's population is under the HB24-1173 'covered municipality' threshold, don't assume the state's 3-business-day decision timeline or the EV charger permitting model code apply here; confirm current practice directly with the Town and the State Electrical Board.
- The governing statutory timeline for a state-inspected EV charger circuit is C.R.S. § 12-115-120(2)(b) — a 3-working-day inspection turnaround after the request is filed — not HB24-1173's 3-business-day decision clock, which only binds "covered" jurisdictions above the population threshold.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Winter Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Winter Park
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Winter Park project checklist
Describe your project once and get every permit, document, and fee it triggers in Winter Park — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.